DOB10/03/2019OBSERVED RETAINING WALL AT REAR OF PROPERTY EXPOSURE 3, HAS A CRACK AND IS BULGING FORWARD ONTO NEIGHBORS PROPERTY, JOB 520286324 ISSUED TO CORRECT THE VIOLATING CONDITION, REPAIRS MADE WERE FOUND TO HAVE NOT FOLLOWED APPROVED PLANS & AT TIME OF THE INSPECTION THE CONDITION REMAIN.
DOB01/29/2018DUE TO THE APP OF RECOR HAS INFORMED THE DEPT THAT SHE OR HE HAS WITHDRAWN FROM THE PROJECT UNDER JOB APP NO 520286324, THE SI BOROUGH COMM ISSUES A STOP WORK ORDER.STOP ALL WORK IMMEDIATELY'MAKE SITE SAFE REMDEY:COMPLY WITH THE COMM ORDER. THE PERMIT HOLDER OR RECORD HAS INFORMED THE SI BOROUGH COMM OFFICE TO RESOLVE THIS ISSUE
DOB12/27/2017FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB12/27/2017FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB08/15/2017REQUEST ADDITIONAL INFORMATION.(STRUCTURALLY ENGINEERING ASSESMENT AND CALCS). UPON REVIEW OF THE PROJECT FILING AND CORRESPONDENCE BETWEEN THE ARCHITECT OF RECORD AND DOB STAFF WEE HEREBY REQUEST ALL COPIES OF CALCULATION,FILED VISIT NOTES,GEOTECHNICAL INVESTIGATIONS.REMEDY:PROV A DETAIL ENG'R REPORT AND DOCUMENTS BY AUGUST 18, 2017
DOB08/04/2016V-DOB VIOLATION - ACTIVE
ECB10/03/201728-104.7.1 DESIGN DOCS ARE INADEQUATE & INCOMPLETE.NOTED:A REVIEW OF THE DESIGN DOCS PREPARED BY MR.JOEL G.CHAMBERLAIN, AIA AS A RESULT OF AN INCOMPLETE,LACKED ANY STRUCTURAL ENGINEERING BASIS & UMLAWFULLY MODINothing owed — awaiting certificate of correction
ECB10/03/2017FILED A CERT FORM APPL CONTAINING MATERIAL FALSE STATEMENTS.NOTED:A REVIEW OF THE DOCS SUMMITTED TO THE DOB FALSE CERTS SPECIFICALLY THE APPL CERT THAT HE HAD PERFORMED SITE INSPS & THAT THE CONST MET THE DRAWNothing owed — awaiting certificate of correction
ECB04/19/2017WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. UNDER ALT2 #520286324. NOTE: TECHICAL SPECIFICATIONS ON PLANS INDICATE CHANNEL BRACES FOR RETAINING WALL TO BE: STEEL 6X8.2 (6"XNothing owed — awaiting certificate of correction