← Back
Licensed parking lot
581 GRANT AVENUE
BROOKLYN · BIN 3814094
💬 Discuss this project
0Year Built
—Stories
G6Building Class
R6Zoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Licensed parking lot · Owner of record: NYC DEPARTMENT OF TRANSPORTATION · 49,397 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction146p · 3 filings · 20 docs
Floor 8Under Construction152p · 2 filings · 20 docs
Floor 7Under Construction152p · 2 filings · 20 docs
Floor 6Under Construction209p · 2 filings · 20 docs
Floor 5Under Construction209p · 2 filings · 20 docs
Floor 4Under Construction205p · 2 filings · 20 docs
Floor 3Under Construction204p · 2 filings · 20 docs
Floor 2Under Construction208p · 2 filings · 20 docs
Floor 1Under Construction219p · 3 filings · 20 docs
CellarUnder Construction216p · 2 filings · 20 docs
2 jobs · most recent 08/10/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/10/2026Permit IssuedFSNY ENVELOPE LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ephoca APK10N3H1 15,000 BTU ×468
ADP10N3H2 6,850 BTU · Heat Pump Outdoor ×13
Bulldog SRH018 24,700 BTU · Wshp ×10
SRH024 32,200 BTU · Wshp ×6
SRH012 16,200 BTU · Wshp ×3
SRH030 40,300 BTU · Wshp ×2
Daikin DPSH03B 32,400 BTU · Rooftop Unit ×3
Aermec NYG0500 38 tons · Heat Pump Outdoor ×1
Ventilation
Greenheck USF-13 1,450 CFM · Kitchen Exhaust ×6
AX-113-533-0817-A400 42,300 CFM ×4
USF-12 1,050 CFM · Exhaust Fan ×3
USF-13-VG 1,480 CFM · Exhaust Fan ×2
USF-8-VG; SQ-98-VG 305 CFM · Makeup Air ×2
IP-5 105 CFM · Exhaust Fan ×1
USF-08 580 CFM · Kitchen Exhaust ×1
USF-8-VG 670 CFM · Exhaust Fan ×1
Renewaire HE07 455 CFM · Erv ×2
HE1.5 1,020 CFM · Erv ×1
HE10 700 CFM · Erv ×1
HE2X 1,030 CFM · Erv ×1
Enervex MBES450X 3,225 CFM · Exhaust Fan ×1
06/18/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin FXSQ48TAVJU 48,000 BTU · Vrf Indoor ×8
FXSQ24TAVJU 24,000 BTU · Vrf Indoor ×2
Ventilation
Daikin VAM1200GVJU 980 CFM · Erv ×1
VAM300GVJU 200 CFM · Erv ×1
VAM600GVJU 500 CFM · Erv ×1
Greenheck CSP-A700-VG 385 CFM · Exhaust Fan ×1
2 jobs · most recent 08/10/2026
Sprinkler System
FiledStatusContractorScope
08/10/2026——Sprinkler System
06/18/2026——Sprinkler System
2 jobs · most recent 08/10/2026
Water/Sanitary Storm
FiledStatusContractorScope
08/10/2026Permit IssuedZAPAS CONSTRUCTION CORPStorm, Water/Sanitary
06/18/2026——Water/Sanitary
9 jobs · most recent 08/19/2026
General Wiring
FiledStatusContractorScope
08/19/2026Permit IssuedJAM ELECTRICAL CORPGeneral Wiring
03/17/2026Permit IssuedSOLAS ELECTRICAL CORP—
03/16/2026Permit IssuedSOLAS ELECTRICAL CORP—
02/24/2026Permit IssuedISTRA ELEC'L CONTRS CORPGeneral Wiring
02/24/2026Permit IssuedISTRA ELEC'L CONTRS CORPGeneral Wiring
02/24/2026Permit IssuedISTRA ELEC'L CONTRS CORPGeneral Wiring
12/15/2025CancelledSHELBY ELECTRICAL CORPGeneral Wiring
12/15/2025CancelledSHELBY ELECTRICAL CORPGeneral Wiring
12/15/2025CancelledSHELBY ELECTRICAL CORPGeneral Wiring
1 job · most recent 08/10/2026
Steel Concrete
FiledStatusContractorScope
08/10/2026Permit IssuedFSNY ENVELOPE LLCSteel, Concrete
2 jobs · most recent 06/22/2026
Fence Sidewalk Shed
FiledStatusContractorScope
06/22/2026Permit IssuedSD BUILDERS AND CONSTRUCTFence
12/18/2025Permit IssuedCORE SCAFFOLD SYSTEMS INCSidewalk Shed
Building Lifecycle
All (108)Filed (31)Permit Issued (20)Violation (3)Inspection (2)Objection (22)Special Inspection (30)
09/24/2026
Permit issued — Protection and Mechanical Methods
B01196476-Z2-PMM
08/13/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
EUGENE BIFULCO
08/13/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
EUGENE BIFULCO
08/10/2026
Filed — New Building
Propose Temporary Standpipe system for the construction of NB # B01196476-I1.
B01196476-Z1
08/10/2026
Filed — New Building
Propose Temporary Standpipe system for the construction of NB # B01196476-I1.
B01196476-P7
08/10/2026
Permit issued — Protection and Mechanical Methods
B01196476-Z1-PMM
08/03/2026
Permit issued — Construction Fence
B01309009-I1-FN
07/14/2026
Permit issued — Protection and Mechanical Methods
B01196476-S9-PMM
07/13/2026
Filed — New Building
Propose Temporary Standpipe system for the construction of NB # B01196476-I1.
B01196476-S9
07/02/2026
Objection resolved — Resolved
07/02/2026
Objection resolved — Resolved
06/30/2026
Objection resolved — Addressed
06/25/2026
Objection raised — Cost
06/23/2026
Objection raised — Other
06/23/2026
Objection raised — Other
06/22/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01309009-P2
06/19/2026
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
06/19/2026
Special inspection requirement — Subgrade Inspections
JONATHAN CIAMPI
06/19/2026
Special inspection requirement — Deep Foundation Elements
JONATHAN CIAMPI
06/19/2026
Special inspection requirement — Footing and Foundation
EUGENE BIFULCO
06/19/2026
Special inspection requirement — Final
EUGENE BIFULCO
06/19/2026
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
06/18/2026
Filed — Alteration
PROPOSED INTERIOR TENANT FITOUT OF FIRST GENERATION TENANT SPACE AT THE FIRST FLOOR, WITH NEW PARTITIONS, MILLWORK, FINISH AND OTHER INTERIOR FINISHES. NO CHANGE IN USE, EGRESS AND OCCUPANCY
B01411899-S2
06/18/2026
Filed — Alteration
PROPOSED INTERIOR TENANT FITOUT OF FIRST GENERATION TENANT SPACE AT THE FIRST FLOOR, WITH NEW PARTITIONS, MILLWORK, FINISH AND OTHER INTERIOR FINISHES. NO CHANGE IN USE, EGRESS AND OCCUPANCY
B01411899-S3
06/18/2026
Filed — Alteration
PROPOSED INTERIOR TENANT FITOUT OF FIRST GENERATION TENANT SPACE AT THE FIRST FLOOR, WITH NEW PARTITIONS, MILLWORK, FINISH AND OTHER INTERIOR FINISHES. NO CHANGE IN USE, EGRESS AND OCCUPANCY
B01411899-S1
06/17/2026
Filed — Alteration
PROPOSED INTERIOR TENANT FITOUT OF FIRST GENERATION TENANT SPACE AT THE FIRST FLOOR, WITH NEW PARTITIONS, MILLWORK, FINISH AND OTHER INTERIOR FINISHES. NO CHANGE IN USE, EGRESS AND OCCUPANCY
B01411899-I1
06/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
06/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/16/2026
Special inspection requirement — Maintenance information
06/16/2026
Special inspection requirement — Maintenance information
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
06/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/16/2026
Special inspection requirement — Post-installed Anchors
06/16/2026
Special inspection requirement — Shutoff dampers
06/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/12/2026
Special inspection requirement — Mechanical Systems
06/12/2026
Special inspection requirement — Sprinkler Systems
06/12/2026
Special inspection requirement — Final
06/09/2026
Filed — New Building
Propose Temporary Standpipe system for the construction of NB # B01196476-I1.
B01196476-P6
06/07/2026
Violation issued (ECB, closed)
Construction
05/28/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01334015-P1
05/22/2026
Violation issued (ECB, closed)
Construction
05/15/2026
Filed — New Building
Propose Temporary Standpipe system for the construction of NB # B01196476-I1.
B01196476-Z2
05/15/2026
Permit issued — Protection and Mechanical Methods
B01196476-Z2-PMM
04/29/2026
Special inspection requirement — Deep Foundation Elements
JONATHAN CIAMPI
04/29/2026
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
04/29/2026
Special inspection requirement — Concrete - Cast-In-Place
EUGENE BIFULCO
04/27/2026
Permit issued — Protection and Mechanical Methods
B01349160-I1-PMM
04/22/2026
Permit issued — General Construction
B01388296-I1-GC
04/21/2026
Permit issued — General Construction
B01196476-I1-GC
04/17/2026
Filed — Alteration
B01349160-I1
04/16/2026
Filed — Alteration
Temporary tent for a ground breaking ceremony. Removed at the end of the programing. No changes to existing structures, use or egress.
B01388296-I1
04/13/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Latest 60 of 108 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD BUILDERS CONSTRUCTION1609/13/2026
GRAND APTS HOUSING DEVELOPMENT FUND2207/08/2026
OWNERS REP907/08/2026
SD BUILDERS AND CONDTRUCT103/22/2026
SD BUILDERS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2603/21/2026
AE DESIGN SOLUTION1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SD BUILDERS AND CONSTRUCTGeneral Contractor1208/26/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor407/08/2026
BRYAN'S QUALITY PLUS LLCGeneral Contractor208/26/2026
FSNY ENVELOPEGeneral Contractor209/25/2026
SHELBY ELECTRICAL CORPElectrical103/22/2026
ACE RENTAL CORPGeneral Contractor107/08/2026
ZAPAS CONSTRUCTION CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER5441208/10/2026
GEODESIGN, INC., P.C.627606/09/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedFSNY ENVELOPE LLC09/24/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedBRYAN'S QUALITY PLUS LLC08/10/2026
DOB NOWConstruction FencePermit IssuedSD BUILDERS AND CONSTRUCT08/03/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedBRYAN'S QUALITY PLUS LLC07/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedFSNY ENVELOPE LLC05/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.04/27/2026
DOB NOWGeneral ConstructionSigned-offACE RENTAL CORP04/22/2026
DOB NOWGeneral ConstructionPermit IssuedSD BUILDERS AND CONSTRUCT04/21/2026
DOB NOWFoundationPermit IssuedSD BUILDERS AND CONSTRUCT03/31/2026
DOB NOWStructuralPermit IssuedSD BUILDERS AND CONSTRUCT03/30/2026
DOB NOWGeneral ConstructionPermit IssuedSD BUILDERS AND CONSTRUCT01/15/2026
DOB NOWPlumbingPermit IssuedZAPAS CONSTRUCTION CORP01/05/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC12/30/2025
DOB NOWMechanical SystemsPermit IssuedSD BUILDERS AND CONSTRUCT12/29/2025
DOB NOWStructuralPermit IssuedSD BUILDERS AND CONSTRUCT12/26/2025
DOB NOWFoundationPermit IssuedSD BUILDERS AND CONSTRUCT12/26/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC12/22/2025
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC12/19/2025
DOB NOWSupport of ExcavationPermit IssuedSD BUILDERS AND CONSTRUCT12/05/2025
DOB NOWConstruction FencePermit IssuedSD BUILDERS AND CONSTRUCT11/05/2025
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/13/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
08/13/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesEUGENE BIFULCOspecial
08/13/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationEUGENE BIFULCOspecial
06/19/2026Concrete - Cast-In-PlaceEUGENE BIFULCOspecial
06/19/2026Post-installed AnchorsEUGENE BIFULCOspecial
06/19/2026Footing and FoundationEUGENE BIFULCOprogress
06/19/2026FinalEUGENE BIFULCOprogress
06/19/2026Subgrade InspectionsJONATHAN CIAMPIspecial
06/19/2026Deep Foundation ElementsJONATHAN CIAMPIspecial
06/16/2026HVAC-R and service water heating system controls—energy_progress
06/16/2026HVAC-R and service water piping design and insulation—energy_progress
06/16/2026HVAC-R and service water heating equipment—energy_progress
06/16/2026HVAC-R and service water piping design and insulation—energy_progress
06/16/2026Energy Code Compliance Inspections—progress
06/16/2026HVAC-R and service water heating system controls—energy_progress
06/16/2026Fire-Resistant Penetrations and Joints—special
06/16/2026HVAC-R and service water heating equipment—energy_progress
06/16/2026Shutoff dampers—energy_progress
06/16/2026Maintenance information—energy_progress
06/16/2026Post-installed Anchors—special
06/16/2026Fire-Resistant Penetrations and Joints—special
06/16/2026Fire-Resistant Penetrations and Joints—special
06/16/2026Energy Code Compliance Inspections—progress
06/16/2026Maintenance information—energy_progress
06/16/2026Duct leakage testing, insulation and design—energy_progress
06/12/2026Sprinkler Systems—special
Latest 25 of 90.
▾Documents — 134 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch32
08/19/2026B01336817-I1Request digital key ↗
08/19/2026B01333980-I1Request digital key ↗
08/19/2026B01334015-P1Request digital key ↗
Showing 3 of 32 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
08/13/2025340919778Open ↗
07/03/2025322120076Open ↗
▸DOB NOWDEP Stormwater Construction Permit1
08/13/2026B01196476-I1Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/25/2025322120076Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01196476-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01196476-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01196476-I1Open ↗
▸Seals & Professional Certifications66
▸DOB NOWDPL-1: Design Professional Seal & Signature32
08/19/2026B01336817-I1Open ↗
08/19/2026B01334015-P1Open ↗
08/19/2026B01334015-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/18/2026B01196476-S5Open ↗
09/18/2026B01196476-S5Open ↗
09/02/2026B01196476-S6Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/18/2026B01196476-S5Open ↗
08/29/2026B01388296-I1Open ↗
08/28/2026B01196476-S1Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/13/2025340919778Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/13/2025340919778Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026B01196476-I1—
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01196476-I1Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/13/2025340919778Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/13/2025340919778Open ↗
▸BISSTREET TREE CHECKLIST1
08/13/2025340919778Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01196476-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01196476-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/19/2026B01334015-P1Open ↗
08/18/2026B01309009-P2Open ↗
08/13/2026B01349160-I1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/25/2025322120076Open ↗
07/25/2025322120076Open ↗
07/08/2025322120076Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
07/03/2025322120076Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/13/2025340919778Open ↗
▸BISADDITIONAL INFORMATION1
07/25/2025322120076Open ↗
▸Other Documents7
▸BISPLOT DIAGRAM3
07/25/2025322120076Open ↗
07/25/2025322120076Open ↗
07/08/2025322120076Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01196476-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01196476-S6Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026B01196476-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01196476-I1Open ↗