Public elementary, junior or senior high
It Takes a Village Academy
5800 TILDEN AVENUE · BIN 3104598
💬 Discuss this project
1929Year Built
4Stories
W1Building Class
R4Zoning
302,208 sfGross Floor Area
1Units
LL97 Covered52 Open Violations 30 unresolved · 22 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 276,000 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction32p · 3 filings · 20 docs
Floor 3Under Construction39p · 2 filings · 20 docs
Floor 2Under Construction35p · 3 filings · 20 docs
Floor 1Under Construction38p · 5 filings · 20 docs
CellarUnder Construction13p · 2 filings · 20 docs
BasementUnder Construction12p · 4 filings · 20 docs
Sub-BasementUnder Construction46p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHOR9009/29/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION3003/22/2026
DOE 0401103/22/2026
DOE 041103/22/2026
DOE SAMUEL TILDEN HS 040403/22/2026
DEPT. OF EDUCATION 0103/22/2026
DEPARTMENT OF EDUCATION 0403/22/2026
P.S 285 DOE103/22/2026
BOARD OF EDUCATION 040203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.803/21/2026
STEPHEN B JACOBS GROUP1203/21/2026
RA3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KG CONSTRUCTION SERVICESGeneral Contractor1209/25/2026
A.T.J. ELECTRICAL CO INCGeneral Contractor1207/08/2026
AIRTONE CORPGeneral Contractor909/10/2026
A T J ELECTRICAL CO INC 000033General Contractor603/22/2026
ANDREW DRAZICElectrical603/21/2026
WDF INCGeneral Contractor403/21/2026
AIR-TEK MECHANICAL INCGeneral Contractor407/08/2026
MAR-SAL PLBG & HTG, INCPlumbing309/29/2026
WDF INCPlumbing207/08/2026
PELUSO, RALPHElectrical203/21/2026
RODEL ELEC'L CONTR'S, INElectrical203/22/2026
DIERKS, JOHNFire Protection203/21/2026
EAGLE 1 MECHANICAL, INCPlumbing207/08/2026
TRIUMPH PLUMBING & HTGPlumbing107/08/2026
LENDER, HElectrical103/21/2026
HENRY KHODOSHElectrical103/21/2026
GRELLER, JOHNElectrical103/21/2026
GIOVANNI DITURIElectrical103/21/2026
GARY EATONElectrical103/21/2026
FRANCIS RICHARDSElectrical103/21/2026
ZIAUR BHUIYANGeneral Contractor106/27/2026
PACIFIC ELEC'L CONTR'G INElectrical103/22/2026
A & S ELECTRIC INC.Electrical103/22/2026
DEREK MOHANElectrical103/21/2026
ZUCKERBERG, CHARLESElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUNICIPAL TESTING LABORAT2302011/10/2025
JPC LOGISTICS DBA JPCL EN351310/31/2025
TWIN PEAKS INC.317701/02/2024
Building Lifecycle
All (212)Filed (33)Permit Issued (35)Violation (60)Inspection (10)Objection (44)Special Inspection (30)
09/28/2026
Permit issued — Plumbing
B00960067-S1-PL
09/24/2026
Permit issued — General Construction
B00960067-I1-GC
09/09/2026
Permit issued — Mechanical Systems
B00960067-S2-MS
09/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2026
Permit issued — Plumbing
B00809916-S1-PL
06/08/2026
Permit issued — Mechanical Systems
B00960067-S2-MS
06/05/2026
Permit issued — General Construction
B00809916-I1-GC
04/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2026
Violation issued (ECB, open)
Construction
04/03/2026
Objection resolved — Addressed
03/03/2026
Objection resolved — Addressed
03/02/2026
Objection raised — Admin
12/29/2025
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
12/29/2025
Special inspection requirement — Mechanical Systems
STEPHEN LATUS
12/29/2025
Special inspection requirement — Final
STEPHEN LATUS
12/29/2025
Special inspection requirement — Final
STEPHEN LATUS
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
12/24/2025
Permit issued — Plumbing
B00996506-S1-PL
12/23/2025
Violation issued (ECB, open)
Elevators
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/10/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/20/2025
Objection raised — Other
11/20/2025
Objection raised — Admin
11/14/2025
Objection raised — Zoning
11/10/2025
Filed — Alteration
Removal of existing pneumatic thermostat and installing new electric thermostat, removal of existing radiator and existing unit ventilator , associate pipes and valves. Installing Fan-Coil Unit - Heating & Ventilation, New Inline Exhaust, Electric BB Htr
B00941753-P4
11/10/2025
Filed — Alteration
Removal of existing pneumatic thermostat and installing new electric thermostat, removal of existing radiator and existing unit ventilator , associate pipes and valves. Installing Fan-Coil Unit - Heating & Ventilation, New Inline Exhaust, Electric BB Htr
B00941753-P3
11/10/2025
Special inspection requirement — Post-installed Anchors
STEPHEN LATUS
11/10/2025
Special inspection requirement — Mechanical Systems
STEPHEN LATUS
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
11/10/2025
Special inspection requirement — Final
STEPHEN LATUS
11/10/2025
Special inspection requirement — Final
STEPHEN LATUS
10/31/2025
Filed — Alteration
INSTALLATION OF NEW SUPPLEMENTAL COOLING SPLIT AC SYSTEM IN 1ST FLOOR KITCHEN.
B01302540-I1
10/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
STEPHEN LATUS
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
10/27/2025
Permit issued — Plumbing
B00960067-S1-PL
10/20/2025
Permit issued — General Construction
B00996506-I1-GC
10/20/2025
Permit issued — General Construction
B00960067-I1-GC
10/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
STEPHEN LATUS
10/15/2025
Permit issued — General Construction
B00972547-I1-GC
10/15/2025
Permit issued — Construction Fence
B08002013-I1-FN
10/14/2025
Filed — Alteration
Removal One (1) Non Compliant drinking fountain along the Path Of Travel. Removal portion of Glazed Tile surrounding the existing drinking fountains. Provide One (1) Dual drinking fountain sets, one accessible and one standard Non ADA hgt w/btl filler.
B00996506-P2
10/14/2025
Filed — Alteration
Removal One (1) Non Compliant drinking fountain along the Path Of Travel. Removal portion of Glazed Tile surrounding the existing drinking fountains. Provide One (1) Dual drinking fountain sets, one accessible and one standard Non ADA hgt w/btl filler.
B00996506-P3
10/14/2025
Special inspection requirement — Final
Asma Hashmi
10/14/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
10/14/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
09/10/2025
Permit issued — Mechanical Systems
B00960067-S2-MS
08/27/2025
Violation issued (FDNY_ORDER, closed)
07/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/13/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/10/2025
Objection resolved — Addressed
06/09/2025
Permit issued — Mechanical Systems
B00960067-S2-MS
05/19/2025
Violation issued (ECB, open)
Construction
05/16/2025
Objection raised — Scope
05/12/2025
Filed — Alteration
THE SCOPE OF WORK INCLUDES ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO COMPLETE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEM IN THE AUDITORIUM AND STAGE AREA.
B01192636-I1
Latest 60 of 212 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMAR-SAL PLBG & HTG, INC09/28/2026
DOB NOWGeneral ConstructionPermit IssuedKG CONSTRUCTION SERVICES09/24/2026
DOB NOWMechanical SystemsPermit IssuedAIRTONE CORP09/09/2026
DOB NOWPlumbingPermit IssuedTRIUMPH PLUMBING & HTG06/11/2026
DOB NOWMechanical SystemsPermit IssuedAIRTONE CORP06/08/2026
DOB NOWGeneral ConstructionPermit IssuedZIAUR BHUIYAN06/05/2026
DOB NOWPlumbingPermit IssuedEAGLE 1 MECHANICAL, INC12/24/2025
DOB NOWPlumbingPermit IssuedMAR-SAL PLBG & HTG, INC10/27/2025
DOB NOWGeneral ConstructionPermit IssuedA.T.J. ELECTRICAL CO INC10/20/2025
DOB NOWGeneral ConstructionPermit IssuedSTALCO10/20/2025
DOB NOWGeneral ConstructionPermit IssuedSTALCO10/15/2025
DOB NOWConstruction FencePermit IssuedSTALCO10/15/2025
DOB NOWMechanical SystemsPermit IssuedAIRTONE CORP09/10/2025
DOB NOWMechanical SystemsPermit IssuedAIRTONE CORP06/09/2025
DOB NOWGeneral ConstructionPermit IssuedA.T.J. ELECTRICAL CO INC02/07/2025
DOB NOWPlumbingPermit IssuedEAGLE 1 MECHANICAL, INC12/04/2024
DOB NOWPlumbingPermit IssuedMAR-SAL PLBG & HTG, INC11/25/2024
DOB NOWMechanical SystemsPermit IssuedAIRTONE CORP11/25/2024
DOB NOWGeneral ConstructionPermit IssuedSTALCO11/14/2024
DOB NOWGeneral ConstructionPermit IssuedSTALCO11/07/2024
DOB NOWConstruction FencePermit IssuedSTALCO10/21/2024
DOB NOWGeneral ConstructionPermit IssuedA.T.J. ELECTRICAL CO INC09/30/2024
DOB NOWGeneral ConstructionPermit IssuedA.T.J. ELECTRICAL CO INC09/30/2024
DOB NOWMechanical SystemsPermit IssuedAIR-TEK MECHANICAL INC07/31/2024
DOB NOWGeneral ConstructionPermit IssuedA.T.J. ELECTRICAL CO INC06/06/2024
DOB NOWMechanical SystemsPermit IssuedAIR-TEK MECHANICAL INC05/30/2024
DOB NOWConstruction FencePermit IssuedSTALCO10/24/2023
DOB NOWGeneral ConstructionPermit IssuedA.T.J. ELECTRICAL CO INC09/28/2023
DOB NOWGeneral ConstructionPermit IssuedA.T.J. ELECTRICAL CO INC09/27/2023
DOB NOWPlumbingPermit IssuedWDF INC08/10/2023
DOB NOWGeneral ConstructionPermit IssuedWDF INC08/10/2023
DOB NOWMechanical SystemsSigned-offWDF INC06/22/2023
DOB NOWPlumbingPermit IssuedWDF INC06/20/2023
DOB NOWGeneral ConstructionPermit IssuedA.T.J. ELECTRICAL CO INC05/22/2023
DOB NOWConstruction FencePermit IssuedSTALCO10/25/2022
BISOTISSUEDKG CONSTRUCTION SERVICES03/02/2026
BISOTISSUEDKG CONSTRUCTION SERVICES03/02/2026
BISOTISSUEDKG CONSTRUCTION SERVICES03/02/2026
BISPLISSUEDMAR-SAL PLBG & HTG, INC01/15/2026
BISPLISSUEDVARSITY PLBG AND HTG INC10/14/2025
+ 45 more permits on file
6 projects · most recent 11/10/2025
Ventilation Systems Heating and Air Conditioning Systems Heating Systems Air Conditioning Systems Associated Ducts and Piping Others
FiledStatusContractorScopeMake / Model / Capacity
11/10/2025Permit IssuedA.T.J. ELECTRICAL CO INCAssociated Ducts and Piping, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric 4TTR6060N 230 kW ×3
BCHE054 1,200 CFM · Vrf Outdoor ×3
Heating
Vulcan SB-2150 1,023 BTU · Radiant ×3
SB-6100 2,046 BTU · Radiant ×3
Ventilation
Greenheck SQ-90-VG 420 CFM · Exhaust Fan ×3
Ducts & Piping
Titus 350RL 350 CFM · Exhaust Fan ×9
TMS 400 CFM ×6
10/31/2025——Air Conditioning Systems
Cooling
Lg LG ZRNU363SRAA 35,000 BTU · Vrf Indoor ×3
ZRUM121BTE6 119,000 BTU · Vrf Outdoor ×1
05/12/2025——Air Conditioning Systems
Cooling
Fujitsu FUJITSU - ASUA36TLAV2 34,000 BTU · Fan Coil Indoor ×20
FUJITSU - AOU120RLAVL 120,000 BTU · Vrf Outdoor ×5
FUJITSU AOU72RLAV 72,000 BTU · Vrf Outdoor ×1
06/20/2024Permit IssuedA.T.J. ELECTRICAL CO INCHeating Systems, Ventilation Systems
Heating
Vulcan LB-4500 6,826 BTU · Radiant ×8
Magic-Aire HCA12AAAA15RGABACCCAABAM 700 CFM ×2
Ventilation
Greenheck SQ-98-VG-X 700 CFM · Exhaust Fan ×2
01/02/2024Permit IssuedKG CONSTRUCTION SERVICESOthers, Ventilation Systems
Ventilation
Greenheck CUBE-240HP 2,152 CFM · Exhaust Fan ×1
Other
Greenheck MSX-P116-H22-MF 2,152 CFM · Makeup Air ×3
10/12/2023Permit IssuedZIAUR BHUIYANHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric TRKA0A0351KA70A 36,000 BTU · Split System ×2
TRUZA036KA70NA 3 tons · Vrf Outdoor ×2
4 projects · most recent 06/20/2024
Water/Sanitary Gas
FiledStatusContractorScope
06/20/2024Permit IssuedWDF INCWater/Sanitary
06/17/2024Permit IssuedWDF INCWater/Sanitary
01/02/2024Permit IssuedMAR-SAL PLBG & HTG, INCGas, Water/Sanitary
10/12/2023Permit IssuedTRIUMPH PLUMBING & HTGWater/Sanitary
25 projects · most recent 07/27/2026
General Wiring Lighting
FiledStatusContractorScope
07/27/2026Permit IssuedCORE ELECTRIC MEP INDS LLGeneral Wiring, Lighting
04/17/2026CompleteKET ELECTRIC LLCGeneral Wiring
11/25/2025Permit IssuedURBAN ELECTRICAL CORPGeneral Wiring
11/14/2025Permit IssuedRODEL ELEC'L CONTR'S, INGeneral Wiring
11/12/2025Permit IssuedA & S ELECTRIC INC.General Wiring
07/07/2025CompleteRODEL ELEC'L CONTR'S, INGeneral Wiring
05/13/2025CompleteA.T.J. ELECTRICAL CO.INC.—
03/26/2025CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
11/27/2024CompleteKANTA ELECTRIC CORP.—
11/13/2024CompleteEVEREST ELECTRIC CORP—
11/12/2024CompleteEVEREST ELECTRIC CORP—
10/03/2024CompleteJAMCOB ELECTRIC LLCGeneral Wiring
04/16/2024CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
11/21/2023CompleteGEMINI ELECTRIC CO., INC.—
09/14/2023CompletePACIFIC ELEC'L CONTR'G INGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/13/2025Fail-Final CND-Occupancy InspectionFailView ↗
03/18/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/01/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/10/2023Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
12/29/2025Post-installed AnchorsSTEPHEN LATUSspecial
12/29/2025Mechanical SystemsSTEPHEN LATUSspecial
12/29/2025FinalSTEPHEN LATUSprogress
12/29/2025Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
12/29/2025FinalSTEPHEN LATUSprogress
12/29/2025Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
11/10/2025FinalSTEPHEN LATUSprogress
11/10/2025Mechanical SystemsSTEPHEN LATUSspecial
11/10/2025FinalSTEPHEN LATUSprogress
11/10/2025Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
11/10/2025Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
11/10/2025Post-installed AnchorsSTEPHEN LATUSspecial
10/30/2025Fire-Resistance Rated ConstructionSTEPHEN LATUSprogress
10/30/2025Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
10/16/2025Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
10/14/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
10/14/2025Post-installed AnchorsAsma Hashmispecial
10/14/2025Mechanical SystemsAsma Hashmispecial
10/14/2025FinalAsma Hashmiprogress
03/10/2025FinalAsma Hashmiprogress
03/10/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
03/10/2025Post-installed AnchorsAsma Hashmispecial
03/10/2025Mechanical SystemsAsma Hashmispecial
03/10/2025Energy Code Compliance InspectionsAsma Hashmiprogress
08/22/2024Fire-Resistance Rated Construction—progress
Latest 25 of 70.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
IT Takes A Village AcademysEducation—
Project B00833707 Alteration · Permit Entire · 02/24/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 252 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch33
08/28/2026B00797429-P1Request digital key ↗
08/28/2026B00797429-P2Request digital key ↗
08/28/2026B00797429-S1Request digital key ↗
Showing 3 of 33 on file for this type
▸Seals & Professional Certifications74
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/28/2026B00797429-S1Open ↗
08/28/2026B00797429-I1Open ↗
08/28/2026B08002013-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/25/2026B00797429-S2Open ↗
09/19/2026B00809916-S1Open ↗
09/19/2026B00809916-S1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026B00941753-P4Open ↗
08/29/2026B00941753-S1Open ↗
08/28/2026B00797429-S1Open ↗
Showing 3 of 13 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026B08002013-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026B00960067-S1Open ↗
08/26/2026B00960067-S2Open ↗
08/26/2026B00960067-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026B00941753-I1Open ↗
08/13/2026B00996506-I1Open ↗
▸Approvals, Objections & Sign-offs89
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter33
08/28/2026B00797429-S1Open ↗
08/27/2026B00833707-I1Open ↗
08/25/2026B00996506-P1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)31
08/28/2026B00797429-S1Open ↗
08/27/2026B00833707-I1Open ↗
08/25/2026B00996506-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)14
08/13/2026B00797429-I1Open ↗
08/13/2026B00797429-S1Open ↗
08/13/2026B00797429-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP Variance (V5) letter11
08/15/2026B00809916-S1Open ↗
08/15/2026B00809916-I1Open ↗
08/13/2026B00833707-S1Open ↗
Showing 3 of 11 on file for this type
▸Other Documents48
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal31
08/28/2026B00797429-S1Open ↗
08/27/2026B00833707-I1Open ↗
08/25/2026B00996506-S1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProof of Historic Building17
08/27/2026B00833707-I1Open ↗
08/25/2026B00996506-P1Open ↗
08/25/2026B00996506-I1Open ↗
Showing 3 of 17 on file for this type