DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
ECB05/08/2025FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #901161. REMEDY: SUBMIT ACCEPTABLE REQU$10K due
ECB07/10/2024A. C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MOR$10K due
DOB02/22/2024FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
ECB04/14/202327-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100 FT OR MORE IN HEIGHT IN EXISTENCE ON$10K due
ECB12/17/2021SEC. AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEMOF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BLDG 100 FEET OR MORE IN$6K due
ECB04/20/2021SEC. 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OFAUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BLDG 100 FEET OR MORE IN HEIG$10K due
ECB04/21/2020SEC. 27-929.1 AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDG$10K due
ECB11/15/2019AC 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE SPRINKLER REPORT PREPARED BY A REGISTERD DESIGN PROFESSIONAL BY JULY 1, 2019, IN AN OFFICE BUILDING 100 FEET OR$6K due
DOB09/03/2019FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
DOB01/26/2018VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
DOB01/03/2017VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
DOB11/14/2016VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
DOB12/30/2015FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB05/30/2014VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
DOB12/31/2013FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
DOB08/15/2012V-DOB VIOLATION - ACTIVE
DOB05/12/2009V-DOB VIOLATION - ACTIVE
DOB11/06/2008V-DOB VIOLATION - ACTIVE
DOB11/30/2007V-DOB VIOLATION - ACTIVE
DOB11/26/2007V-DOB VIOLATION - ACTIVE
DOB04/21/2004V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB07/22/1988(51)REPAIR LIGHT IN CAB.(52)TAG GOVERNOR TO SHOW 5 YEAR SAFETY TEST
ECB09/30/2015FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.LACK OF A SYSTEMOF AUTOMATIC SPRINKLER HEADS.I OBSERVED AT 10:45AM IN THE REAR OF COMMERCIAL SPACE UNDER A MEZZANINE THERE IS NO SPRINKLER COVERAGE FOR FIRENothing owed — awaiting certificate of correction
ECB09/07/1999FAILURE TO FILE A REPORT OF COMPLIANCE WITH LOCAL LAW `6/84 CERTIFYING TO THE INSTALLATION OF REQUIRED FIRE PROTECTION SYSTEMS REMEDY FILE REPORTNothing owed — awaiting certificate of correction