← Back
BuildNYC
Two stories - detached, small or mid-size
58-56 OCEANIA STREET
QUEENS · Bayside · BIN 4160627
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R2AZoning
2,297 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3p · 2 filings · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
Basement1p · 1 filing · 9 docs
Site & exteriorConstruction fence1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chris Kim Engineering110/10/2025
Vatche Ghazarian, PE610/20/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G&G Best ConstructionGeneral Contractor303/21/2026
Sunation Solar SystemsGeneral Contractor303/21/2026
G&G Best ConstructionScaffold107/08/2026
Amm General ContractingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Barun8842110/10/2025
AA Building & Inspection1519510/20/2023
Building Lifecycle
01/06/2026
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01298862-I1
10/20/2025
Permit issued — Solar
Q01298862-I1-SL
10/10/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01298862-I1
10/07/2025
Special inspection requirement — Air barrier - visual inspection
CHRIS KIM
10/07/2025
Special inspection requirement — Final
CHRIS KIM
64 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunation Solar Systems10/20/2025
DOB NOWPlumbingSigned-offAmm General Contracting11/18/2022
DOB NOWMechanical SystemsPermit IssuedG&G Best Construction11/01/2022
DOB NOWConstruction FenceSigned-offG&G Best Construction10/26/2022
1 project · most recent 10/20/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
10/20/2023Permit IssuedG&G Best ConstructionAir Conditioning Systems, Heating Systems, Ventilation Systems
1 project · most recent 10/20/2023
Water/Sanitary
FiledStatusContractorScope
10/20/2023Signed-offAmm General ContractingWater/Sanitary
2 projects · most recent 10/03/2025
General Wiring
FiledStatusContractorScope
10/03/2025CompleteGallant Electrical Construction—
03/11/2023CompleteRiviera ElectricGeneral Wiring
1 project · most recent 10/20/2023
Wood
FiledStatusContractorScope
10/20/2023Signed-offAmm General ContractingWood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
10/07/2025Air barrier - visual inspectionCHRIS KIMenergy_progress
10/07/2025FinalCHRIS KIMprogress
10/07/2025Energy Code Compliance InspectionsCHRIS KIMprogress
10/07/2025Structural Stability – Alterations of existing buildingsCHRIS KIMspecial
10/07/2025Fire-Resistant Penetrations and JointsCHRIS KIMspecial
10/20/2023Interior lighting powerVatche Ghazarianenergy_progress
10/20/2023Structural Wood FrameVatche Ghazarianprogress
10/20/2023FinalVatche Ghazarianprogress
10/20/2023Air barrier - visual inspectionVatche Ghazarianenergy_progress
10/20/2023Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
10/20/2023Mechanical SystemsYounes Abouyaalaspecial
10/20/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/20/2023Energy Code Compliance InspectionsVatche Ghazarianprogress
10/20/2023Fenestration air leakageVatche Ghazarianenergy_progress
10/20/2023Insulation placement and R valuesVatche Ghazarianenergy_progress
10/20/2023Fenestration and door U-factor and product ratingsVatche Ghazarianenergy_progress
10/20/2023Fenestration areasVatche Ghazarianenergy_progress
10/02/2023Mechanical SystemsYounes Abouyaalaspecial
10/02/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/02/2023Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
10/02/2023Structural Wood FrameVatche Ghazarianprogress
10/02/2023FinalVatche Ghazarianprogress
10/02/2023Energy Code Compliance InspectionsVatche Ghazarianprogress
10/02/2023Interior lighting powerVatche Ghazarianenergy_progress
10/02/2023Fenestration air leakageVatche Ghazarianenergy_progress
Latest 25 of 57.
98 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account