| Owner | Filings | Most Recent |
|---|---|---|
| 1634 DEAN | 17 | 07/08/2026 |
| METROPOLITAN A.M.E. CHURCH | 7 | 03/21/2026 |
| METRO AME CHURCH | 5 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 09/08/2017 | $1.2M | — | — → — | $187/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| HCN DESIGN | 2 | 01/29/2026 |
| SIDERIS KEFALAS ENGINEERS PC | 4 | 11/03/2025 |
| WEXLER ASSOCIATES | 4 | 09/22/2025 |
| RIGID STRUCTURAL DESIGN, LLC | 1 | 05/12/2025 |
| H & O ENGINEERING, DPC | 3 | 04/24/2025 |
| LMW ENGINEERING GROUP LLC | 3 | 05/05/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| ADVANCED BUILDERS SERVICES | 15 | 03/21/2026 |
| Rigid Structural Design, LLC | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| YATZIV CORP | General Contractor | 5 | 07/08/2026 |
| JABBIE INDUSTRIES INCORP* | General Contractor | 2 | 04/09/2026 |
| PACIFIC HOLDING ENTERPR* | General Contractor | 2 | 04/09/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AA BUILDING & INSPECTION | 1519 | 1 | 04/09/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Protection and Mechanical Methods | Signed-off | YATZIV CORP | 03/06/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | JABBIE INDUSTRIES INCORP* | 03/04/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | JABBIE INDUSTRIES INCORP* | 03/04/2026 |
| DOB NOW | Full Demolition | Signed-off | YATZIV CORP | 02/18/2026 |
| DOB NOW | Construction Fence | Permit Issued | YATZIV CORP | 01/30/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | PACIFIC HOLDING ENTERPR* | 05/12/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | PACIFIC HOLDING ENTERPR* | 05/12/2025 |
| BIS | EQ | ISSUED | EVEREST SCAFFOLDING INC | 02/28/2014 |
| BIS | EQ | ISSUED | EVEREST SCAFFOLDING INC | 02/08/2008 |
| BIS | PL | ISSUED | MARATHON MECHANICAL LLC | 01/16/2008 |
| BIS | EQ | ISSUED | EVEREST SCAFFOLDING INC | 01/14/2008 |
| BIS | EQ | ISSUED | EVEREST SCAFFOLDING INC | 01/22/2007 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/29/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Toshiba MCY-MUB0368HS2P-UL 36,000 BTU · Vrf Outdoor ×43 37MARQ18AA3 18,000 BTU · Condensing Unit ×4 RAV-BP121AT2P-UL 12,000 BTU · Condensing Unit ×2 MCY-MUB0488HS2P-UL 48,000 BTU · Vrf Outdoor ×1 MMY-UP192H1FT9PUL 192,000 BTU · Vrf Outdoor ×1 MMY-UP2401HT9P-UL 240,000 BTU · Vrf Outdoor ×1 MMY-UP288H1HT9PUL 288,000 BTU · Vrf Outdoor ×1 RAV-BP241AT2P-UL 24,000 BTU · Condensing Unit ×1 Ventilation Greenheck ECV-20-P-L 900 CFM · Erv ×1 ERVe-35-30L 2,750 BTU · Erv ×1 RVE-40-36D-12.5I-1-D2 3,300 CFM · Erv ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/29/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/29/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/05/2025 | Permit Issued | NASH ELECTRIC SERVICES IN | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/29/2026 | — | — | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/12/2025 | Permit Issued | JABBIE INDUSTRIES INCORP* | Scaffold, Sidewalk Shed |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/09/2025 | Masonry | — | special |
| 09/24/2025 | Concrete - Cast-In-Place | — | special |
| 09/24/2025 | Structural Steel - Welding | — | special |
| 09/24/2025 | Structural Steel - Details | — | special |
| 09/24/2025 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 09/22/2025 | Concrete - Cast-In-Place | — | special |
| 09/22/2025 | Structural Steel - Welding | — | special |
| 09/22/2025 | Structural Steel - Details | — | special |
| 09/22/2025 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 09/11/2025 | Energy Code Compliance Inspections | — | progress |
| 09/05/2025 | Post-installed Anchors | — | special |
| 09/05/2025 | Duct leakage testing, insulation and design | — | energy_progress |
| 04/07/2025 | Demolition | Younes Abouyaala | special |
| 04/07/2025 | Structural Stability – Alterations of existing Buildings | Younes Abouyaala | special |
| 05/08/2023 | Shutoff dampers | — | energy_progress |
| 05/03/2023 | Maintenance information | — | energy_progress |
| 05/03/2023 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 05/03/2023 | Energy Code Compliance Inspections | — | progress |
| 05/03/2023 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 05/03/2023 | HVAC-R and service water heating system controls | — | energy_progress |
| 05/03/2023 | Maintenance information | — | energy_progress |
| 05/03/2023 | Fire-Resistant Penetrations and Joints | — | special |
| 05/03/2023 | HVAC-R and service water heating equipment | — | energy_progress |
| 05/03/2023 | Fire-Resistant Penetrations and Joints | — | special |
| 05/03/2023 | Fire-Resistant Penetrations and Joints | — | special |