581 WEST CASWELL AVENUE
STATEN ISLAND · BIN 5175070
💬 Discuss this project
2021Year Built
2Stories
B2Building Class
R3XZoning
2,292 sfGross Floor Area
2Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Two family frame · 3,340 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 219p · 2 filings · 20 docs
Floor 125p · 2 filings · 20 docs
Basement20p · 2 filings · 20 docs
Site & exterior3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SI Northshoer Enterprises1107/08/2026
Kion Development203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rogers Calvanico Group403/23/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Zaim ContractorGeneral Contractor603/21/2026
A. J. Caruso Electrical IElectrical103/22/2026
JB Buzco PlumbingPlumbing107/08/2026
Quality PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677203/23/2022
Building Lifecycle
11/26/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
11/15/2022
Signed off — New Building
10' TOTAL CURB CUT. CURB CUT APPLICABLE TO LOT: 16 & 15; HSE: 581 & 579 WEST CASWELL AVENUE
S00534081-S1
11/15/2022
Signed off — New Building
10' TOTAL CURB CUT. CURB CUT APPLICABLE TO LOT: 16 & 15; HSE: 581 & 579 WEST CASWELL AVENUE
S00534081-S3
06/01/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/05/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
54 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSuffolk Construction04/07/2022
DOB NOWGeneral ConstructionPermit IssuedSuffolk Construction11/30/2021
DOB NOWPlumbingSigned-offJB Buzco Plumbing10/06/2021
DOB NOWPlumbingSigned-offQuality Plumbing10/04/2021
DOB NOWFoundationPermit IssuedSuffolk Construction09/09/2021
1 project · most recent 03/23/2022
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/23/2022Signed-offQuality PlumbingGas, Storm, Water/Sanitary
1 project · most recent 05/06/2022
General Wiring
FiledStatusContractorScope
05/06/2022CompleteA. J. Caruso Electrical IGeneral Wiring
1 project · most recent 03/23/2022
Wood
FiledStatusContractorScope
03/23/2022Signed-offZaim ContractorWood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/01/2022Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2022Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
05/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/20/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/14/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/13/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/07/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
04/04/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
04/04/2022Mechanical SystemsWILLIAM MONTAGUEspecial
04/04/2022Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
04/04/2022Structural Steel - WeldingWILLIAM MONTAGUEspecial
04/04/2022Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
04/04/2022Subgrade InspectionsWILLIAM MONTAGUEspecial
04/04/2022Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
04/04/2022Structural Steel - DetailsWILLIAM MONTAGUEspecial
04/04/2022FinalWILLIAM MONTAGUEprogress
04/04/2022Structural Wood FrameWILLIAM MONTAGUEprogress
04/04/2022Footing and FoundationWILLIAM MONTAGUEprogress
04/04/2022Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
04/04/2022Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
04/04/2022Interior lighting powerWILLIAM MONTAGUEenergy_progress
04/04/2022Ventilation and air distribution systemWILLIAM MONTAGUEenergy_progress
04/04/2022HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
04/04/2022Air barrier — testing WILLIAM MONTAGUEenergy_progress
04/04/2022Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
04/04/2022Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
04/04/2022Protection of exposed foundation insulationWILLIAM MONTAGUEenergy_progress
04/04/2022MeteringWILLIAM MONTAGUEenergy_progress
04/04/2022Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
04/04/2022Fenestration areasWILLIAM MONTAGUEenergy_progress
04/04/2022Maintenance informationWILLIAM MONTAGUEenergy_progress
04/04/2022Permanent certificateWILLIAM MONTAGUEenergy_progress
Latest 25 of 60.
57 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account