← Back
One family attached or semi-detached
582 68 STREET
BROOKLYN · BIN 3145351
💬 Discuss this project
1930Year Built
2.5Stories
A5Building Class
R4-1Zoning
1,989 sfGross Floor Area
1Units
4 Open Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
One family attached or semi-detached · 1,560 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction17p · 2 filings · 9 docs
Floor 1Under Construction17p · 2 filings · 9 docs
CellarUnder Construction17p · 2 filings · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/14/2025$1.1M—— → —$553/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MILTIADIS LEPTOURGOS, PE209/19/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PERLSTONE NYC INCGeneral Contractor104/09/2026
ARIEL SERVICES INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILTIADIS LEPTOURGOS, PE508209/19/2025
Building Lifecycle
All (40)Filed (2)Permit Issued (2)Violation (4)Inspection (6)Objection (18)Special Inspection (8)
06/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/17/2026
Permit issued — Plumbing
B01280783-I1-PL
04/16/2026
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
04/10/2026
Inspection — Fail-Final PL - More than 10 Requested Floors
Fail
View inspection ↗
04/06/2026
Permit issued — General Construction
B01282691-I1-GC-CX
01/28/2026
Objection resolved — Addressed
01/28/2026
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/18/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
12/04/2025
Objection resolved — Addressed
10/02/2025
Objection raised — Scope
10/02/2025
Objection raised — Admin
10/02/2025
Objection raised — Mechanical
10/02/2025
Objection raised — Cost
10/02/2025
Objection raised — Scope
10/02/2025
Objection raised — Scope
10/02/2025
Objection raised — Scope
10/02/2025
Objection raised — Mechanical
10/02/2025
Objection raised — Scope
09/19/2025
Filed — Alteration
1. THIS APPLICATION IS FILED TO CURE THE 2 ECB VIOLATIONS ISSUED 08/15/2025, NAMELY: DOING WORK WITHOUT A PERMIT, FRAMING/REPLACING PARTITIONS, AND GENERAL RENOVATION ON CEL, 1ST, 2ND AND ATTIC FLOORS. 2. THIS APPLICATION IS FOR GC, ST, FO WORK. ALL AS
B01282691-I1
09/19/2025
Filed — Alteration
B01280783-I1
09/05/2025
Special inspection requirement — Concrete - Cast-In-Place
Miltiadis Leptourgos
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Miltiadis Leptourgos
09/05/2025
Special inspection requirement — Masonry
Miltiadis Leptourgos
09/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Miltiadis Leptourgos
09/05/2025
Special inspection requirement — Subgrade Inspections
Miltiadis Leptourgos
09/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
Miltiadis Leptourgos
09/05/2025
Special inspection requirement — Final
Miltiadis Leptourgos
09/05/2025
Special inspection requirement — Footing and Foundation
Miltiadis Leptourgos
08/15/2025
Violation issued (ECB, open)
Construction
08/15/2025
Violation issued (ECB, open)
Unknown
08/15/2025
Violation issued (ECB, open)
Construction
08/15/2025
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedARIEL SERVICES INC04/17/2026
DOB NOWGeneral ConstructionPermit IssuedPERLSTONE NYC INC04/06/2026
1 project · most recent 03/31/2026
General Wiring
FiledStatusContractorScope
03/31/2026Permit IssuedCONTACT ELECTRIC CORPGeneral Wiring
1 project · most recent 09/19/2025
Concrete Masonry
FiledStatusContractorScope
09/19/2025Permit IssuedPERLSTONE NYC INCConcrete, Masonry
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/16/2026Pass-Final PL - More than 10 Requested FloorsPassView ↗
04/10/2026Fail-Final PL - More than 10 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/05/2025Concrete - Cast-In-PlaceMiltiadis Leptourgosspecial
09/05/2025Fire-Resistant Penetrations and JointsMiltiadis Leptourgosspecial
09/05/2025MasonryMiltiadis Leptourgosspecial
09/05/2025Structural Stability – Alterations of existing buildingsMiltiadis Leptourgosspecial
09/05/2025Subgrade InspectionsMiltiadis Leptourgosspecial
09/05/2025Fire-Resistance Rated ConstructionMiltiadis Leptourgosprogress
09/05/2025FinalMiltiadis Leptourgosprogress
09/05/2025Footing and FoundationMiltiadis Leptourgosprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026B01280783-I1Request digital key ↗
08/20/2026B01282691-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026B01280783-I1Open ↗
08/20/2026B01282691-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026B01282691-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B01282691-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026B01280783-I1Open ↗
08/20/2026B01282691-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B01282691-I1Open ↗