← Back
Primarily 2 family with 1 store or office
5802 7 AVENUE
BROOKLYN · BIN 3324484
💬 Discuss this project
1910Year Built
3Stories
S2Building Class
R7AZoning
3,240 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · 2,003 sf lot · 1.62 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Floor 1Under Construction1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MR WISH NATURAL FRUIT TEA INC1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YOU GAO406/16/2026
LEON SKVIRSKY PE103/18/2025
BASSIRI312/11/2024
HUAN DESIGN INC.510/30/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO603/21/2026
BUILDING BROTHERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEPTUNE SIGNS AWNINGSScaffold209/29/2026
NY BUILDING ASSOCIATES INGeneral Contractor203/21/2026
KJK ELECTRIC INCElectrical103/22/2026
W.R. PLBG AND HTG CORPPlumbing106/28/2026
PAUL SIGNSScaffold107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
MERCURY BUILDING ASSOGeneral Contractor106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YOU GAO9407406/16/2026
HUAN DESIGN INC7669410/30/2023
Building Lifecycle
All (69)Filed (13)Permit Issued (7)Signed Off (3)Violation (4)Inspection (2)Objection (10)Special Inspection (30)
09/28/2026
Permit issued — Sign
B01417292-I1-SG
09/28/2026
Permit issued — Sign
B01417303-I1-SG
06/22/2026
Permit issued — General Construction
B01403697-I1-GC
06/22/2026
Permit issued — Plumbing
B01403697-S1-PL
06/16/2026
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01417292-I1
06/16/2026
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01417303-I1
06/15/2026
Special inspection requirement — Final
You Gao
06/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
You Gao
06/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
You Gao
06/15/2026
Special inspection requirement — Final
You Gao
06/12/2026
Filed — Alteration
FILE PLUMBING WORK FOR COMMERCIAL SPACE AT 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01403697-S1
06/12/2026
Filed — Alteration
FILE PLUMBING WORK FOR COMMERCIAL SPACE AT 1ST FLOOR AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01403697-I1
06/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
You Gao
06/09/2026
Special inspection requirement — Energy Code Compliance Inspections
You Gao
06/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
You Gao
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
05/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
You Gao
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
You Gao
05/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
You Gao
05/18/2026
Special inspection requirement — Interior lighting power
You Gao
06/03/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (MR. WISH)
B01186858-I1
03/21/2025
Permit issued — Sign
B01186858-I1-SG
03/18/2025
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED WALL SIGN (MR. WISH)
B01186858-I1
12/11/2024
Filed — Alteration
B01154534-I1
11/26/2024
Violation issued (ECB, closed)
Construction
11/26/2024
Violation issued (ECB, closed)
Construction
02/12/2024
Objection raised — Zoning
02/12/2024
Objection raised — Scope
02/12/2024
Objection raised — Energy
02/12/2024
Objection raised — Zoning
02/12/2024
Objection raised — Energy
02/12/2024
Objection raised — Energy
02/12/2024
Objection raised — Zoning
02/12/2024
Objection raised — Other
02/08/2024
Objection raised — Other
02/08/2024
Objection raised — Scope
02/02/2024
Filed — Alteration
INSTALL NEW AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00997999-I1
02/02/2024
Filed — Alteration
INSTALL NEW ILLUMINATED SIGN READ "MR. WISH" AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00997998-I1
12/08/2023
Violation issued (ECB, closed)
Construction
11/01/2023
Signed off — Alteration
TO PROPOSE RENOVATION OF EXISTING COMMERCIAL SPACE AT 001 FLOOR WITH GENERAL CONSTRUCTION AND MECHANICAL WORKS AS PER PLAN FILED HEREWITH, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00866150-I1
10/30/2023
Signed off — Alteration
TO PROPOSE PLUMBING WORK OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR IN CONJUNCTION WITH GENERAL CONSTRUCTION JOB #B00866150 AS PER PLAN FILED HEREWITH, NO CHANGE OF USES, EGRESS OR OCCUPANCY.
B00866164-I1
10/30/2023
Filed — Alteration
TO PROPOSE RENOVATION OF EXISTING COMMERCIAL SPACE AT 001 FLOOR WITH GENERAL CONSTRUCTION AND MECHANICAL WORKS AS PER PLAN FILED HEREWITH, NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B00866150-P1
10/23/2023
Special inspection requirement — Tenant Protection Plan Compliance
10/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
10/18/2023
Special inspection requirement — Mechanical Systems
ZHENHUAN XU
10/18/2023
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
10/18/2023
Special inspection requirement — Final
ZHENHUAN XU
10/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
ZHENHUAN XU
10/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ZHENHUAN XU
10/18/2023
Special inspection requirement — Air barrier - visual inspection
ZHENHUAN XU
10/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
ZHENHUAN XU
10/18/2023
Special inspection requirement — Interior lighting power
ZHENHUAN XU
10/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
ZHENHUAN XU
10/18/2023
Special inspection requirement — Fenestration air leakage
ZHENHUAN XU
10/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
ZHENHUAN XU
10/18/2023
Special inspection requirement — Fenestration areas
ZHENHUAN XU
08/30/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/16/2023
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedNEPTUNE SIGNS&AWNINGS INC09/28/2026
DOB NOWSignPermit IssuedNEPTUNE SIGNS&AWNINGS INC09/28/2026
DOB NOWGeneral ConstructionPermit IssuedMERCURY BUILDING ASSO INC06/22/2026
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP06/22/2026
DOB NOWSignSigned-offPAUL SIGNS, INC03/21/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.05/05/2023
DOB NOWGeneral ConstructionSigned-offNY BUILDING ASSOCIATES IN05/05/2023
1 project · most recent 06/12/2026
Water/Sanitary
FiledStatusContractorScope
06/12/2026Signed-offW.R. PLBG AND HTG CORPWater/Sanitary
4 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026Permit IssuedJ Y ELECTRIC INCGeneral Wiring
12/19/2024CompleteKJK ELECTRIC INCGeneral Wiring
04/24/2023CompleteGOODALL ELECTRIC CORP—
01/05/2018CompleteLENS ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
06/15/2026FinalYou Gaoprogress
06/15/2026Structural Stability – Alterations of existing buildingsYou Gaospecial
06/15/2026Structural Stability – Alterations of existing buildingsYou Gaospecial
06/15/2026FinalYou Gaoprogress
06/09/2026HVAC-R and service water piping design and insulationYou Gaoenergy_progress
06/09/2026Energy Code Compliance InspectionsYou Gaoprogress
06/09/2026Tenant Protection Plan ComplianceYou Gaospecial
06/09/2026Fire-Resistant Penetrations and JointsYou Gaospecial
05/18/2026Fire-Resistant Penetrations and JointsYou Gaospecial
05/18/2026Tenant Protection Plan ComplianceYou Gaospecial
05/18/2026Energy Code Compliance InspectionsYou Gaoprogress
05/18/2026Fire-Resistance Rated ConstructionYou Gaoprogress
05/18/2026Interior lighting powerYou Gaoenergy_progress
10/23/2023Tenant Protection Plan Compliance—special
10/18/2023Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
10/18/2023Mechanical SystemsZHENHUAN XUspecial
10/18/2023Energy Code Compliance InspectionsZHENHUAN XUprogress
10/18/2023FinalZHENHUAN XUprogress
10/18/2023Fire-Resistance Rated ConstructionZHENHUAN XUprogress
10/18/2023HVAC-R and service water piping design and insulationZHENHUAN XUenergy_progress
10/18/2023Air barrier - visual inspectionZHENHUAN XUenergy_progress
10/18/2023Fenestration and door U-factor and product ratingsZHENHUAN XUenergy_progress
10/18/2023Interior lighting powerZHENHUAN XUenergy_progress
10/18/2023HVAC-R and service water heating system controlsZHENHUAN XUenergy_progress
10/18/2023Fenestration air leakageZHENHUAN XUenergy_progress
Latest 25 of 33.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/27/2026B00866150-I1Request digital key ↗
08/27/2026B00866150-P1Request digital key ↗
08/27/2026B00866164-P2Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026B00866150-I1Open ↗
08/27/2026B00866150-P1Open ↗
08/27/2026B00866164-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/08/2026B00866164-P2Open ↗
09/01/2026B00866150-P1Open ↗
09/01/2026B00866150-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00866150-P1Open ↗
09/01/2026B01403697-I1Open ↗
08/28/2026B01417303-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/27/2026B00866150-P1Open ↗
08/27/2026B00866150-I1Open ↗
08/27/2026B00866164-P2Open ↗
Showing 3 of 10 on file for this type