← Back
Condo, residential unit in walk-up building
582 THROOP AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3052834
💬 Discuss this project
1910Year Built
—Stories
R2Building Class
R6BZoning
11,582 sfGross Floor Area
14Units
Rent Stabilized34 Open Violations 33 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential unit in walk-up building · 3,650 sf lot · 3.17 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 12p · 1 filing · 18 docs
Cellar7p · 1 filing · 18 docs
Site & exterior5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CFH ASSOCIATES103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AGE ENGINEERING PLLC311/04/2025
SYED ENGINEERING, P.C.111/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ABC PERMIT EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VIGILANTE CONTRACTING COPlumbing207/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
VIGILANTE CONTRACTING COGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746111/04/2025
Building Lifecycle
All (85)Filed (4)Permit Issued (4)Signed Off (4)Violation (60)Inspection (2)Special Inspection (11)
05/06/2026
Violation issued (HPD, open)
A
04/17/2026
Signed off — Alteration
INSTALL NEW DIRECT VENTS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01302271-S2
04/17/2026
Signed off — Alteration
INSTALL NEW DIRECT VENTS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01302271-I1
04/17/2026
Signed off — Alteration
INSTALL NEW DIRECT VENTS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01302271-S1
03/30/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/21/2025
Permit issued — Boiler Equipment
B01302271-I1-BE
11/14/2025
Permit issued — Plumbing
B01302271-S2-PL
11/14/2025
Permit issued — Mechanical Systems
B01302271-S1-MS
11/04/2025
Filed — Alteration
INSTALL NEW DIRECT VENTS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01302271-S2
11/04/2025
Filed — Alteration
INSTALL NEW DIRECT VENTS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01302271-I1
11/04/2025
Filed — Alteration
INSTALL NEW DIRECT VENTS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01302271-S1
11/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
11/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
11/04/2025
Special inspection requirement — Maintenance information
Stephen Shishko
11/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
11/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
11/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stephen Shishko
11/04/2025
Special inspection requirement — Chimneys and vents
Stephen Shishko
10/14/2025
Special inspection requirement — Final
Stephen Shishko
10/14/2025
Special inspection requirement — Mechanical Systems
Stephen Shishko
06/11/2025
Violation issued (HPD, open)
A
04/12/2024
Violation issued (HPD, closed)
A
03/27/2023
Violation issued (HPD, closed)
A
05/17/2022
Signed off — Alteration
B00622411-I1
03/23/2022
Permit issued — General Construction
B00622411-I1-GC
03/08/2022
Violation issued (ECB, closed)
Construction
03/02/2022
Violation issued (HPD, closed)
A
03/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/02/2022
Violation issued (HPD, closed)
I
01/05/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/06/2021
Violation issued (ECB, closed)
Construction
11/10/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/04/2021
Filed — Alteration
B00622411-I1
11/01/2021
Special inspection requirement — Energy Code Compliance Inspections
RAFI HAMID
11/01/2021
Special inspection requirement — Final
RAFI HAMID
10/04/2021
Violation issued (ECB, closed)
Construction
09/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/20/2021
Violation issued (ECB, closed)
Construction
06/09/2021
Violation issued (ECB, closed)
Construction
04/14/2021
Violation issued (ECB, closed)
Construction
04/13/2021
Violation issued (HPD, closed)
I
04/13/2021
Violation issued (HPD, closed)
A
01/06/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/07/2020
Violation issued (ECB, closed)
Construction
10/31/2019
Violation issued (HPD, closed)
I
08/28/2019
Violation issued (HPD, open)
B
10/22/2018
Violation issued (HPD, closed)
I
11/29/2017
Violation issued (HPD, closed)
I
11/15/2016
Violation issued (HPD, closed)
I
10/14/2015
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, open)
C
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/22/2015
Violation issued (ECB, closed)
Construction
08/04/2015
Violation issued (HPD, closed)
C
08/04/2015
Violation issued (HPD, open)
B
08/04/2015
Violation issued (HPD, open)
B
08/04/2015
Violation issued (HPD, open)
A
08/04/2015
Violation issued (HPD, open)
A
08/04/2015
Violation issued (HPD, open)
B
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offVIGILANTE CONTRACTING CO11/21/2025
DOB NOWPlumbingSigned-offVIGILANTE CONTRACTING CO11/14/2025
DOB NOWMechanical SystemsSigned-offVIGILANTE CONTRACTING CO11/14/2025
DOB NOWGeneral ConstructionSigned-offMETRO NY CONSTRUCTION INC03/23/2022
BISPLISSUEDRENEW PLUMBING CORP06/30/1994
BIS—ISSUEDANNATESS CONSTRUCTION CORP05/25/1994
3 projects · most recent 01/29/2025
General Wiring
FiledStatusContractorScope
01/29/2025CompleteA & S ELECTRIC INC.—
08/26/2024Permit IssuedA & S ELECTRIC INC.General Wiring
10/01/2020Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/30/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/04/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
11/04/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
11/04/2025Maintenance informationStephen Shishkoenergy_progress
11/04/2025HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
11/04/2025HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
11/04/2025HVAC-R and service water piping design and insulationStephen Shishkoenergy_progress
11/04/2025Chimneys and ventsStephen Shishkospecial
10/14/2025FinalStephen Shishkoprogress
10/14/2025Mechanical SystemsStephen Shishkospecial
11/01/2021Energy Code Compliance InspectionsRAFI HAMIDprogress
11/01/2021FinalRAFI HAMIDprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00622411-I1Request digital key ↗
08/20/2026B01302271-S2Request digital key ↗
08/20/2026B01302271-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B01302271-S1Open ↗
09/23/2026B01302271-I1Open ↗
09/23/2026B01302271-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026B01302271-S2Open ↗
08/20/2026B01302271-S1Open ↗
08/20/2026B01302271-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B01302271-S1Open ↗
09/23/2026B01302271-S1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026B01302271-I1Open ↗
08/20/2026B01302271-S2Open ↗
08/20/2026B01302271-S1Open ↗