1964Year Built
1Stories
E1Building Class
M1-1Zoning
60,600 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
General warehouse · Owner of record: ALLE PROCESSING CORP · 85,250 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAYER SILBER ARCHITECT P.C.311/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITER GROUP603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor809/18/2026
HORSEPOWER ELECTRIC.&Electrical203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781211/19/2024
Building Lifecycle
All (28)Filed (3)Permit Issued (4)Violation (1)Objection (14)Special Inspection (6)
09/17/2026
Permit issued — Earth Work
Q00788074-I1-GC-CX
09/15/2025
Permit issued — Earth Work
Q00788074-I1-GC-CX
12/03/2024
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
12/03/2024
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
12/03/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
11/19/2024
Filed — Alteration
Filed Herewith to Prepare site and install concrete pads and concrete barriers for transformers, switchgear and zero emissions energy storage systems. EL to be filed separately. As per BB2019-002 Battery energy storage systems (BESS). OTCR#95-19
Q00788074-P1
11/18/2024
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
11/18/2024
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
11/18/2024
Special inspection requirement — Final
CHRISTIAN LOZADA
09/16/2024
Permit issued — General Construction
Q00788074-I1-GC-CX
06/19/2024
Objection resolved — Resolved
06/19/2024
Objection resolved — Resolved
06/19/2024
Objection resolved — Resolved
06/19/2024
Objection resolved — Resolved
03/29/2024
Objection raised — Other
03/25/2024
Objection raised — Other
03/25/2024
Objection raised — Other
03/25/2024
Objection raised — Other
03/21/2024
Filed — Alteration
Filed Herewith to Prepare site and install concrete pads and concrete barriers for transformers, switchgear and zero emissions energy storage systems. EL to be filed separately. As per BB2019-002 Battery energy storage systems (BESS). OTCR#95-19
Q00788074-S2
08/14/2023
Permit issued — Earth Work
Q00788074-I1-GC-CX
04/02/2023
Objection raised — Inspections
04/02/2023
Objection resolved — Addressed
04/02/2023
Objection raised — Scope
04/02/2023
Objection resolved — Addressed
04/02/2023
Objection raised — Zoning
04/02/2023
Objection resolved — Addressed
03/28/2023
Filed — Alteration
Filed Herewith to Prepare site and install concrete pads and concrete barriers for transformers, switchgear and zero emissions energy storage systems. EL to be filed separately. As per BB2019-002 Battery energy storage systems (BESS). OTCR#95-19
Q00788074-I1
09/12/2006
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedJ&J DESIGNS INC09/17/2026
DOB NOWEarth WorkPermit IssuedJ&J DESIGNS INC09/15/2025
DOB NOWGeneral ConstructionPermit IssuedJ&J DESIGNS INC09/16/2024
DOB NOWEarth WorkPermit IssuedJ&J DESIGNS INC08/14/2023
BISMHISSUEDSPEEDWAY PLUMBING05/15/2001
BISMHISSUEDJ K CONST.04/24/2001
BISPLISSUEDSPEEDWAY PLUMBING CORP12/13/2000
BISPLISSUEDM&J PLUMBING & MECH.CO.09/29/1997
BISOTRE-ISSUEDBARTONI CONST INC09/23/1997
BISOTISSUEDINDUSTRIAL SHEET METAL PRODUCTS03/29/1994
BISPLISSUEDWOLF PLUMBING_& HEATING CORP03/01/1994
BISSPISSUEDWOLF PLUMBING_& HEATING CORP03/01/1994
3 projects · most recent 12/17/2024
General Wiring
FiledStatusContractorScope
12/17/2024Permit IssuedHORSEPOWER ELECTRIC.&General Wiring
12/10/2024Permit IssuedHORSEPOWER ELECTRIC.&General Wiring
11/04/2024Permit IssuedHORSEPOWER ELECTRIC.&General Wiring
1 project · most recent 11/19/2024
FiledStatusContractorScope
11/19/2024Permit IssuedJ&J DESIGNS INC2 scope_items
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/03/2024Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
12/03/2024Subgrade InspectionsCHRISTIAN LOZADAspecial
12/03/2024FinalCHRISTIAN LOZADAprogress
11/18/2024Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
11/18/2024Subgrade InspectionsCHRISTIAN LOZADAspecial
11/18/2024FinalCHRISTIAN LOZADAprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026Q00788074-P1Request digital key ↗
08/21/2026Q00788074-S2Request digital key ↗
08/14/2026Q00788074-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026Q00788074-P1Open ↗
08/13/2026Q00788074-I1Open ↗
08/13/2026Q00788074-S2Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00788074-P1Open ↗
08/23/2026Q00788074-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q00788074-P1Open ↗
08/23/2026Q00788074-I1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00788074-I1Open ↗