BuildNYC
Elevator apt, fireproof without stores
Linden Plaza
580 STANLEY AVENUE · BIN 3324020
💬 Discuss this project
1955Year Built
14Stories
D3Building Class
R5Zoning
940,800 sfGross Floor Area
756Units
LL97 CoveredRent Stabilized74 Active Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: Stanley Avenue Preservation · 502,900 sf lot · 1.87 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsMechanical work for 8-story NYCHA dwelling renovation1 filing
RoofTemporary pipe scaffold installation1 filing
Site & exteriorConstruction fence installation3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority1603/21/2026
Stanley Avenue Preservation203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service403/21/2026
JM Zoning3003/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sap ConstructionGeneral Contractor3407/08/2026
Skyline Scaffolding GroupScaffold603/21/2026
4Matic ConstructionScaffold407/08/2026
M & M Piping and HeatingPlumbing207/08/2026
Capone Electrical ContractorsGeneral Contractor203/22/2026
Victorian FenceScaffold207/08/2026
R.C.M. ElectricElectrical103/22/2026
Sunkeeper Solar ElectricElectrical103/21/2026
Capone Electrical ContractorsElectrical103/22/2026
Innovation PlumbingPlumbing107/08/2026
Capone Electrical ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service8431112/20/2024
Rand Engineering & Architects266111/05/2021
Building Lifecycle
All (141)Filed (18)Permit Issued (24)Signed Off (9)Facade (FISP) (13)Violation (44)Inspection (3)Special Inspection (30)
06/25/2026
Violation issued (HPD, open)
A
06/25/2026
Violation issued (HPD, open)
A
06/25/2026
Violation issued (HPD, open)
A
06/25/2026
Violation issued (HPD, open)
A
06/21/2026
Violation issued (HPD, open)
B
05/28/2026
Violation issued (HPD, closed)
C
05/28/2026
Violation issued (HPD, closed)
C
04/10/2026
Violation issued (HPD, closed)
C
04/08/2026
Violation issued (HPD, closed)
C
03/17/2026
Violation issued (HPD, closed)
C
03/09/2026
Violation issued (HPD, closed)
C
03/09/2026
Violation issued (HPD, closed)
C
01/12/2026
Violation issued (HPD, closed)
B
01/12/2026
Violation issued (HPD, closed)
C
12/15/2025
Violation issued (ECB, closed)
Elevators
12/13/2025
Violation issued (HPD, closed)
A
09/27/2025
Violation issued (HPD, closed)
A
09/27/2025
Violation issued (HPD, closed)
C
09/27/2025
Violation issued (HPD, closed)
C
09/27/2025
Violation issued (HPD, closed)
A
09/05/2025
Violation issued (HPD, closed)
A
09/05/2025
Violation issued (HPD, closed)
B
09/05/2025
Violation issued (HPD, closed)
B
09/05/2025
Violation issued (HPD, closed)
C
08/29/2025
Violation issued (HPD, closed)
C
07/01/2025
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478212-S1
06/10/2025
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478212-S3
05/21/2025
Violation issued (HPD, closed)
A
05/21/2025
Violation issued (HPD, closed)
B
05/21/2025
Violation issued (HPD, closed)
B
04/18/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/13/2025
Violation issued (HPD, closed)
B
03/13/2025
Violation issued (HPD, closed)
B
03/13/2025
Violation issued (HPD, closed)
B
03/03/2025
Permit issued — Mechanical Systems
B00478212-S3-MS
02/04/2025
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478212-I1
01/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/16/2025
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
01/16/2025
Special inspection requirement — Final
JOHN MCMONAGLE
01/16/2025
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
01/16/2025
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
01/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
12/20/2024
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478212-P7
12/17/2024
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478212-P8
12/04/2024
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478212-S7
12/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/02/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
11/27/2024
Permit issued — General Construction
B00478212-I1-GC
11/26/2024
Special inspection requirement — Vestibules
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Final
Mark Ginsberg
11/26/2024
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
11/26/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
11/19/2024
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 8-STORY NYCHA MULTIPLE DWELLING THROUGHOUT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478212-P6
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSap Construction03/03/2025
DOB NOWGeneral ConstructionSigned-offSap Construction11/27/2024
DOB NOWGeneral ConstructionSigned-offSap Construction11/13/2024
DOB NOWMechanical SystemsSigned-offSap Construction11/13/2024
DOB NOWPlumbingSigned-offM & M Piping and Heating09/10/2024
DOB NOWStructuralSigned-offSap Construction02/01/2024
DOB NOWGeneral ConstructionSigned-offSap Construction12/27/2023
DOB NOWGeneral ConstructionSigned-offSap Construction12/27/2023
DOB NOWMechanical SystemsSigned-offSap Construction12/27/2023
DOB NOWConstruction FenceSigned-offVictorian Fence05/12/2023
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/12/2023
DOB NOWSupported ScaffoldSigned-off4Matic Construction04/18/2023
DOB NOWGeneral ConstructionSigned-offSap Construction01/19/2023
DOB NOWGeneral ConstructionSigned-offSap Construction01/19/2023
DOB NOWMechanical SystemsSigned-offSap Construction01/19/2023
DOB NOWGeneral ConstructionSigned-offSap Construction01/19/2023
DOB NOWSupported ScaffoldSigned-off4Matic Construction11/22/2022
DOB NOWMechanical SystemsSigned-offSap Construction11/15/2022
DOB NOWConstruction FenceSigned-offVictorian Fence10/24/2022
DOB NOWGeneral ConstructionSigned-offSap Construction09/29/2022
DOB NOWGeneral ConstructionSigned-offSap Construction08/10/2022
DOB NOWPlumbingSigned-offInnovation Plumbing08/10/2022
DOB NOWGeneral ConstructionSigned-offSap Construction07/14/2022
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/24/2022
BISOTISSUEDRoma Scaffolding04/10/2015
BISEQISSUEDRoma Scaffolding02/27/2015
BISEQISSUEDRoma Scaffolding02/25/2015
BISEQISSUEDNavico B & S Construction07/28/2014
BISEQISSUEDNavico B & S Construction07/17/2013
BISEQISSUEDNavico B & S Construction06/12/2013
BISOTISSUEDAshnu International05/04/2011
BISEQISSUEDTalico Construction02/15/2011
BISPLISSUEDPerformance Plumbing01/17/2007
BISPLISSUEDDanco08/24/2006
BISPLISSUEDDelphi Plumbing & Heating03/27/2006
BISPLISSUEDDelphi Plumbing & Heating04/05/2005
BISOTISSUEDArrow Steel Window07/06/1999
BISOTISSUEDV C Vitanza Sons02/10/1999
BISPLISSUEDV. C. Vitanza Sons02/10/1999
BISOTISSUEDArrow Steel Window10/23/1998
+ 2 more permits on file
1 project · most recent 12/20/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/20/2024Signed-offSap ConstructionVentilation Systems
Ventilation
Ruskin EV450RT 280 CFM · Erv ×2
4 projects · most recent 03/02/2025
General Wiring
FiledStatusContractorScope
03/02/2025CompleteSunkeeper Solar2 meters, 1 new_meters
02/19/2025CompleteCapone Electrical ContractorsGeneral Wiring
10/18/2022CompleteR.C.M. Electric—
05/10/2022CompleteTop Shelf Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/18/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
01/16/2025Maintenance informationJOHN MCMONAGLEenergy_progress
01/16/2025FinalJOHN MCMONAGLEprogress
01/16/2025Mechanical SystemsJOHN MCMONAGLEspecial
01/16/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
01/16/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
01/16/2025HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
12/02/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/02/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
11/26/2024VestibulesJOHN MCMONAGLEenergy_progress
11/26/2024Interior lighting powerJOHN MCMONAGLEenergy_progress
11/26/2024Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
11/26/2024Exterior lighting powerJOHN MCMONAGLEenergy_progress
11/26/2024Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
11/26/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
11/26/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
11/26/2024FinalMark Ginsbergprogress
11/26/2024Lighting controlsJOHN MCMONAGLEenergy_progress
11/26/2024Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
10/31/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
10/31/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/30/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/30/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/23/2024Insulation placement and R valuesJohn Monroeenergy_progress
05/23/2024Exterior Insulation and Finish Systems (EIFS)John Monroespecial
05/23/2024FinalJohn Monroeprogress
Latest 25 of 56.
▾Documents — 176 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
09/01/2026B00478212-P1Request digital key ↗
09/01/2026B00478212-S4Request digital key ↗
09/01/2026B00478212-S3Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION7
02/26/2015340233982Open ↗
02/24/2015340233385Open ↗
07/29/2014340064833Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
03/29/2015340242437Open ↗
02/26/2015340233982Open ↗
02/24/2015340233385Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications71
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/01/2026B00478212-P1Open ↗
09/01/2026B00478212-S4Open ↗
09/01/2026B00478212-S3Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026B00478212-P8Open ↗
09/23/2026B00478212-S1Open ↗
09/23/2026B00478212-P8Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
02/25/2016340242437Open ↗
02/25/2016340242437Open ↗
01/11/2016340233982Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B00478212-S1Open ↗
09/23/2026B00478212-P8Open ↗
09/02/2026B00478212-S7Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
03/29/2015340242437Open ↗
02/26/2015340233982Open ↗
02/24/2015340233385Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
03/29/2015340242437Open ↗
02/26/2015340233982Open ↗
02/24/2015340233385Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
03/29/2015340242437Open ↗
02/26/2015340233982Open ↗
02/24/2015340233385Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/17/2011320272824Open ↗
03/18/2010320137053Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/17/2011320272824Open ↗
03/18/2010320137053Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
09/01/2026B00478212-S4Open ↗
09/01/2026B00478212-S3Open ↗
09/01/2026B00478212-S1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)3
05/10/2011320137053Open ↗
05/10/2011320137053Open ↗
03/29/2015340242437Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/25/2016340242437Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/17/2011320272824Open ↗
▸Energy Compliance10
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026B00478212-S4Open ↗
08/13/2026B00478212-S3Open ↗
08/13/2026B00478212-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/25/2016340242437Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/29/2015340242437Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/25/2016340242437Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/26/2015340233982Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/29/2015340242437Open ↗
▸BISNYCECC ANALYSIS1
03/29/2015340242437Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/26/2015340233982Open ↗
02/24/2015340233385Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/29/2015340242437Open ↗
▸Approvals, Objections & Sign-offs37
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
09/01/2026B00478212-P1Open ↗
09/01/2026B00478212-S4Open ↗
09/01/2026B00478212-S3Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDEP Variance (V5) letter7
09/01/2026B00478212-S2Open ↗
09/01/2026B00478212-S4Open ↗
09/01/2026B00478212-S3Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
02/25/2016340242437Open ↗
01/11/2016340233982Open ↗
01/11/2016340233385Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/11/2016340233982Open ↗
01/11/2016340233385Open ↗
06/12/2013340064833Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
02/17/2011320272824Open ↗
03/18/2010320137053Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
02/25/2016340242437Open ↗
02/25/2016340242437Open ↗
08/24/2011320137053Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET4
03/29/2015340242437Open ↗
02/26/2015340233982Open ↗
02/24/2015340233385Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
02/17/2011320272824Open ↗
03/18/2010320137053Open ↗
▸Other Documents2
▸BISFEE EXEMPTION DOCUMENTATION1
05/23/2013340064833Open ↗
▸DOB NOWWaiver Document1
08/13/2026B00478212-S4Open ↗