ECB10/15/2025RESPONDING TO AN INCIDENT WHERE A GLASS PANEL FELL ONTO A WORKER ON THE 14TH FLOOR AFTER INADEQUATELY PLACING IT DOWN. UPON REVIEWING THE PRE-SHIFT SAFETY MEETING, INSPECTION REVEALED THAT PLACEMENT AND HANDLIN$5K due
ECB10/15/2025RESPONDING TO AN INCIDENT WHERE A GLASS PANEL FELL ONTO A WORKER ON THE 14TH FLOOR AFTER INADEQUATELY PLACING IT DOWN. INSPECTION REVEALS THAT THE PANELS WERE BEING TRANSPORTED, HANDLED AND STORED INADEQUATELY$10K due
ECB10/15/2025NOTE: AT TIME OF INSPECTION, I OBSERVED HOIST BEING USED TO TRANSPORT CURTAIN WALLS TO THE 14 FLOOR, UPON REVIEW OF THE PERMIT, IT WAS NOTED THAT IT WAS EXPIRE ON (09/09/2025), A VALID PERMIT IS REQUIRED TO INS$5K due
ECB02/04/2025AT TIME OF MY INSPECTION ON A ACTIVE 36 STORY NB JOBSITE,I ASK SSM TO PROVIDE DRAVINGS FOR PLATFORMS INSTALLED AT EXP#1,3,4 ,NONE WAS PROVIDED/AVAILABLESTOP ALL USE OF THE PLATFORM AT EXP#1,3,4$3K due
ECB02/04/2025AT TIME OF MY INSPECTION ON A ACTIVE JOBSITE OF A 36 STORY NB,OBSERVED THAT GUARDRAILS WERE MISSING OR NOT BUILD AS PER CODE-LOSE NETTINGS ,HOLES , LOSE OR MISSING 0 CABLE AND GURDRAIL NOT SECURED THROUGHOUT T$25K due
ECB02/04/2025AT THE TIME OF INSPECTION ON AN ACTIVE 36-STORY NB, I OBSERVED THAT THE ELEVATOR SHAFTS PLATFORMS ARE NOT INSTALLED AS APPROVED PLAN. SHAFTSCOVERED WITH OSHA PLANKS MISSING BEAMS,PLAN SHOWING 4 BY 4 WOOD BEAMS$3K due
ECB02/04/2025AT TIME OF MY INSPECTION ON A ACTIVE JOBSITE OF A 36 STORY NB,OBSERVED THAT HOUSEKEEPING WAS INADEQUATE,MIX MATERIAL AND DEBRIS CREATING A TRIP AND FALL HAZARD FOR WORKERS AND PERSONNEL ON SITE.COMPLY WITH COD$3K due
ECB10/10/2024AT THE TIME OF INSPECTION I OBSERVED LARGE PILES OF DEBRIS AND COMBUSTIBLE MATERIAL STORED ON THE 29TH FLOOR. THIS IS HAZARDOUS AS THE SOME MATERIAL IS COMBUSTIBLE AND A LARGE ACCUMILATION WAS OBSERVED. THIS MA$3K due
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
ECB08/22/2024AT TIME OF INSPECTION, NO GUARDRAIL SYSTEM WAS INSTALLED AT THE WORKING DECK LEVEL, IN VIOLATION OF BC 3308.7. STOP ALL WORK ON AND ABOVE THE 42ND FLOOR IMMEDIATELY. INSTALL AND MAINTAIN A GUARDRAIL SYSTEM AS R$5K due
ECB05/16/2024AT TIME OF INSPECTION RESPOND TO AN COMPLAINT OF A WORKER WAS HIT ON THE HEAD WHEN STRIPPING OPERATION ON THE 31TH FLOOR WAS TAKEN PLACE. THE INCIDENT TOOK PLACE ON 05/04/2024. THE DEPARTMENT WAS NOTIFIED ON$25K due
DOB02/02/2021FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB11/02/2020FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB08/02/2020FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB05/02/2020FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB02/02/2020FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB11/08/2019VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
DOB11/02/2019FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB08/02/2019FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB05/20/2019FAILURE TO PERFORM CATEGORY 5 INSPECTION
DOB05/02/2019FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB04/05/2019VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB09/15/2017VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
DOB10/01/2012VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
DOB12/13/2011VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
ECB07/10/2026AT TIME OF INSPECTION, OBSERVED CONSTRUCTION FENCE IN PLACE. UPON REVIEW OF DEPARTMENT RECORDS, IT WAS DETERMINED THAT TEMPORARY CONSTRUCTION EQUIPMENT PERMIT NO. M00060994-I1-FN EXPIRED ON 10/26/2024 AND THE CHearing held — result not yet published
ECB03/10/2026EXPIRED PERMIT FOR CONSTRUCTION FENCE. REMEDY: RENEW PERMIT.Hearing held — result not yet published$1K proposed
ECB01/02/2026AT TIME OF INSPECTION OF A 36 STORIES NEW BUILDING UNDER CONSTRUCTION I OBSERVED CONSTRUCTION FENCE INSTALLED AT EXPOSURE #1 UPON REVIEW THE DEPARTMENT RECORD TO VERIFY COMPLIANCE IT SHOWS THAT THE CONSTRUCTIOHearing held — result not yet published$1K proposed
ECB01/24/2024FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. ASNOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 36 STORY BUILDING: OBSERVED AT 1ST FLOOR GRADE LEVEL AND FLOOR #14, 15, ANDNothing owed — awaiting certificate of correction
ECB01/24/2024BC 3301.1.2 AT TIME OF INSPECTION OF A PROPOSED 36 STOREYS BUILDING AT 27 FLOOR LEVEL WORK IN PROGRESS, I OBSERVED STORAGE CABINETS OF FLAMMABLE MATERIALS, GAS , ACETYLENE FOR TORCH OPERATION LOCATED ON THE FNothing owed — awaiting certificate of correction
ECB01/24/2024BC 3307.6.5.8 AT TIME OF INSPECTION I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE # 1 ON THE JOBSITE , UPON REQUEST FOR THE SIDEWALK SHED 6 MONTHS PERIODIC INSPECTION LETTER TO VIEW TO VERIFY COMPLIANCE, THE LNothing owed — awaiting certificate of correction
ECB08/19/2023PERMITHOLDER FAILED TO MAINTAIN ANY HOIST OPERATING FOR NEW BUILDING UNDER CONSTRUCTION CURRENTLY ABOVE 75 FEET HIGH, CREATING AN IMMEDIATE HAZARDOUS FOR EMERGENCY STAFF IN SUCH CASES. HOIST NOT IN READINESS CONothing owed — awaiting certificate of correction
ECB08/18/2023CEASE USE - 16B11CU 16A# 161011CU 97B77CU 100M7 (16-B-11) CU HOISTWAY DOOR OF LOADING IS ABLE TO BE OPEN FROM THE OUTSIDE ALLOWING SHAFTWAY TO BE UNSEARED & OPENED IN WHICH SOMEONE CAN FALL DOWN (16-A-#) HOISTWNothing owed — awaiting certificate of correction
ECB02/11/2023AT THE TIME OF MY INSPECTION OF A PROPOSED 36 STORY NEW BUILDING , I OBSERVED A CONSTRUCTION FENCE AT EXPOSURE 1 IN NEED OF MAINTAINENCE. I OBSERVED BROKEN PLEXIGLASS ON THE CONSTRUCTION FENCE EXPOSURE 1 WITHNothing owed — awaiting certificate of correction
ECB07/08/2022WORK DOESNT CONFORM TO APPROVED CONST DOCS &OR APPROVED AMENDMENTS (HOIST) ATOI OBSERVED HOIST DRAWING CONTRARY TO ACTUAL FIELD CONDITIONS:HOIST BASE STRUCTURE DOESNT CONFORM TO APPROVED DRAWING DEVIATIONS ARENothing owed — awaiting certificate of correction
ECB12/02/2021PERMIT HOLDER FAILED TO ENSURE WORK RECIEVE SITE SAFETY ORIENTATION AT TIME OF INSPECTION RESPONDING TO AN INCDENT WHERE A WORKER WAS INJUREWHEN A 10 FT BEAM FELL 20 FT DOWN AND HIT THE WORKER ON HIS SHOULDER UNothing owed — awaiting certificate of correction