← Back
Two stories - detached, small or mid-size
58-42 76 STREET
QUEENS · BIN 4063330
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R4Zoning
1,392 sfGross Floor Area
1Units
3 Open Violations 0 unresolved · 3 paperwork only ▸
Two stories - detached, small or mid-size · 4,720 sf lot · 0.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction10p · 2 filings · 20 docs
Floor 1Under Construction12p · 2 filings · 20 docs
CellarUnder Construction12p · 3 filings · 20 docs
Sub-BasementUnder Construction1p · 1 filing · 4 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/27/2023$900K—— → —$647/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE102/20/2026
AR ARCHITECT P.C301/09/2026
TERRAFORM ARCHITECTURE PLLC408/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JETER EXPEDITOR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FABIO'S CUSTOM MASONRY ANGeneral Contractor604/09/2026
ARANGO POOLSGeneral Contractor307/14/2026
JUST PLBG & HTG INCPlumbing109/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NORMAN C. LOK818301/09/2026
AR ARCHITECT P.C.1171112/18/2025
Building Lifecycle
All (64)Filed (8)Permit Issued (8)Violation (4)Objection (14)Special Inspection (30)
09/21/2026
Permit issued — Plumbing
Q01248824-S1-PL
07/13/2026
Permit issued — Construction Fence
Q01080910-I1-FN
07/01/2026
Violation issued (ECB, open)
Construction
06/01/2026
Violation issued (ECB, open)
Construction
06/01/2026
Violation issued (ECB, open)
Unknown
05/01/2026
Permit issued — Foundation
Q01362375-I1-FO
04/30/2026
Permit issued — General Construction
Q01248824-I1-GC
02/20/2026
Filed — Alteration
Q01362375-I1
02/19/2026
Special inspection requirement — Final
LEON SKVIRSKY
02/19/2026
Special inspection requirement — Footing and Foundation
NORMAN LOK
01/09/2026
Filed — Alteration
Q01248824-S1
01/09/2026
Filed — Alteration
Q01248824-S2
01/09/2026
Special inspection requirement — Maintenance information
01/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
01/09/2026
Special inspection requirement — Permanent certificate
01/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
01/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
01/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
01/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
ANGEL ROJAS
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
ANGEL ROJAS
12/18/2025
Filed — Alteration
Q01248824-I1
11/19/2025
Special inspection requirement — Lighting controls
ANGEL ROJAS
11/19/2025
Special inspection requirement — Chimneys and vents
ANGEL ROJAS
11/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ANGEL ROJAS
11/19/2025
Special inspection requirement — Permanent certificate
ANGEL ROJAS
11/19/2025
Special inspection requirement — Fenestration areas
ANGEL ROJAS
11/19/2025
Special inspection requirement — Air barrier - visual inspection
ANGEL ROJAS
11/19/2025
Special inspection requirement — Fireplaces
ANGEL ROJAS
11/19/2025
Special inspection requirement — Insulation placement and R values
ANGEL ROJAS
11/19/2025
Special inspection requirement — Exterior lighting power
ANGEL ROJAS
11/19/2025
Special inspection requirement — Fenestration air leakage
ANGEL ROJAS
11/19/2025
Special inspection requirement — Interior lighting power
ANGEL ROJAS
11/19/2025
Special inspection requirement — Maintenance information
ANGEL ROJAS
11/19/2025
Special inspection requirement — Post-installed Anchors
ANGEL ROJAS
09/29/2025
Special inspection requirement — Concrete - Cast-In-Place
NORMAN LOK
09/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
09/29/2025
Special inspection requirement — Final
ADITYA DESAI
09/29/2025
Special inspection requirement — Energy Code Compliance Inspections
NORMAN LOK
08/22/2025
Filed — Alteration
Prop construct. to exist 1 fam, remove & replace exist'g out door steps,part of concrete garage & retaining wall which are located outside the property line in order to bring property into compliance and file with DOT new sidewalk no change use egress occ
Q01081020-P2
07/15/2025
Special inspection requirement — Final
MOHAMMAD AHEAD
07/15/2025
Special inspection requirement — Concrete - Cast-In-Place
NORMAN LOK
06/12/2025
Permit issued — General Construction
Q01081020-I1-GC-CX
06/12/2025
Permit issued — Construction Fence
Q01080910-I1-FN
04/10/2025
Permit issued — Structural
Q01081020-I1-GC-CX
02/27/2025
Permit issued — Construction Fence
Q01080910-I1-FN
11/13/2024
Filed — Alteration
Prop construct. to exist 1 fam, remove & replace exist'g out door steps,part of concrete garage & retaining wall which are located outside the property line in order to bring property into compliance and file with DOT new sidewalk no change use egress occ
Q01081020-P1
09/16/2024
Objection resolved — Addressed
09/16/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection resolved — Addressed
08/21/2024
Objection raised — Structural
08/21/2024
Objection raised — Zoning
08/21/2024
Objection raised — Zoning
08/07/2024
Objection resolved — Addressed
07/31/2024
Objection raised — Inspections
07/31/2024
Objection raised — Scope
07/31/2024
Objection raised — Scope
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedJUST PLBG & HTG INC09/21/2026
DOB NOWConstruction FencePermit IssuedARANGO POOLS INC07/13/2026
DOB NOWFoundationPermit IssuedARANGO POOLS INC05/01/2026
DOB NOWGeneral ConstructionPermit IssuedARANGO POOLS INC04/30/2026
DOB NOWGeneral ConstructionSigned-offFABIO'S CUSTOM MASONRY06/12/2025
DOB NOWConstruction FencePermit IssuedFABIO'S CUSTOM MASONRY06/12/2025
DOB NOWStructuralSigned-offFABIO'S CUSTOM MASONRY04/10/2025
DOB NOWConstruction FencePermit IssuedFABIO'S CUSTOM MASONRY02/27/2025
1 project · most recent 08/22/2025
Concrete
FiledStatusContractorScope
08/22/2025Signed-offFABIO'S CUSTOM MASONRY ANConcrete
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
02/19/2026FinalLEON SKVIRSKYprogress
02/19/2026Footing and FoundationNORMAN LOKprogress
01/09/2026Maintenance information—energy_progress
01/09/2026HVAC-R and service water heating equipment—energy_progress
01/09/2026Permanent certificate—energy_progress
01/09/2026HVAC-R and service water piping design and insulation—energy_progress
01/09/2026HVAC-R and service water heating system controls—energy_progress
01/09/2026Energy Code Compliance Inspections—progress
01/08/2026Fire-Resistant Penetrations and Joints—special
01/06/2026Fire-Resistance Rated ConstructionANGEL ROJASprogress
01/06/2026Energy Code Compliance InspectionsANGEL ROJASprogress
11/19/2025Lighting controlsANGEL ROJASenergy_progress
11/19/2025Chimneys and ventsANGEL ROJASspecial
11/19/2025Fenestration and door U-factor and product ratingsANGEL ROJASenergy_progress
11/19/2025Permanent certificateANGEL ROJASenergy_progress
11/19/2025Fenestration areasANGEL ROJASenergy_progress
11/19/2025Air barrier - visual inspectionANGEL ROJASenergy_progress
11/19/2025FireplacesANGEL ROJASenergy_progress
11/19/2025Insulation placement and R valuesANGEL ROJASenergy_progress
11/19/2025Exterior lighting powerANGEL ROJASenergy_progress
11/19/2025Fenestration air leakageANGEL ROJASenergy_progress
11/19/2025Interior lighting powerANGEL ROJASenergy_progress
11/19/2025Maintenance informationANGEL ROJASenergy_progress
11/19/2025Post-installed AnchorsANGEL ROJASspecial
09/29/2025Concrete - Cast-In-PlaceNORMAN LOKspecial
Latest 25 of 39.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/22/2026Q01080910-I1Request digital key ↗
08/22/2026Q01081020-I1Request digital key ↗
08/22/2026Q01081020-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature19
08/27/2026Q01081020-P2Open ↗
08/27/2026Q01081020-P2Open ↗
08/26/2026Q01248824-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026Q01080910-I1Open ↗
08/22/2026Q01081020-P1Open ↗
08/22/2026Q01081020-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/27/2026Q01081020-P2Open ↗
08/26/2026Q01248824-I1Open ↗
08/26/2026Q01248824-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026Q01248824-S2Open ↗
08/18/2026Q01248824-S1Open ↗
08/18/2026Q01248824-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01362375-I1Open ↗