← Back
Two stories - detached, small or mid-size
58 NEWBERRY AVENUE
STATEN ISLAND · Grasmere-Arrochar-South Beach-Dongan Hills · BIN 5175104
💬 Discuss this project
2022Year Built
2Stories
A1Building Class
R3XZoning
2,442 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,502 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
Architecture
Floor 12p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS, LLP212/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAXIMUM CONTRACTING INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738212/13/2024
Building Lifecycle
All (19)Filed (2)Permit Issued (1)Inspection (1)Objection (6)Special Inspection (9)
12/19/2024
Objection resolved — Addressed
12/16/2024
Objection raised — Scope
12/13/2024
Filed — New Building
CONSTRUCTION OF A ONE (1) STORY, DETACHED TWO (2) CAR GARAGE
S00557155-P1
12/05/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
12/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
12/05/2024
Special inspection requirement — Masonry
anthony santoro
12/05/2024
Special inspection requirement — Subgrade Inspections
anthony santoro
12/05/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
12/05/2024
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
12/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
12/05/2024
Special inspection requirement — Lighting in dwelling units
anthony santoro
12/05/2024
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
10/11/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/18/2022
Permit issued — General Construction
S00557155-I1-GC
09/01/2021
Objection raised — Scope
09/01/2021
Objection resolved — Addressed
08/09/2021
Filed — New Building
CONSTRUCTION OF A ONE (1) STORY, DETACHED TWO (2) CAR GARAGE
S00557155-I1
08/09/2021
Objection raised — Energy
08/09/2021
Objection resolved — Addressed
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMAXIMUM CONTRACTING INC05/18/2022
1 project · most recent 08/08/2024
General Wiring
FiledStatusContractorScope
08/08/2024CompleteRIDGE ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
10/11/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/05/2024Concrete - Cast-In-Placeanthony santorospecial
12/05/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
12/05/2024Masonryanthony santorospecial
12/05/2024Subgrade Inspectionsanthony santorospecial
12/05/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
12/05/2024Energy Code Compliance Inspectionsanthony santoroprogress
12/05/2024Fire-Resistance Rated Constructionanthony santoroprogress
12/05/2024Lighting in dwelling unitsanthony santoroenergy_progress
12/05/2024Electric vehicle service equipment requirementsanthony santoroenergy_progress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026S00557155-P1Request digital key ↗
08/15/2026S00557155-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026S00557155-I1Open ↗
08/13/2026S00557155-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00557155-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026S00557155-I1Open ↗
08/13/2026S00557155-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/05/2026S00557155-P1Open ↗
09/05/2026S00557155-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/05/2026S00557155-P1Open ↗
09/05/2026S00557155-P1Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026S00557155-I1Open ↗
08/13/2026S00557155-P1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/15/2026S00557155-I1Open ↗
08/13/2026S00557155-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00557155-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00557155-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/15/2026S00557155-I1Open ↗
08/13/2026S00557155-P1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00557155-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00557155-I1Open ↗
▸Other Documents5
▸DOB NOWSite Survey: Initial2
08/15/2026S00557155-I1Open ↗
08/13/2026S00557155-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026S00557155-I1Open ↗
08/13/2026S00557155-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00557155-I1Open ↗