← Back
Zoned residential, not Manhattan
58 PLACE
QUEENS · Woodside · BIN 4623690
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R5Zoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · 1,800 sf lot · 0 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 8 docs
Basement2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHIMUSE107/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING203/21/2026
Building Lifecycle
All (45)Filed (1)Objection (24)Special Inspection (20)
04/14/2022
Objection resolved — Addressed
04/14/2022
Objection resolved — Resolved
04/14/2022
Objection resolved — Resolved
03/21/2022
Objection resolved — Addressed
03/21/2022
Objection resolved — Addressed
03/21/2022
Objection resolved — Addressed
03/21/2022
Objection resolved — Addressed
03/21/2022
Objection resolved — Addressed
03/21/2022
Objection resolved — Addressed
03/21/2022
Objection resolved — Addressed
03/21/2022
Special inspection requirement — Duct leakage testing, insulation and design
03/21/2022
Special inspection requirement — HVAC-R and service water heating equipment
03/21/2022
Special inspection requirement — Air barrier - visual inspection
03/21/2022
Special inspection requirement — Air barrier — testing
03/21/2022
Special inspection requirement — HVAC-R and service water heating system controls
03/21/2022
Special inspection requirement — Protection of exposed foundation insulation
03/21/2022
Special inspection requirement — Permanent certificate
03/21/2022
Special inspection requirement — Electric vehicle service equipment requirements
03/21/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
03/21/2022
Special inspection requirement — Metering
08/07/2021
Objection raised — Admin
08/07/2021
Objection raised — Admin
08/07/2021
Objection raised — Scope
08/07/2021
Objection raised — Structural
08/07/2021
Objection raised — Energy
08/07/2021
Objection raised — Other
08/07/2021
Objection raised — Fire_Protection
08/07/2021
Objection raised — Admin
08/07/2021
Objection raised — Scope
08/07/2021
Objection raised — Scope
08/07/2021
Objection raised — Structural
08/07/2021
Objection raised — Structural
08/07/2021
Objection raised — Structural
08/07/2021
Objection raised — Zoning
07/21/2021
Filed — New Building
PROPOSE NEW 3-STORY W/ BASEMENT RESIDENTIAL BUILDING AS PER PLAN. OBTAIN NEW C OF O.
Q00505466-I1
07/02/2021
Special inspection requirement — Lighting controls
07/02/2021
Special inspection requirement — Fire-Resistance Rated Construction
07/02/2021
Special inspection requirement — Energy Code Compliance Inspections
07/02/2021
Special inspection requirement — Fenestration air leakage
07/02/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
07/02/2021
Special inspection requirement — Interior lighting power
07/02/2021
Special inspection requirement — Fenestration areas
07/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2021
Special inspection requirement — Insulation placement and R values
07/02/2021
Special inspection requirement — Maintenance information
Nothing on file for this building.
1 project · most recent 07/21/2021
FiledStatusContractorScope
07/21/2021——1 scope_items
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/21/2022Duct leakage testing, insulation and design—energy_progress
03/21/2022HVAC-R and service water heating equipment—energy_progress
03/21/2022Air barrier - visual inspection—energy_progress
03/21/2022Air barrier — testing —energy_progress
03/21/2022HVAC-R and service water heating system controls—energy_progress
03/21/2022Protection of exposed foundation insulation—energy_progress
03/21/2022Permanent certificate—energy_progress
03/21/2022Electric vehicle service equipment requirements—energy_progress
03/21/2022HVAC-R and service water piping design and insulation—energy_progress
03/21/2022Metering—energy_progress
07/02/2021Lighting controls—energy_progress
07/02/2021Fire-Resistance Rated Construction—progress
07/02/2021Energy Code Compliance Inspections—progress
07/02/2021Fenestration air leakage—energy_progress
07/02/2021Fenestration and door U-factor and product ratings—energy_progress
07/02/2021Interior lighting power—energy_progress
07/02/2021Fenestration areas—energy_progress
07/02/2021Fire-Resistant Penetrations and Joints—special
07/02/2021Insulation placement and R values—energy_progress
07/02/2021Maintenance information—energy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026Q00505466-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00505466-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00505466-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00505466-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q00505466-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00505466-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00505466-I1Open ↗
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q00505466-I1Open ↗