ECB09/19/2026At the time of inspection of a proposed 3-story new building, i observed a sidewalk shed erected along a driveway. Vertical posts on both sides of the driveway lacked required highly visible markings, creating$2K due
ECB09/19/2026At the time of inspection of a 3-story new building, i observed the erected sidewalk shed at exposure 1 missing the required parapet information panel. This condition may impede first responders from readily id$1K due
ECB09/16/2026Upon inspection, an open construction site was observed. A significant amount of overgrown brush and vegetation present on exp 3, creating hazardous conditions for workers accessing and performing work at that$2K due
ECB09/16/2026BC3307.7 ., BC3307.7.1 & 28-105.1 .observed active site with expire fence permit also noted fence drawings has been not submited and approved by department of buildings . Stop all work immediatelly renew permit$1K due
ECB09/16/2026Bc 3309.1 & BC3301.1.1 observed: active site working on 2ND and 3RD level cs present upon inspection noted adjacent property windows and site exp 4 has been not protected as soon get 2ND floor level conformin$5K due
ECB09/16/2026Observed: cs present, structural steel fraiming going on 2ND and 3RD level upon visual inspection noted there missing bolts, placed not tight enough., and approved drawings moment conection detail 3/S201 showin$2K due