← Back
Primarily 1 family with 1 store or office
5808 FT HAMILTON PARKWAY
BROOKLYN · Sunset Park (East)-Borough Park (West) · BIN 3140589
💬 Discuss this project
1925Year Built
2Stories
S1Building Class
R5Zoning
1,672 sfGross Floor Area
2Units
Rent Stabilized32 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: HAMILTON 5808 REALTY LLC · 1,352 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HAMILTON 5808 REALTY1407/08/2026
TO THE OWNER OF 5808 FT H103/22/2026
OWNER OF 5808 FT HAMILTON203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/16/2016$700K—Private party → HAMILTON 5808 REALTY LLC$419/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI211/10/2025
YOU GAO409/26/2025
NYX ENGINEERING, PLLC210/03/2020
ENTHINK ENGINEERS LLC107/22/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LC EXPEDITING SERVICES803/21/2026
ECDESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KJK ELECTRIC INCElectrical103/22/2026
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
NY BUILDING ASSOCIATES INGeneral Contractor107/08/2026
SHAFQAT A CHOUDHARYGeneral Contractor107/08/2026
TLS CONSTRUCTION GROUP I*General Contractor104/09/2026
LG ELITE PLUMBING INCPlumbing107/08/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YOU GAO9407409/26/2025
NYX ENGINEERING, PLLC6118210/03/2020
Building Lifecycle
All (107)Filed (9)Permit Issued (7)Signed Off (6)Violation (60)Inspection (7)Special Inspection (18)
05/04/2026
Signed off — Alteration
INSTALL A NEW AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01313933-I1
05/04/2026
Signed off — Alteration
B01313932-I1
03/03/2026
Signed off — Alteration
PLUMBING WORK FOR EXISTING RETAIL STORE AT 1ST FLOOR AND CELLAR. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B01281213-I1
03/02/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/10/2026
Signed off — Alteration
PLUMBING WORK FOR EXISTING RETAIL STORE AT 1ST FLOOR AND CELLAR. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B01281213-S1
01/21/2026
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
01/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/13/2026
Permit issued — Sign
B01313932-I1-SG
01/13/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/05/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/24/2025
Violation issued (HPD, open)
I
11/13/2025
Permit issued — General Construction
B01313933-I1-GC
11/10/2025
Filed — Alteration
INSTALL A NEW AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B01313933-I1
11/10/2025
Filed — Alteration
B01313932-I1
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/29/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
09/29/2025
Special inspection requirement — Interior lighting power
You Gao
09/29/2025
Special inspection requirement — Lighting controls
You Gao
09/29/2025
Special inspection requirement — Maintenance information
You Gao
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
09/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
You Gao
09/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
09/26/2025
Filed — Alteration
PLUMBING WORK FOR EXISTING RETAIL STORE AT 1ST FLOOR AND CELLAR. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B01281213-P1
09/26/2025
Filed — Alteration
PLUMBING WORK FOR EXISTING RETAIL STORE AT 1ST FLOOR AND CELLAR. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B01281213-P2
09/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
You Gao
09/26/2025
Special inspection requirement — Lighting controls
You Gao
09/26/2025
Special inspection requirement — Interior lighting power
You Gao
09/26/2025
Special inspection requirement — Maintenance information
You Gao
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
You Gao
09/26/2025
Special inspection requirement — Energy Code Compliance Inspections
You Gao
09/16/2025
Permit issued — Plumbing
B01281213-S1-PL
09/09/2025
Permit issued — General Construction
B01281213-I1-GC
09/04/2025
Filed — Alteration
PLUMBING WORK FOR EXISTING RETAIL STORE AT 1ST FLOOR AND CELLAR. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B01281213-I1
09/04/2025
Filed — Alteration
PLUMBING WORK FOR EXISTING RETAIL STORE AT 1ST FLOOR AND CELLAR. NO CHANGE OF USE, EGRESS AND OCCUPANCY.
B01281213-S1
12/04/2024
Violation issued (HPD, open)
I
11/28/2023
Violation issued (HPD, open)
I
11/17/2022
Violation issued (HPD, open)
I
12/08/2021
Violation issued (HPD, closed)
C
08/05/2021
Violation issued (HPD, closed)
I
08/03/2021
Violation issued (HPD, open)
B
08/03/2021
Violation issued (HPD, open)
B
08/03/2021
Violation issued (HPD, closed)
C
08/03/2021
Violation issued (HPD, closed)
A
08/03/2021
Violation issued (HPD, closed)
A
08/03/2021
Violation issued (HPD, closed)
A
08/03/2021
Violation issued (HPD, closed)
C
08/03/2021
Violation issued (HPD, closed)
A
08/03/2021
Violation issued (HPD, closed)
A
08/03/2021
Violation issued (HPD, closed)
A
08/03/2021
Violation issued (HPD, closed)
A
08/03/2021
Violation issued (HPD, open)
B
08/03/2021
Violation issued (HPD, open)
B
08/03/2021
Violation issued (HPD, open)
B
08/03/2021
Violation issued (HPD, open)
B
08/03/2021
Violation issued (HPD, closed)
C
03/05/2021
Signed off — Alteration
B00404414-I1
03/03/2021
Permit issued — Mechanical Systems
B00404414-I1-MS
10/03/2020
Filed — Alteration
B00404414-I1
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC01/13/2026
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC11/13/2025
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC09/16/2025
DOB NOWGeneral ConstructionSigned-offTLS CONSTRUCTION GROUP I*09/09/2025
DOB NOWMechanical SystemsSigned-offNY BUILDING ASSOCIATES IN03/03/2021
DOB NOWSidewalk ShedPermit IssuedSHAFQAT A CHOUDHARY07/29/2020
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC06/12/2020
BISOTISSUEDNY BUILDING ASSOCIATES IN02/06/2020
4 projects · most recent 03/12/2026
General Wiring
FiledStatusContractorScope
03/12/2026CompleteKJK ELECTRIC INCGeneral Wiring
11/14/2025CompleteKJK ELECTRIC INC—
02/18/2020CompleteKJK ELECTRIC INC3 meters, 3 new_meters
02/13/2020CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/02/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/21/2026Pass-Final Sign Permit InspectionPassView ↗
01/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/13/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
09/29/2025Energy Code Compliance InspectionsYou Gaoprogress
09/29/2025Interior lighting powerYou Gaoenergy_progress
09/29/2025Lighting controlsYou Gaoenergy_progress
09/29/2025Maintenance informationYou Gaoenergy_progress
09/29/2025Fire-Resistant Penetrations and JointsYou Gaospecial
09/29/2025Tenant Protection Plan ComplianceYou Gaospecial
09/29/2025Fire-Resistant Penetrations and JointsYou Gaospecial
09/26/2025Tenant Protection Plan ComplianceYou Gaospecial
09/26/2025Lighting controlsYou Gaoenergy_progress
09/26/2025Interior lighting powerYou Gaoenergy_progress
09/26/2025Maintenance informationYou Gaoenergy_progress
09/26/2025Fire-Resistant Penetrations and JointsYou Gaospecial
09/26/2025Fire-Resistant Penetrations and JointsYou Gaospecial
09/26/2025Energy Code Compliance InspectionsYou Gaoprogress
09/25/2020Fire-Resistance Rated ConstructionXiao Huangprogress
09/25/2020FinalXiao Huangprogress
09/25/2020Fire-Resistant Penetrations and JointsXiao Huangspecial
09/25/2020Mechanical SystemsXiao Huangspecial
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch6
08/20/2026B01281213-S1Request digital key ↗
08/20/2026B01281213-P1Request digital key ↗
08/20/2026B01281213-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00404414-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00200622-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00372717-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
12/30/2020321982976Open ↗
12/28/2020321982976Open ↗
06/15/2020321984064Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION1
02/14/2020321982976Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/09/2019321982976Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature10
08/29/2026B01281213-I1Open ↗
08/29/2026B01281213-I1Open ↗
08/29/2026B01281213-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026B00404414-I1Open ↗
08/20/2026B01281213-S1Open ↗
08/20/2026B01281213-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026B01281213-S1Open ↗
09/01/2026B01281213-S1Open ↗
09/01/2026B01281213-P2Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
02/14/2020321982976Open ↗
01/21/2020321982976Open ↗
08/09/2019321982976Open ↗
▸Safety & Tenant Protection2
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/16/2019321982976Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00372717-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/02/2026B00404414-I1Open ↗
08/20/2026B01281213-S1Open ↗
08/20/2026B01281213-P1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
02/14/2020321982976Open ↗
08/09/2019321982976Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/12/2021321982976Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/12/2021321982976Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/19/2021321982976Open ↗
01/19/2021321982976Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/19/2021321982976Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
01/12/2021321982976Open ↗
01/29/2020321982976Open ↗
08/09/2019321982976Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
01/06/2021321982976Open ↗
12/23/2020321982976Open ↗
▸BISEFILING COVER SHEET2
10/31/2019321984064Open ↗
08/09/2019321982976Open ↗