← Back
Two stories - detached, small or mid-size
58 COLLFIELD AVENUE
STATEN ISLAND · BIN 5028835
💬 Discuss this project
1950Year Built
1.5Stories
A1Building Class
R2Zoning
2,080 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,100 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivilGeneral
Floor 219p · 1 filing · 20 docs
Floor 119p · 1 filing · 20 docs
Cellar19p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRI-STAR CONSTRUCTION HOME IMPR3307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC911/15/2023
A TECH ENGINEERING NYC, PLLC.104/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRISTAR CONST HOME IMPROVGeneral Contractor1107/08/2026
M.A.C. PLUMBING, INCPlumbing207/08/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216411/15/2023
Building Lifecycle
All (75)Filed (10)Permit Issued (8)Signed Off (4)Violation (2)Inspection (15)Objection (6)Special Inspection (30)
11/27/2023
Special inspection requirement — Fenestration areas
Steven Savino
11/27/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
11/27/2023
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
11/27/2023
Special inspection requirement — Insulation placement and R values
Steven Savino
11/27/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Savino
11/27/2023
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
11/27/2023
Special inspection requirement — Fenestration air leakage
Steven Savino
11/27/2023
Special inspection requirement — Subgrade Inspections
Steven Savino
11/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
11/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
11/27/2023
Special inspection requirement — Air barrier — testing
Steven Savino
11/27/2023
Special inspection requirement — Permanent certificate
Steven Savino
11/27/2023
Special inspection requirement — Lighting in dwelling units
Steven Savino
11/27/2023
Special inspection requirement — Maintenance information
Steven Savino
11/27/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
11/15/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ADDITION, INTERIOR ALTERATIONS TO THE EXISTING HOUSE & NEW PORCH AND WOOD REAR DECK. PLUMBING FILED UNDER APPLICATION NO. S00615063.
S00529095-P3
09/29/2023
Special inspection requirement — Insulation placement and R values
Steven Savino
09/29/2023
Special inspection requirement — Maintenance information
Steven Savino
09/29/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
09/29/2023
Special inspection requirement — Permanent certificate
Steven Savino
09/29/2023
Special inspection requirement — Fenestration air leakage
Steven Savino
09/29/2023
Special inspection requirement — Subgrade Inspections
Steven Savino
09/29/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
09/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Savino
09/29/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
09/29/2023
Special inspection requirement — Fenestration areas
Steven Savino
09/29/2023
Special inspection requirement — Air barrier — testing
Steven Savino
09/29/2023
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
09/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
09/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
09/29/2023
Special inspection requirement — Lighting in dwelling units
Steven Savino
08/30/2023
Objection resolved — Addressed
08/02/2023
Objection raised — Scope
07/18/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ADDITION, INTERIOR ALTERATIONS TO THE EXISTING HOUSE & NEW PORCH AND WOOD REAR DECK. PLUMBING FILED UNDER APPLICATION NO. S00615063.
S00529095-P2
05/19/2023
Signed off — Alteration
S00615069-I1
05/18/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/12/2023
Permit issued — Curb Cut
S00615069-I1-CC
05/04/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
05/01/2023
Filed — Alteration
S00615069-I1
04/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2023
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00689036-I1
01/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/21/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/14/2022
Signed off — Alteration
CAP AND REMOVE GAS AND SANITARY FIXTURES ON ALL FLOORS AND INSTALL NEW GAS AND SANITARY FIXTURES ON ALL FLOORS.
S00615063-I1
12/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/07/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/17/2022
Permit issued — General Construction
S00529095-I1-GC
11/09/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
11/09/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/04/2022
Filed — Alteration
CAP AND REMOVE GAS AND SANITARY FIXTURES ON ALL FLOORS AND INSTALL NEW GAS AND SANITARY FIXTURES ON ALL FLOORS.
S00615063-P2
08/31/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/30/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/24/2022
Filed — Alteration
CAP AND REMOVE GAS AND SANITARY FIXTURES ON ALL FLOORS AND INSTALL NEW GAS AND SANITARY FIXTURES ON ALL FLOORS.
S00615063-P1
08/08/2022
Signed off — Alteration
S00615078-I1
06/27/2022
Objection resolved — Addressed
06/23/2022
Objection raised — Scope
06/02/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED HORIZONTAL AND VERTICAL ADDITION, INTERIOR ALTERATIONS TO THE EXISTING HOUSE & NEW PORCH AND WOOD REAR DECK. PLUMBING FILED UNDER APPLICATION NO. S00615063.
S00529095-P1
05/20/2022
Violation issued (ECB, closed)
Construction
05/06/2022
Permit issued — Plumbing
S33506469-I1-PL
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offTRISTAR CONST HOME IMPROV05/12/2023
DOB NOWGeneral ConstructionPermit IssuedTRISTAR CONST HOME IMPROV11/17/2022
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC05/06/2022
DOB NOWPlumbingSigned-offM.A.C. PLUMBING, INC04/29/2022
DOB NOWPlumbingSigned-offM.A.C. PLUMBING, INC03/28/2022
DOB NOWGeneral ConstructionPermit IssuedTRISTAR CONST HOME IMPROV02/02/2022
DOB NOWConstruction FenceSigned-offTRISTAR CONST HOME IMPROV01/11/2022
DOB NOWConstruction FenceSigned-offTRISTAR CONST HOME IMPROV11/15/2021
BISOTISSUEDTHOMAS JOSEPH MORRISEY PH04/17/2009
1 project · most recent 03/17/2022
General Wiring
FiledStatusContractorScope
03/17/2022CompleteMAXIMUM ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
05/18/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
05/04/2023Fail-Final CND-Occupancy InspectionFailView ↗
04/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/21/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/07/2022Pass-Final CND-Occupancy InspectionPassView ↗
11/09/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
11/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/30/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/31/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
11/27/2023Fire-Resistant Penetrations and JointsSteven Savinospecial
11/27/2023Maintenance informationSteven Savinoenergy_progress
11/27/2023Air barrier — testing Steven Savinoenergy_progress
11/27/2023Lighting in dwelling unitsSteven Savinoenergy_progress
11/27/2023Fenestration air leakageSteven Savinoenergy_progress
11/27/2023Permanent certificateSteven Savinoenergy_progress
11/27/2023Fenestration areasSteven Savinoenergy_progress
11/27/2023Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
11/27/2023Insulation placement and R valuesSteven Savinoenergy_progress
11/27/2023Energy Code Compliance InspectionsSteven Savinoprogress
11/27/2023Fire-Resistance Rated ConstructionSteven Savinoprogress
11/27/2023Structural Stability – Alterations of existing buildingsSteven Savinospecial
11/27/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/27/2023Subgrade InspectionsSteven Savinospecial
11/27/2023Concrete - Cast-In-PlaceSteven Savinospecial
09/29/2023Lighting in dwelling unitsSteven Savinoenergy_progress
09/29/2023Concrete - Cast-In-PlaceSteven Savinospecial
09/29/2023Fire-Resistant Penetrations and JointsSteven Savinospecial
09/29/2023Structural Stability – Alterations of existing buildingsSteven Savinospecial
09/29/2023Subgrade InspectionsSteven Savinospecial
09/29/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/29/2023Energy Code Compliance InspectionsSteven Savinoprogress
09/29/2023Fire-Resistance Rated ConstructionSteven Savinoprogress
09/29/2023Fenestration areasSteven Savinoenergy_progress
09/29/2023Air barrier — testing Steven Savinoenergy_progress
Latest 25 of 63.
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/25/2026S00615078-I1Request digital key ↗
08/24/2026S00689036-I1Request digital key ↗
08/23/2026S00615063-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
11/23/2021540210225Open ↗
01/20/2009510064617Open ↗
▸BISWORK PERMIT APPLICATION1
04/17/2009510064617Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
11/23/2021540210225Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026S00529095-P3Open ↗
08/13/2026S00529095-P1Open ↗
08/13/2026S00529095-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 13
08/13/2026S00615063-I1Open ↗
08/13/2026S00615063-P1Open ↗
08/13/2026S00615063-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00529095-I1Open ↗
▸Seals & Professional Certifications53
▸DOB NOWProgress Inspector Seal & Signature33
09/11/2026S00615063-P1Open ↗
09/11/2026S00615063-P1Open ↗
09/01/2026S00615063-P2Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026S00615078-I1Open ↗
08/24/2026S00689036-I1Open ↗
08/23/2026S00615069-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026S00529095-P3Open ↗
08/29/2026S00529095-P3Open ↗
08/23/2026S00529095-P2Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/04/2011510064617Open ↗
01/20/2009510064617Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/23/2021540210225Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/23/2021540210225Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/22/2026S00529095-P3Open ↗
08/14/2026S00529095-P1Open ↗
08/14/2026S00529095-P2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/20/2009510064617Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00615063-I1Open ↗
08/13/2026S00529095-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/13/2026S00529095-P2Open ↗
08/13/2026S00529095-I1Open ↗
08/13/2026S00529095-P1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
11/23/2021540210225Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
11/23/2021540210225Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00529095-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00529095-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/23/2021540210225Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/04/2011510064617Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
01/13/2009510064617Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/04/2011510064617Open ↗
01/20/2009510064617Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/23/2021540210225Open ↗
▸Other Documents9
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026S00529095-P2Open ↗
08/13/2026S00529095-P1Open ↗
08/13/2026S00529095-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026S00529095-P2Open ↗
08/13/2026S00529095-P3Open ↗
08/13/2026S00529095-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/23/2021540210225Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00529095-I1Open ↗