← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Happy Dragon - Brooklyn
5805 7TH AVENUE · BIN 3016180
💬 Discuss this project
2006Year Built
7Stories
RMBuilding Class
R7AZoning
33,079 sfGross Floor Area
29Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 7,317 sf lot · 4.52 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAlteration 13p · 3 filings · 20 docs
Floor 7Redesign kitchen and dining area, add pantry1p · 1 filing · 20 docs
Floor 6Redesign kitchen and dining area, add pantry1p · 1 filing · 20 docs
Floor 5Redesign kitchen and dining area, add pantry1p · 1 filing · 20 docs
Floor 4Unit 4D1p · 2 filings · 20 docs
Floor 3Redesign kitchen and dining area, add pantry1p · 1 filing · 20 docs
Floor 2Redesign kitchen and dining area, add pantry1p · 1 filing · 20 docs
Floor 1Redesign kitchen and dining area, add pantry1p · 1 filing · 20 docs
CellarRedesign kitchen and dining area, add pantry3p · 2 filings · 20 docs
BasementAlteration 18p · 4 filings · 20 docs
Sub-Basement5p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hang Seng Capital Group4203/21/2026
Hang Seng Tower408/29/2026
USA Beauty School303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chen Consulting Engineering105/27/2026
S M Tam Architect304/06/2026
H2 Consulting PE501/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H2 Consulting PE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QMB Plumbing & HeatingPlumbing307/08/2026
Harry HongElectrical103/21/2026
JD ArchGeneral Contractor107/08/2026
NY Building AssociatesGeneral Contractor107/08/2026
Power RHCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD Testing & Inspection S7010204/06/2026
H2 Consulting PE835401/25/2023
Building Lifecycle
All (150)Filed (9)Permit Issued (4)Signed Off (4)Facade (FISP) (6)Violation (60)Inspection (4)Objection (45)Special Inspection (18)
07/29/2026
Signed off — Alteration CO
CONVERT EXIST. COMMERCIAL SPACE @ BASEMENT INTO COMMUNITY CENTER. NON-STRUCTURAL PARTITION CHANGES PER PLAN. NO CHANGE ON EXISTING BUILDING BULK. OBTAIN NEW C/O.
B01294005-I1
05/27/2026
Filed — Alteration
HEREWITH FILING FOR INSTALLATION OF SANITARY DRAINAGE AND DOMESTIC WATER PIPING SYSTEM. NEW PLUMBING EQUIPMENT AND APPLIANCE TO BE INSTALLED AS PART OF THE INTERIOR RENOVATION OF EXISTING APARTMENT UNIT. NO CHANGES TO OCCUPANCY, EGRESS, OR USE.
B01372215-I1
05/01/2026
Special inspection requirement — Lighting controls
XIUCHENG LI
05/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
XIUCHENG LI
05/01/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
05/01/2026
Special inspection requirement — Interior lighting power
XIUCHENG LI
04/16/2026
Objection raised — Scope
04/06/2026
Filed — Alteration CO
CONVERT EXIST. COMMERCIAL SPACE @ BASEMENT INTO COMMUNITY CENTER. NON-STRUCTURAL PARTITION CHANGES PER PLAN. NO CHANGE ON EXISTING BUILDING BULK. OBTAIN NEW C/O.
B01294005-P1
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
04/06/2026
Special inspection requirement — Lighting controls
XIUCHENG LI
04/06/2026
Special inspection requirement — Interior lighting power
XIUCHENG LI
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
XIUCHENG LI
04/01/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/03/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/06/2026
Permit issued — General Construction
B01294005-I1-GC
12/22/2025
Objection resolved — Addressed
12/19/2025
Objection raised — Fire_Protection
12/19/2025
Objection resolved — Addressed
12/19/2025
Objection raised — Structural
12/19/2025
Objection raised — Fire_Protection
12/19/2025
Objection raised — Fire_Protection
12/19/2025
Objection raised — Fire_Protection
12/19/2025
Objection resolved — Addressed
12/19/2025
Objection raised — Fire_Protection
12/19/2025
Objection resolved — Addressed
12/17/2025
Filed — No Work
B01293933-I1
12/04/2025
Objection resolved — Addressed
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/2025
Objection raised — Energy
11/12/2025
Objection raised — Cost
11/12/2025
Objection resolved — Addressed
11/12/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/07/2025
Objection raised — Scope
11/07/2025
Objection raised — Fire_Protection
11/03/2025
Objection raised — Zoning
10/28/2025
Objection resolved — Addressed
10/10/2025
Objection raised — Admin
10/02/2025
Filed — Alteration CO
CONVERT EXIST. COMMERCIAL SPACE @ BASEMENT INTO COMMUNITY CENTER. NON-STRUCTURAL PARTITION CHANGES PER PLAN. NO CHANGE ON EXISTING BUILDING BULK. OBTAIN NEW C/O.
B01294005-I1
09/26/2025
Special inspection requirement — Public Assembly Emergency Lighting
XIUCHENG LI
08/05/2024
Cycle 9 facade report signed — SWARMP
07/18/2024
Cycle 9 facade report submitted
07/16/2024
Cycle 9 facade inspection completed
05/16/2024
Violation issued (ECB, closed)
Local Law
08/29/2023
Violation issued (HPD, closed)
C
08/29/2023
Violation issued (HPD, closed)
C
08/29/2023
Violation issued (HPD, closed)
C
08/29/2023
Violation issued (HPD, closed)
B
08/29/2023
Violation issued (HPD, closed)
C
07/07/2023
Violation issued (HPD, closed)
C
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/30/2023
Signed off — Alteration CO
INSTALL PARTITIONS ON BASEMENT FLOOR. CHANGE BASEMENT FLOOR USE FROM BUSINESS SCHOOL (UG 9) TO COFFEE SHOP (UG 6) AND COMMUNITY CENTER ADULT DAYCARE CENTER (UG 4). OBTAIN NEW CERTIFICATE OF OCCUPANCY.
B00582607-I1
01/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Harry Hong
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPower RHC01/06/2026
DOB NOWMechanical SystemsPermit IssuedNY Building Associates11/17/2022
DOB NOWPlumbingSigned-offQMB Plumbing & Heating03/28/2022
DOB NOWGeneral ConstructionPermit IssuedJD Arch03/03/2022
BISPLISSUEDFlytiger P & H07/13/2017
BISOTISSUEDNeptune08/18/2010
BIS—ISSUEDHong Kong Style Construction03/05/2010
BISOTISSUEDHong Kong Style Construction02/26/2010
BISPLISSUEDS & L Plumbing02/26/2010
BISPLISSUEDCatman Plumbing01/14/2010
BISOTISSUEDHong Kong Style Construction01/13/2010
BISPLISSUEDFlytiger P & H04/09/2008
BISSPISSUEDFlytiger PLB & Heating04/09/2008
BISEQISSUEDRockledge Scaffold01/17/2008
BISEQISSUED98 Construction12/27/2007
BISMHISSUEDYung Fong Construction11/13/2007
BIS—ISSUED98 Construction10/29/2007
BISEQISSUEDYung Fong Construction06/05/2007
BISSPISSUEDFlytiger PLB & Heating04/02/2007
BISPLISSUEDFlytiger P & H04/02/2007
BISPLISSUEDFlytiger P & H02/27/2007
BIS—ISSUEDYung Fong Construction12/08/2006
BISEQISSUEDYung Fong Construction12/08/2006
BIS—ISSUEDYung Fong Construction11/03/2006
BISOTISSUEDYung Fong Construction04/19/2006
BISEQISSUEDYung Fong Construction12/19/2005
BIS—ISSUEDYung Fong Construction12/19/2005
BISEQISSUEDYung Fong Construction09/22/2005
BISEQISSUEDYung Fong Construction09/19/2005
BISEQISSUEDFinal Contrng06/22/2005
BISEQISSUEDFinal Contrng06/22/2005
BIS—ISSUEDFinal Contrng06/22/2005
BIS—ISSUEDFinal Contrng06/22/2005
BISPLISSUEDAljer Plumbing & Heating01/11/1995
BIS—ISSUEDN/A09/27/1994
1 project · most recent 05/27/2026
Water/Sanitary
FiledStatusContractorScope
05/27/2026——Water/Sanitary
3 projects · most recent 06/25/2026
General Wiring
FiledStatusContractorScope
06/25/2026CompleteJ Y Electric—
01/20/2026CompleteW 8 ElectricGeneral Wiring
02/22/2022CompleteKwong Ming ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/01/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/25/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/01/2026Lighting controlsXIUCHENG LIenergy_progress
05/01/2026Tenant Protection Plan ComplianceXIUCHENG LIspecial
05/01/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
05/01/2026Interior lighting powerXIUCHENG LIenergy_progress
04/06/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
04/06/2026Lighting controlsXIUCHENG LIenergy_progress
04/06/2026Interior lighting powerXIUCHENG LIenergy_progress
04/06/2026Tenant Protection Plan ComplianceXIUCHENG LIspecial
09/26/2025Public Assembly Emergency LightingXIUCHENG LIprogress
01/26/2023Fire-Resistant Penetrations and JointsHarry Hongspecial
01/26/2023Lighting controlsHarry Hongenergy_progress
01/26/2023Interior lighting powerHarry Hongenergy_progress
12/31/2022Interior lighting powerHarry Hongenergy_progress
12/31/2022Lighting controlsHarry Hongenergy_progress
12/31/2022Fire-Resistant Penetrations and JointsHarry Hongspecial
08/04/2022Fire-Resistant Penetrations and JointsHarry Hongspecial
08/04/2022Interior lighting powerHarry Hongenergy_progress
08/04/2022Lighting controlsHarry Hongenergy_progress
▾Documents — 139 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/31/2026B00621084-I1Request digital key ↗
08/28/2026B00582607-P3Request digital key ↗
08/28/2026B00621044-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/19/2026B01293933-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION10
07/12/2017321618237Open ↗
02/22/2011320093983Open ↗
04/05/2010320093983Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION9
07/13/2017321618237Open ↗
08/26/2010320113113Open ↗
08/26/2010320113113Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/09/2010320093983Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026B01294005-I1Open ↗
08/13/2026B00582607-I1Open ↗
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
01/20/2010320093983Open ↗
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026B00582607-P2Open ↗
09/02/2026B00582607-P2Open ↗
09/02/2026B01294005-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
08/16/2017321618237Open ↗
07/12/2017321618237Open ↗
02/16/2011320113113Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/31/2026B00621084-I1Open ↗
08/28/2026B00582607-P3Open ↗
08/28/2026B00582607-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B00582607-P2Open ↗
09/02/2026B01294005-P1Open ↗
08/30/2026B00582607-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/12/2017321618237Open ↗
12/30/2009320113113Open ↗
09/09/2008310192939Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
12/30/2009320113113Open ↗
09/09/2008310192939Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/12/2017321618237Open ↗
▸Trade Schedules & Equipment11
▸BISSELF-CERT PLUMBING NOTICE5
12/29/2010320113113Open ↗
12/29/2010320113113Open ↗
11/17/2010320113113Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
03/23/2010320094722Open ↗
12/30/2009320113113Open ↗
11/19/2009320094722Open ↗
▸BISEQUIPMENT USE PERMITS1
01/03/2011320094722Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/12/2017321618237Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/03/2011320094722Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
08/28/2026B00582607-P3Open ↗
08/17/2026B01294005-P1Open ↗
08/15/2026B00582607-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes1
07/12/2017321618237Open ↗
▸BISSTREET TREE CHECKLIST1
11/17/2009320093983Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
12/30/2009320113113Open ↗
11/19/2009320094722Open ↗
11/17/2009320093983Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00621084-I1Open ↗
08/13/2026B00582607-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/12/2017321618237Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/16/2017321618237Open ↗
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
08/16/2017321618237Open ↗
03/02/2011320093983Open ↗
02/16/2011320113113Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
02/22/2011320093983Open ↗
04/01/2010320093983Open ↗
11/17/2009320093983Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
12/30/2009320113113Open ↗
11/19/2009320094722Open ↗
11/17/2009320093983Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
08/16/2017321618237Open ↗
07/12/2017321618237Open ↗
02/16/2011320113113Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
07/14/2017321618237Open ↗
12/30/2009320113113Open ↗
11/19/2009320094722Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
02/10/2011320113113Open ↗
12/15/2010320094722Open ↗
04/24/2010320093983Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification5
08/28/2026B00582607-P3Open ↗
08/17/2026B01294005-P1Open ↗
08/15/2026B00582607-P2Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
08/16/2017321618237Open ↗
01/06/2011320094722Open ↗
▸BISPLOT DIAGRAM1
11/17/2009320093983Open ↗