Two family brick
58 HALE AVENUE
BROOKLYN · Cypress Hills · BIN 3086759
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R4Zoning
2,036 sfGross Floor Area
2Units
Two family brick · 1,992 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WORLD DESIGN ARCHITECTURE,PLLC110/07/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EBC CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR PRO INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323110/07/2024
Building Lifecycle
All (12)Filed (1)Permit Issued (1)Signed Off (1)Objection (4)Special Inspection (5)
01/13/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE INN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01121822-I1
12/02/2024
Permit issued — Solar
B01121822-I1-SL
11/14/2024
Objection resolved — Addressed
11/14/2024
Objection resolved — Addressed
10/23/2024
Objection raised — Other
10/23/2024
Objection raised — Other
10/07/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE INN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01121822-I1
10/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
10/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
10/03/2024
Special inspection requirement — Energy Code Compliance Inspections
JEFFREY BELL
10/03/2024
Special inspection requirement — Final
RICHARD MUESCH JR.
10/03/2024
Special inspection requirement — Air barrier - visual inspection
JEFFREY BELL
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR PRO INC12/02/2024
1 project · most recent 10/01/2024
FiledStatusContractorScope
10/01/2024CompleteFLOW STATE ELECTRIC, LLC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/03/2024Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
10/03/2024Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
10/03/2024Energy Code Compliance InspectionsJEFFREY BELLprogress
10/03/2024FinalRICHARD MUESCH JR.progress
10/03/2024Air barrier - visual inspectionJEFFREY BELLenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026B01121822-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026B01121822-I1Open ↗
08/30/2026B01121822-I1Open ↗
08/30/2026B01121822-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026B01121822-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/30/2026B01121822-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026B01121822-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01121822-I1Open ↗