58 BROOKLYN AVENUE
BROOKLYN · BIN 3807698
💬 Discuss this project
0Year Built
—Stories
V1Building Class
C8-2Zoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: THE SMILE REALTS LLC · 1,200 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction76p · 1 filing · 20 docs
Floor 2Under Construction68p · 1 filing · 20 docs
Floor 1Under Construction68p · 1 filing · 20 docs
MezzanineUnder Construction10p · 1 filing · 20 docs
CellarUnder Construction39p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CITISCAPE CONSULTING LTD4809/16/2026
A+ CHOICE CONSTRUCTION1009/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/28/2023$185K—Private party → THE SMILE REALTS LLC— not available
03/11/2016$360K—Private party → JMD EQUITIES II, INC.— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITISCAPE CONSULTING LTD2308/26/2026
MCHENERY TESTING LAB304/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITISCAPE CONSULTING LTD3803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADIR STUCCO INCGeneral Contractor509/16/2026
A+ CHOICE CONSTRUCTION INGeneral Contractor409/09/2026
ARKENSTONE BUILDERS INCGeneral Contractor204/09/2026
ORBIT PLBG & HTG INCPlumbing107/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITISCAPE CONSULTING LTD762908/26/2026
IP CONCRETE TESTING AND I6252202/01/2024
Building Lifecycle
All (148)Filed (26)Permit Issued (10)Violation (3)Objection (79)Special Inspection (30)
09/15/2026
Permit issued — General Construction
B00909931-I1-GC
09/08/2026
Permit issued — Sidewalk Shed
B00909931-S8-SH
08/26/2026
Filed — New Building
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
B00909931-A8
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
08/26/2026
Special inspection requirement — Maintenance information
Alix Michel
08/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alix Michel
08/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alix Michel
08/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alix Michel
08/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alix Michel
08/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alix Michel
08/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alix Michel
08/13/2026
Special inspection requirement — Maintenance information
Alix Michel
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
08/11/2026
Objection resolved — Addressed
08/11/2026
Objection resolved — Addressed
08/11/2026
Objection resolved — Addressed
08/11/2026
Special inspection requirement — Shutoff dampers
08/04/2026
Objection resolved — Resolved
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
07/29/2026
Objection raised — Scope
07/29/2026
Objection raised — Structural
07/29/2026
Objection raised — Zoning
07/29/2026
Objection raised — Structural
07/29/2026
Objection raised — Scope
07/29/2026
Objection raised — Structural
07/28/2026
Objection raised — Scope
07/27/2026
Permit issued — Plumbing
B00909931-S6-PL
07/23/2026
Filed — New Building
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
B00909931-A6
07/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alix Michel
07/23/2026
Special inspection requirement — Maintenance information
Alix Michel
07/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alix Michel
07/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alix Michel
07/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joe Lieberman
07/22/2026
Filed — New Building
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
B00909931-A5
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2026
Special inspection requirement — Sprinkler Systems
07/22/2026
Special inspection requirement — Post-installed Anchors
07/09/2026
Filed — New Building
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
B00909931-A4
06/11/2026
Permit issued — Sidewalk Shed
B00909931-S8-SH
04/14/2026
Filed — New Building
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
B00909931-A3
03/16/2026
Permit issued — Sidewalk Shed
B00909931-S8-SH
03/02/2026
Permit issued — Supported Scaffold
B00909931-S9-SF
02/27/2026
Filed — New Building
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
B00909931-S9
02/27/2026
Filed — New Building
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
B00909931-S8
02/26/2026
Objection resolved — Addressed
02/25/2026
Objection raised — Scope
02/12/2026
Filed — New Building
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE.
B00909931-A2
01/16/2026
Violation issued (ECB, closed)
Construction
01/15/2026
Violation issued (ECB, closed)
Construction
12/30/2025
Permit issued — Foundation
B00909931-S1-FO
12/24/2025
Permit issued — Support of Excavation
B00909931-S3-SE
12/22/2025
Permit issued — General Construction
B00909931-I1-GC
12/03/2025
Permit issued — Construction Fence
B00909931-S4-FN
10/14/2025
Special inspection requirement — Structural Steel - High Strength Bolting
INDARDEO PARBHUNATH
10/14/2025
Special inspection requirement — Masonry
Joe Lieberman
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedADIR STUCCO INC09/15/2026
DOB NOWSidewalk ShedPermit IssuedA+ CHOICE CONSTRUCTION IN09/08/2026
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC07/27/2026
DOB NOWSidewalk ShedPermit IssuedA+ CHOICE CONSTRUCTION IN06/11/2026
DOB NOWSidewalk ShedPermit IssuedA+ CHOICE CONSTRUCTION IN03/16/2026
DOB NOWSupported ScaffoldSigned-offA+ CHOICE CONSTRUCTION IN03/02/2026
DOB NOWFoundationPermit IssuedARKENSTONE BUILDERS INC12/30/2025
DOB NOWSupport of ExcavationPermit IssuedARKENSTONE BUILDERS INC12/24/2025
DOB NOWGeneral ConstructionPermit IssuedADIR STUCCO INC12/22/2025
DOB NOWConstruction FencePermit IssuedADIR STUCCO INC12/03/2025
1 project · most recent 08/26/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/26/2026Permit IssuedADIR STUCCO INCAir Conditioning Systems
Cooling
Daikin FXSQ36M 40,000 BTU · Vrf Indoor ×3
RXTQ36TAVJU 37,000 BTU · Vrf Outdoor ×3
1 project · most recent 08/26/2026
Sprinkler System
FiledStatusContractorScope
08/26/2026——Sprinkler System
1 project · most recent 08/26/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/26/2026Permit IssuedORBIT PLBG & HTG INCStorm, Water/Sanitary
2 projects · most recent 07/31/2026
General Wiring
FiledStatusContractorScope
07/31/2026Permit IssuedLENS ELECTRIC, INCGeneral Wiring
03/12/2026Permit IssuedRICHARD NEU—
1 project · most recent 08/26/2026
Steel Masonry
FiledStatusContractorScope
08/26/2026Permit IssuedADIR STUCCO INCSteel, Masonry
1 project · most recent 08/26/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
08/26/2026Permit IssuedADIR STUCCO INCFence, Scaffold, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 123
DateRequirementInspectorRole
08/26/2026HVAC-R and service water piping design and insulationAlix Michelenergy_progress
08/26/2026Fire-Resistant Penetrations and JointsJoe Liebermanspecial
08/26/2026HVAC-R and service water heating system controlsAlix Michelenergy_progress
08/26/2026HVAC-R and service water heating equipmentAlix Michelenergy_progress
08/26/2026Maintenance informationAlix Michelenergy_progress
08/13/2026Fire-Resistant Penetrations and JointsJoe Liebermanspecial
08/13/2026HVAC-R and service water piping design and insulationAlix Michelenergy_progress
08/13/2026HVAC-R and service water heating equipmentAlix Michelenergy_progress
08/13/2026HVAC-R and service water heating system controlsAlix Michelenergy_progress
08/13/2026Maintenance informationAlix Michelenergy_progress
08/11/2026Shutoff dampers—energy_progress
07/23/2026HVAC-R and service water heating equipmentAlix Michelenergy_progress
07/23/2026Maintenance informationAlix Michelenergy_progress
07/23/2026HVAC-R and service water heating system controlsAlix Michelenergy_progress
07/23/2026HVAC-R and service water piping design and insulationAlix Michelenergy_progress
07/23/2026Fire-Resistant Penetrations and JointsJoe Liebermanspecial
07/22/2026Fire-Resistant Penetrations and Joints—special
07/22/2026Post-installed Anchors—special
07/22/2026Sprinkler Systems—special
10/14/2025Structural Steel - WeldingINDARDEO PARBHUNATHspecial
10/14/2025Structural Steel - High Strength BoltingINDARDEO PARBHUNATHspecial
10/14/2025MasonryJoe Liebermanspecial
10/14/2025Designated Seismic SystemJoe Liebermanspecial
10/14/2025Structural Cold-Formed SteelJoe Liebermanspecial
10/14/2025FinalJoe Liebermanprogress
Latest 25 of 123.
▾Documents — 121 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/25/2026B00909931-P4Request digital key ↗
08/25/2026B00909931-A3Request digital key ↗
08/25/2026B00909931-A4Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/11/2024340910009Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
12/11/2024340910009Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
08/15/2026B00909931-A4Open ↗
08/13/2026B00909931-I1Open ↗
08/13/2026B00909931-P6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/15/2026B00909931-A4Open ↗
08/13/2026B00909931-P5Open ↗
08/13/2026B00909931-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00909931-I1Open ↗
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/25/2026B00909931-A1Open ↗
08/25/2026B00909931-I1Open ↗
08/25/2026B00909931-S1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026B00909931-A8Open ↗
09/01/2026B00909931-I1Open ↗
09/01/2026B00909931-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/23/2026B00909931-A8Open ↗
09/01/2026B00909931-I1Open ↗
09/01/2026B00909931-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/11/2024340910009Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/11/2024340910009Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026B00909931-P5Open ↗
08/13/2026B00909931-P6Open ↗
08/13/2026B00909931-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist6
08/15/2026B00909931-I1Open ↗
08/15/2026B00909931-P6Open ↗
08/15/2026B00909931-A4Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
12/11/2024340910009Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00909931-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
12/11/2024340910009Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/11/2024340910009Open ↗
▸Other Documents22
▸DOB NOWSite Survey: Initial6
08/15/2026B00909931-A4Open ↗
08/13/2026B00909931-P6Open ↗
08/13/2026B00909931-P7Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/15/2026B00909931-A4Open ↗
08/13/2026B00909931-P7Open ↗
08/13/2026B00909931-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/15/2026B00909931-I1Open ↗
08/15/2026B00909931-P6Open ↗
08/15/2026B00909931-A4Open ↗
Showing 3 of 6 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
12/11/2024340910009Open ↗
12/11/2024340910009Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/11/2024340910009Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00909931-S3Open ↗