← Back
Office only, 1 story
58 WEST STREET
STATEN ISLAND · Port Richmond · BIN 5005543
💬 Discuss this project
1960Year Built
1Stories
O1Building Class
R3AZoning
2,170 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Office only, 1 story · 5,000 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MULVIHILL ELECTRICAL CONTRACTING103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A TECH ENGINEERING NYC, PLLC.103/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CARD HTG & COOLING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738103/03/2021
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (4)
05/25/2021
Signed off — Alteration
DIRECT REPLACEMENT OF (2) 4-TON ROOFTOP HVAC PACKAGE UNITS.
S00475480-I1
05/20/2021
Permit issued — Mechanical Systems
S00475480-I1-MS
03/03/2021
Filed — Alteration
DIRECT REPLACEMENT OF (2) 4-TON ROOFTOP HVAC PACKAGE UNITS.
S00475480-I1
02/24/2021
Special inspection requirement — Mechanical Systems
anthony santoro
02/24/2021
Special inspection requirement — Final
anthony santoro
02/24/2021
Special inspection requirement — Maintenance information
anthony santoro
02/24/2021
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
04/23/1992
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offCARD HTG COOLING05/20/2021
BISOTISSUEDCONSTRUCTION /CODE SERVICES OFNY07/15/2002
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
02/24/2021Mechanical Systemsanthony santorospecial
02/24/2021Finalanthony santoroprogress
02/24/2021Maintenance informationanthony santoroenergy_progress
02/24/2021HVAC-R and service water heating equipmentanthony santoroenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026S00475480-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/25/2026S00475480-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026S00475480-I1Open ↗
08/24/2026S00475480-I1Open ↗
08/24/2026S00475480-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S00475480-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026S00475480-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00475480-I1Open ↗