← Back
Condo, residential unit in 2-10 unit building
58 DUPONT STREET
BROOKLYN · Greenpoint · BIN 3429861
💬 Discuss this project
2023Year Built
4Stories
R1Building Class
R6BZoning
5,515 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential unit in 2-10 unit building · Owner of record: 58 DUPONT STREET LLC · 2,500 sf lot · 2.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionFire AlarmEquipmentCivilGeneral
Roof123p · 1 filing · 20 docs
Penthouse138p · 1 filing · 20 docs
Floor 4138p · 1 filing · 20 docs
Floor 3136p · 1 filing · 20 docs
Floor 2137p · 1 filing · 20 docs
Floor 1138p · 1 filing · 20 docs
Cellar141p · 1 filing · 20 docs
Site & exterior195p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JJS MANAGEMENT INC407/08/2026
TRIERA CONTRACTING407/08/2026
1249 DE KALB AVENUE203/21/2026
MUTUAL CENTRAL ALARM SERVICES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INFOCUS DESIGN AND PLANNING PC1805/28/2024
ASR ENGINEERING PC107/07/2023
ENTHINK ENGINEERS LLC103/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XH&RC PLUMBING AND HEATING INC3203/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MABE GROUP INCGeneral Contractor907/08/2026
HP BUILDING MANAGEMENT INGeneral Contractor807/08/2026
KENNETH FISK ELECTRIC CORElectrical103/22/2026
TRIERA CONTRACTING INCGeneral Contractor107/08/2026
PLBG P & H INCPlumbing107/08/2026
JJS MANAGEMENT INCGeneral Contractor107/08/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT40811705/28/2024
SYED ENGINEERING, P.C.7054107/07/2023
INFOCUS DESIGN & PLANNING932111/11/2022
Building Lifecycle
All (153)Filed (20)Permit Issued (21)Signed Off (8)Violation (6)Inspection (10)Objection (58)Special Inspection (30)
08/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/31/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/11/2024
Special inspection requirement — Masonry
ALDO BRAVO
06/11/2024
Special inspection requirement — Exterior lighting power
ALDO BRAVO
06/11/2024
Special inspection requirement — Protection of exposed foundation insulation
ALDO BRAVO
06/11/2024
Special inspection requirement — Interior lighting power
ALDO BRAVO
06/11/2024
Special inspection requirement — Subgrade Inspections
ALDO BRAVO
06/11/2024
Special inspection requirement — Metering
ALDO BRAVO
06/11/2024
Special inspection requirement — Air barrier - visual inspection
ALDO BRAVO
06/11/2024
Special inspection requirement — Fenestration air leakage
ALDO BRAVO
06/11/2024
Special inspection requirement — Maintenance information
ALDO BRAVO
06/11/2024
Special inspection requirement — Lighting in dwelling units
ALDO BRAVO
06/11/2024
Special inspection requirement — Lighting controls
ALDO BRAVO
06/11/2024
Special inspection requirement — Concrete - Cast-In-Place
ALDO BRAVO
06/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALDO BRAVO
06/11/2024
Special inspection requirement — Maintenance information
ALDO BRAVO
06/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALDO BRAVO
06/11/2024
Special inspection requirement — Insulation placement and R values
ALDO BRAVO
06/11/2024
Special inspection requirement — Concrete - Cast-In-Place
ALDO BRAVO
06/11/2024
Special inspection requirement — Metering
ALDO BRAVO
06/11/2024
Special inspection requirement — Electrical motors and elevators
ALDO BRAVO
06/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ALDO BRAVO
06/11/2024
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
06/11/2024
Special inspection requirement — Exterior lighting power
ALDO BRAVO
06/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
06/11/2024
Special inspection requirement — Masonry
ALDO BRAVO
06/11/2024
Special inspection requirement — Subgrade Inspections
ALDO BRAVO
06/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
06/11/2024
Special inspection requirement — Fenestration areas
ALDO BRAVO
06/11/2024
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
06/11/2024
Special inspection requirement — Insulation placement and R values
ALDO BRAVO
06/11/2024
Special inspection requirement — Electrical motors and elevators
ALDO BRAVO
05/28/2024
Filed — New Building
THIS APPLICATION IS FILED FOR A 4-STORY & PENTHOUSE, 4-UNIT RESIDENTIAL BUILDING.
B00742434-A2
05/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/07/2024
Filed — New Building
THIS APPLICATION IS FILED FOR A 4-STORY & PENTHOUSE, 4-UNIT RESIDENTIAL BUILDING.
B00742434-A1
04/23/2024
Signed off — New Building
THIS APPLICATION IS FILED FOR A 4-STORY & PENTHOUSE, 4-UNIT RESIDENTIAL BUILDING.
B00742434-S2
04/18/2024
Objection resolved — Addressed
04/09/2024
Objection raised — Other
04/02/2024
Filed — New Building
THIS APPLICATION IS FILED FOR A 4-STORY & PENTHOUSE, 4-UNIT RESIDENTIAL BUILDING.
B00742434-P8
04/01/2024
Filed — New Building
THIS APPLICATION IS FILED FOR A 4-STORY & PENTHOUSE, 4-UNIT RESIDENTIAL BUILDING.
B00742434-P9
03/28/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/11/2024
Signed off — New Building
THIS APPLICATION IS FILED FOR A 4-STORY & PENTHOUSE, 4-UNIT RESIDENTIAL BUILDING.
B00742434-S1
03/01/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/28/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/21/2024
Permit issued — General Construction
B00742434-I1-GC
02/20/2024
Signed off — New Building
THIS APPLICATION IS FILED FOR A 4-STORY & PENTHOUSE, 4-UNIT RESIDENTIAL BUILDING.
B00742434-S3
02/20/2024
Permit issued — Mechanical Systems
B00742434-S1-MS
02/20/2024
Permit issued — Construction Fence
B00742434-S3-FN
01/02/2024
Signed off — New Building
THIS APPLICATION IS FILED FOR A 4-STORY & PENTHOUSE, 4-UNIT RESIDENTIAL BUILDING.
B00742434-S5
01/02/2024
Signed off — New Building
THIS APPLICATION IS FILED FOR A 4-STORY & PENTHOUSE, 4-UNIT RESIDENTIAL BUILDING.
B00742434-S6
01/02/2024
Signed off — New Building
THIS APPLICATION IS FILED FOR A 4-STORY & PENTHOUSE, 4-UNIT RESIDENTIAL BUILDING.
B00742434-S4
12/28/2023
Permit issued — Construction Fence
B00742434-S3-FN
12/28/2023
Permit issued — General Construction
B00742434-I1-GC
11/15/2023
Objection raised — Other
11/15/2023
Objection raised — Structural
11/03/2023
Filed — New Building
THIS APPLICATION IS FILED FOR A 4-STORY & PENTHOUSE, 4-UNIT RESIDENTIAL BUILDING.
B00742434-P7
10/31/2023
Signed off — Alteration
B00844920-I1
10/19/2023
Permit issued — Mechanical Systems
B00742434-S1-MS
10/18/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00899028-I1
10/16/2023
Filed — New Building
THIS APPLICATION IS FILED FOR A 4-STORY & PENTHOUSE, 4-UNIT RESIDENTIAL BUILDING.
B00742434-P6
Latest 60 of 153 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedANGELINE PENA-LEVI02/21/2024
DOB NOWMechanical SystemsSigned-offANGELINE PENA-LEVI02/20/2024
DOB NOWConstruction FenceSigned-offANGELINE PENA-LEVI02/20/2024
DOB NOWConstruction FenceSigned-offAB BUILDERS NY12/28/2023
DOB NOWGeneral ConstructionPermit IssuedAB BUILDERS NY12/28/2023
DOB NOWMechanical SystemsSigned-offAB BUILDERS NY10/19/2023
DOB NOWSupported ScaffoldSigned-offJJS MANAGEMENT INC07/12/2023
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC05/01/2023
DOB NOWSprinklersSigned-offPLBG P & H INC05/01/2023
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC03/24/2023
DOB NOWGeneral ConstructionPermit IssuedAB BUILDERS NY02/28/2023
DOB NOWStructuralSigned-offAB BUILDERS NY01/19/2023
DOB NOWFoundationSigned-offAB BUILDERS NY01/19/2023
DOB NOWGeneral ConstructionPermit IssuedAB BUILDERS NY01/19/2023
DOB NOWSupport of ExcavationSigned-offAB BUILDERS NY01/19/2023
DOB NOWConstruction FenceSigned-offAB BUILDERS NY12/28/2022
DOB NOWStructuralSigned-offANGELINE PENA-LEVI11/09/2022
DOB NOWSupport of ExcavationSigned-offANGELINE PENA-LEVI11/07/2022
DOB NOWFoundationSigned-offANGELINE PENA-LEVI11/02/2022
DOB NOWConstruction FenceSigned-offANGELINE PENA-LEVI10/07/2022
DOB NOWGeneral ConstructionPermit IssuedANGELINE PENA-LEVI09/28/2022
1 project · most recent 05/28/2024
Sprinkler System
FiledStatusContractorScope
05/28/2024Signed-offPLBG P & H INCSprinkler System
1 project · most recent 05/28/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/28/2024Signed-offPLBG P & H INCGas, Storm, Water/Sanitary
3 projects · most recent 12/30/2023
General Wiring
FiledStatusContractorScope
12/30/2023CompleteKENNETH FISK ELECTRIC CORGeneral Wiring
03/26/2023CompleteC & A ELECTRICAL CORPGeneral Wiring
03/24/2023CompleteRICHARD NEU—
1 project · most recent 05/28/2024
Concrete Masonry
FiledStatusContractorScope
05/28/2024Permit IssuedHP BUILDING MANAGEMENT INConcrete, Masonry
1 project · most recent 05/28/2024
Fence
FiledStatusContractorScope
05/28/2024Permit IssuedHP BUILDING MANAGEMENT INFence
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2024Fail-Final CND-Occupancy InspectionFailView ↗
05/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/28/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/05/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/05/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/09/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 134
DateRequirementInspectorRole
06/11/2024MasonryALDO BRAVOspecial
06/11/2024Interior lighting powerALDO BRAVOenergy_progress
06/11/2024Fenestration areasALDO BRAVOenergy_progress
06/11/2024Lighting controlsALDO BRAVOenergy_progress
06/11/2024Protection of exposed foundation insulationALDO BRAVOenergy_progress
06/11/2024Fenestration air leakageALDO BRAVOenergy_progress
06/11/2024Fenestration and door U-factor and product ratingsALDO BRAVOenergy_progress
06/11/2024Lighting in dwelling unitsALDO BRAVOenergy_progress
06/11/2024Air barrier - visual inspectionALDO BRAVOenergy_progress
06/11/2024Electrical motors and elevatorsALDO BRAVOenergy_progress
06/11/2024Exterior lighting powerALDO BRAVOenergy_progress
06/11/2024MeteringALDO BRAVOenergy_progress
06/11/2024Maintenance informationALDO BRAVOenergy_progress
06/11/2024Insulation placement and R valuesALDO BRAVOenergy_progress
06/11/2024Fire-Resistance Rated ConstructionALDO BRAVOprogress
06/11/2024Energy Code Compliance InspectionsALDO BRAVOprogress
06/11/2024Subgrade InspectionsALDO BRAVOspecial
06/11/2024Concrete - Cast-In-PlaceALDO BRAVOspecial
06/11/2024Concrete - Cast-In-PlaceALDO BRAVOspecial
06/11/2024Subgrade InspectionsALDO BRAVOspecial
06/11/2024Fire-Resistant Penetrations and JointsALDO BRAVOspecial
06/11/2024MasonryALDO BRAVOspecial
06/11/2024Fire-Resistance Rated ConstructionALDO BRAVOprogress
06/11/2024Energy Code Compliance InspectionsALDO BRAVOprogress
06/11/2024Electrical motors and elevatorsALDO BRAVOenergy_progress
Latest 25 of 134.
▾Documents — 236 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/27/2026B00844920-I1Request digital key ↗
08/27/2026B00899028-I1Request digital key ↗
08/25/2026B00742434-P7Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
04/30/2024322115769Open ↗
10/28/2022340859690Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
10/28/2022340859690Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
08/13/2026B00742434-P6Open ↗
08/13/2026B00742434-P7Open ↗
08/13/2026B00742434-P9Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/13/2026B00742434-P6Open ↗
08/13/2026B00742434-P9Open ↗
08/13/2026B00742434-A1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications151
▸DOB NOWProgress Inspector Seal & Signature86
08/31/2026B00742434-S5Open ↗
08/31/2026B00742434-P6Open ↗
08/31/2026B00742434-P6Open ↗
Showing 3 of 86 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature44
09/01/2026B00742434-P4Open ↗
09/01/2026B00742434-P4Open ↗
09/01/2026B00742434-P4Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/27/2026B00844920-I1Open ↗
08/25/2026B00742434-P7Open ↗
08/25/2026B00742434-P6Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/28/2022340859690Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/13/2026B00742434-P9Open ↗
08/13/2026B00742434-A1Open ↗
08/13/2026B00742434-P6Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist6
08/25/2026B00742434-P6Open ↗
08/25/2026B00742434-P7Open ↗
08/25/2026B00742434-A1Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
04/04/2023340859690Open ↗
▸BISSTREET TREE CHECKLIST1
02/10/2023340859690Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00742434-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/28/2022340859690Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
10/28/2022340859690Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/28/2022340859690Open ↗
▸BISEFILING COVER SHEET1
04/30/2024322115769Open ↗
▸Other Documents27
▸DOB NOWProperty Ownership Certification10
08/25/2026B00742434-P7Open ↗
08/25/2026B00742434-S2Open ↗
08/25/2026B00742434-A1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSite Survey: Initial6
08/13/2026B00742434-A1Open ↗
08/13/2026B00742434-P7Open ↗
08/13/2026B00742434-P6Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/24/2023340859690Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/06/2024322115769Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/28/2022340859690Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00742434-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00742434-S6Open ↗