← Back
BuildNYC
Gas station with service / auto repair
5824 CHURCH AVENUE
BROOKLYN · BIN 3327609
💬 Discuss this project
1931Year Built
1Stories
G4Building Class
C8-1Zoning
840 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Gas station with service / auto repair · Owner of record: Asfi Petroleum · 20,000 sf lot · 0.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDollar Tree, BP Filling Station +141p · 5 filings · 20 docs
BulkheadBP Filling Station1p · 1 filing · 19 docs
Floor 1Dollar Tree, Asef Petroleum +142p · 6 filings · 20 docs
CellarBP Filling Station8p · 1 filing · 19 docs
Site & exteriorAsef Petroleum, BP Filling Station +111p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ultimate Realtors907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Catapano Engineering1812/28/2023
Raymond Ho Architect412/27/2023
Tan Engineering101/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Catapano Engineering3803/21/2026
Knova Contractors803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gemstar ConstructionGeneral Contractor1107/08/2026
Hunter ElectricElectrical503/21/2026
Active SignsSign hanger407/08/2026
Hunter ElectricElectrical303/22/2026
Nycom ElectricalElectrical303/22/2026
Restore AmericaGeneral Contractor303/22/2026
MPC Plumbing & HeatingPlumbing107/08/2026
Restore AmericaGeneral Contractor107/08/2026
John V CatapanoElectrical103/21/2026
Alvin Petroleum Systems IGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Catapano Engineering & AR32351312/28/2023
Rudolph Dupuy R.A. Architects3936412/27/2023
Tan Engineering1291101/24/2023
C.M. Testing Laboratory1352211/29/2022
Building Lifecycle
All (136)Filed (23)Permit Issued (14)Signed Off (12)Violation (6)Inspection (5)Objection (46)Special Inspection (30)
03/19/2026
Violation issued (FDNY_ORDER, closed)
03/19/2026
Violation issued (FDNY_ORDER, closed)
09/19/2024
Signed off — Alteration
installation of (3) signs logo's for BP Gasoline Service Station- located on the canopy over the Gasoline Service Islands.
B00812806-I1
09/19/2024
Signed off — Alteration
Install (2) internally illuminated accessory business - building signs.
B00815331-I1
07/10/2024
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
02/20/2024
Signed off — Alteration
Modification of existing LED sign as per plans. No change to existing occupancy use or egress.
B00363602-I1
02/16/2024
Signed off — Alteration
Modification of existing LED sign as per plans. No change to existing occupancy use or egress.
B00363111-I1
01/17/2024
Signed off — Alteration
Proposed work in tenant convenience store -install new split system - heat pump on roof & 3 indoor AHU's, (1) exhaust hood, (1) makeup air system, ductwork, fire damper, volume damper, thermostat, temperature sensor, exhaust fan - all as per plans.
B00779066-I1
01/10/2024
Special inspection requirement — Final
PING MAN HO
01/10/2024
Special inspection requirement — Structural Steel - High Strength Bolting
RUDOLPH DUPUY
01/02/2024
Signed off — Alteration
Proposed work in tenant convenience store -install new split system - heat pump on roof & 3 indoor AHU's, (1) exhaust hood, (1) makeup air system, ductwork, fire damper, volume damper, thermostat, temperature sensor, exhaust fan - all as per plans.
B00779066-S3
12/28/2023
Filed — Alteration
Proposed work in tenant convenience store -install new split system - heat pump on roof & 3 indoor AHU's, (1) exhaust hood, (1) makeup air system, ductwork, fire damper, volume damper, thermostat, temperature sensor, exhaust fan - all as per plans.
B00779066-P4
12/27/2023
Filed — Alteration
Modification of existing LED sign as per plans. No change to existing occupancy use or egress.
B00363111-P1
12/27/2023
Filed — Alteration
Modification of existing LED sign as per plans. No change to existing occupancy use or egress.
B00363602-P1
12/27/2023
Special inspection requirement — Structural Steel - High Strength Bolting
RUDOLPH DUPUY
12/27/2023
Special inspection requirement — Final
PING MAN HO
12/26/2023
Special inspection requirement — Final
PING MAN HO
12/18/2023
Special inspection requirement — Structural Steel - High Strength Bolting
RUDOLPH DUPUY
08/21/2023
Permit issued — General Construction
B00779066-S3-GC-CX
08/11/2023
Signed off — Alteration
Remove and replace existing concrete drive mat at pump area. No change to use,egress or occupancy under this application.
B00453701-I1
08/11/2023
Signed off — Alteration
Proposing to Install HVAC RTU-1 rooftop unit w/ ductwork through roof penetration for air distribution, (1)Restroom exhaust fan, fire damper at all roof penetrations, volume damper, manual balance dampers, thermostat & temperature sensor for RTU.
B00602219-I1
08/11/2023
Signed off — Alteration
PROPOSING TO REMOVE & INSTALL NEW INTERIOR PARTITIONS, BUILDING WALK W/ H.C.RAMP, REVISE PARKING AREA,NEW PAVING,DUNNAGE ON ROOF, NEW PARKING SIGNS WITH FOOTING, (2)NEW FOOTINGS/COLUMNS,REMOVE DOOR & INSTALL GLASS AT STOREFRONT & MASONRY WORK
B00601908-I1
08/04/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN CATAPANO
08/04/2023
Special inspection requirement — Shutoff dampers
JOHN CATAPANO
08/04/2023
Special inspection requirement — Mechanical Systems
JOHN CATAPANO
08/04/2023
Special inspection requirement — Maintenance information
JOHN CATAPANO
08/04/2023
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
08/04/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN CATAPANO
08/04/2023
Special inspection requirement — Final
JOHN CATAPANO
08/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
07/28/2023
Filed — Alteration
Proposed work in tenant convenience store -install new split system - heat pump on roof & 3 indoor AHU's, (1) exhaust hood, (1) makeup air system, ductwork, fire damper, volume damper, thermostat, temperature sensor, exhaust fan - all as per plans.
B00779066-P3
07/27/2023
Signed off — Alteration
Proposing in tenant space-Remove -(1) lav, (1) toilet, (1)H.W. Heater, (1) drain INSTALL-(1) Lav (1) toilet,(6) Non Res Sinks, (1)RPZ,(6) drains, (1) grease interceptor, (5) sprinkler all w/ assoc. piping. Gas- (2) Furnaces(2) Fryers and (1) H.W. Heater
B00602204-I1
07/27/2023
Signed off — Alteration
PROPOSING FOR TENANT IN CONVENIENCE STORE - INSTALL FINISHES, CASEWORK & EQUIPMENT & BOLLARDS AROUND BUILDING ENTRANCE.
B00779826-I1
07/25/2023
Special inspection requirement — Shutoff dampers
JOHN CATAPANO
07/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN CATAPANO
07/25/2023
Special inspection requirement — Maintenance information
JOHN CATAPANO
07/25/2023
Special inspection requirement — Final
JOHN CATAPANO
07/25/2023
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
07/25/2023
Special inspection requirement — Mechanical Systems
JOHN CATAPANO
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
07/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN CATAPANO
07/19/2023
Signed off — Alteration
Proposed work in tenant convenience store -install new split system - heat pump on roof & 3 indoor AHU's, (1) exhaust hood, (1) makeup air system, ductwork, fire damper, volume damper, thermostat, temperature sensor, exhaust fan - all as per plans.
B00779066-S1
07/17/2023
Permit issued — Mechanical Systems
B00779066-S1-MS
07/13/2023
Permit issued — Sign
B00815331-I1-SG
07/13/2023
Permit issued — Sign
B00812806-I1-SG
06/23/2023
Filed — Alteration
Proposed work in tenant convenience store -install new split system - heat pump on roof & 3 indoor AHU's, (1) exhaust hood, (1) makeup air system, ductwork, fire damper, volume damper, thermostat, temperature sensor, exhaust fan - all as per plans.
B00779066-S3
06/23/2023
Filed — Alteration
Install (2) internally illuminated accessory business - building signs.
B00815331-P1
05/11/2023
Permit issued — General Construction
B00453701-I1-GC
04/28/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/28/2023
Permit issued — Earth Work
B00601908-I1-GC-CX
03/28/2023
Permit issued — General Construction
B00779826-I1-GC
03/21/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2023
Objection raised — Fire_Protection
03/13/2023
Objection resolved — Addressed
02/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/06/2023
Filed — Alteration
installation of (3) signs logo's for BP Gasoline Service Station- located on the canopy over the Gasoline Service Islands.
B00812806-I1
02/06/2023
Filed — Alteration
Install (2) internally illuminated accessory business - building signs.
B00815331-I1
02/02/2023
Filed — Alteration
Proposed work in tenant convenience store -install new split system - heat pump on roof & 3 indoor AHU's, (1) exhaust hood, (1) makeup air system, ductwork, fire damper, volume damper, thermostat, temperature sensor, exhaust fan - all as per plans.
B00779066-P1
01/31/2023
Permit issued — Plumbing
B00602204-I1-PL
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRestore America08/21/2023
DOB NOWMechanical SystemsSigned-offGemstar Construction07/17/2023
DOB NOWSignSigned-offActive Signs07/13/2023
DOB NOWSignSigned-offActive Signs07/13/2023
DOB NOWGeneral ConstructionSigned-offAlvin Petroleum Systems I05/11/2023
DOB NOWEarth WorkSigned-offGemstar Construction03/28/2023
DOB NOWGeneral ConstructionSigned-offGemstar Construction03/28/2023
DOB NOWPlumbingSigned-offMPC Plumbing & Heating01/31/2023
DOB NOWGeneral ConstructionSigned-offGemstar Construction12/15/2022
DOB NOWMechanical SystemsSigned-offGemstar Construction11/29/2022
DOB NOWGeneral ConstructionSigned-offGemstar Construction11/29/2022
DOB NOWMechanical SystemsSigned-offGemstar Construction10/31/2022
DOB NOWSignSigned-offActive Signs07/20/2020
DOB NOWSignSigned-offActive Signs07/15/2020
BIS—ISSUEDRestore America10/03/2023
BISFPISSUEDFire Guard of L. I07/02/2015
BISPLISSUEDQBK Plumbing & Heating05/04/2015
BISOTISSUEDInterboro Sign & Maintenance12/27/2013
BIS—ISSUEDInterboro Sign & Electrical Maintenance12/27/2013
BIS—ISSUEDInterboro Sign & Electrical Maintenance12/27/2013
BIS—ISSUEDInterboro Sign & Electrical Maintenance12/27/2013
BIS—ISSUEDInterboro Sign & Electrical Maintenance12/27/2013
BIS—ISSUEDInterboro Sign & Electrical Maintenance12/27/2013
BISPLISSUEDRock E Small Plumbing & Heating02/26/2013
BISPLISSUEDCity Testing & Plumbing I07/10/2003
BIS—ISSUEDFJS Contracting07/01/2003
BISFPISSUEDAction Fire Service Co01/14/2000
BISOTISSUEDM.A.R. Mechanical09/30/1999
BISOTISSUEDM.A.R. Mechanical09/28/1999
BISOTISSUEDM.A.R. Mechanical09/28/1999
13 projects · most recent 12/27/2024
General Wiring
FiledStatusContractorScope
12/27/2024CompleteHunter Electric—
12/27/2024CompleteHunter ElectricGeneral Wiring
06/10/2024CompleteHunter Electric—
06/10/2024CompleteHunter Electric—
05/30/2024CompleteDelta Phase ElectricalGeneral Wiring
03/25/2024CompleteHunter ElectricGeneral Wiring
06/02/2023CompleteHunter ElectricGeneral Wiring
03/21/2022CancelledNycom ElectricalGeneral Wiring
07/27/2021CompleteNycom ElectricalGeneral Wiring
06/23/2021CompleteNycom ElectricalGeneral Wiring
06/23/2021CompleteNycom ElectricalGeneral Wiring
03/02/2020CompleteHunter ElectricGeneral Wiring
02/24/2020CompleteHunter ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/10/2024Pass-Final Sign Permit InspectionPassView ↗
04/28/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/21/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
01/10/2024Structural Steel - High Strength BoltingRUDOLPH DUPUYspecial
01/10/2024FinalPING MAN HOprogress
12/27/2023FinalPING MAN HOprogress
12/27/2023Structural Steel - High Strength BoltingRUDOLPH DUPUYspecial
12/26/2023FinalPING MAN HOprogress
12/18/2023Structural Steel - High Strength BoltingRUDOLPH DUPUYspecial
08/04/2023HVAC-R and service water heating system controlsJOHN CATAPANOenergy_progress
08/04/2023Shutoff dampersJOHN CATAPANOenergy_progress
08/04/2023HVAC-R and service water piping design and insulationJOHN CATAPANOenergy_progress
08/04/2023Mechanical SystemsJOHN CATAPANOspecial
08/04/2023Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
08/04/2023FinalJOHN CATAPANOprogress
08/04/2023Energy Code Compliance InspectionsJOHN CATAPANOprogress
08/04/2023Maintenance informationJOHN CATAPANOenergy_progress
07/25/2023FinalJOHN CATAPANOprogress
07/25/2023Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
07/25/2023Mechanical SystemsJOHN CATAPANOspecial
07/25/2023Energy Code Compliance InspectionsJOHN CATAPANOprogress
07/25/2023Maintenance informationJOHN CATAPANOenergy_progress
07/25/2023HVAC-R and service water piping design and insulationJOHN CATAPANOenergy_progress
07/25/2023Shutoff dampersJOHN CATAPANOenergy_progress
07/25/2023HVAC-R and service water heating system controlsJOHN CATAPANOenergy_progress
01/23/2023Mechanical SystemsRoger Tanspecial
01/23/2023Fire-Resistant Penetrations and JointsRoger Tanspecial
01/23/2023FinalJOHN CATAPANOprogress
Latest 25 of 72.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Asef PetroleumIndustrial / WarehouseFloor 1, Roof
Project B00812806 Alteration · LOC Issued · 02/06/2023
Project B00815331 Alteration · LOC Issued · 02/06/2023
Project B00602219 Alteration · LOC Issued · 12/08/2021
Dollar TreeRetailFloor 1, Roof
Project B00779066 Alteration · LOC Issued · 09/23/2022
Project B00779826 Alteration · LOC Issued · 09/23/2022
BP Filling StationAutomotive / fuelCellar, Floor 1, Roof
Project B00601908 Alteration · LOC Issued · 12/16/2021
Project B00602204 Alteration · LOC Issued · 12/16/2021
Asif PetroleumIndustrial / Warehouse—
Project B00363111 Alteration · LOC Issued · 06/29/2020
Project B00363602 Alteration · LOC Issued · 06/29/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 238 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch15
08/31/2026B00602219-P1Request digital key ↗
08/31/2026B00601908-P8Request digital key ↗
08/29/2026B00602204-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Sign4
09/02/2026B00363111-I1Request digital key ↗
09/02/2026B00363111-P1Request digital key ↗
09/02/2026B00363602-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026B00453701-I1Request digital key ↗
▸Applications & Permits73
▸BISPLAN / WORK APPROVAL APPLICATION57
02/06/2025301524125Open ↗
02/06/2025301524125Open ↗
10/24/2024301524125Open ↗
Showing 3 of 57 on file for this type
▸BISWORK PERMIT APPLICATION13
10/06/2023301524125Open ↗
09/27/2023301524125Open ↗
09/18/2023301524125Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/13/2025301524125Open ↗
▸BISTHE FIRE DEPARTMENT SIGNOFF FOR RELATEDAPPLICATION WITH THE FIRE DEPARTMENT.1
08/11/2021321131896Open ↗
▸BISOPEN ELECTRICAL APPLICATIONS B197107,B245973,B283015 AND B3641191
02/13/2025301524125Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
12/12/2024301524125Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/03/2023301524125Open ↗
▸Seals & Professional Certifications79
▸DOB NOWProgress Inspector Seal & Signature22
09/27/2026B00363602-I1Open ↗
09/23/2026B00779066-I1Open ↗
09/23/2026B00779066-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/01/2026B00453701-I1Open ↗
08/31/2026B00602219-P1Open ↗
08/31/2026B00602219-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/27/2026B00363602-I1Open ↗
09/23/2026B00779066-I1Open ↗
08/31/2026B00602204-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
01/06/2014320820607Open ↗
01/06/2014320820625Open ↗
01/06/2014320820616Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
01/06/2014320820607Open ↗
01/06/2014320820625Open ↗
01/06/2014320820616Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
05/18/2015321131896Open ↗
01/06/2014320820607Open ↗
01/06/2014320820607Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸BISEQUIPMENT USE PERMITS1
01/24/2025301524125Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
07/07/2015321131896Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/31/2026B00602219-P1Open ↗
08/31/2026B00601908-P8Open ↗
08/29/2026B00602204-I1Open ↗
Showing 3 of 15 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/15/2026B00601908-I1Open ↗
08/14/2026B00602219-I1Open ↗
08/13/2026B00602204-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
06/23/2022300940490Open ↗
06/23/2022300940490Open ↗
06/06/2022300940490Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs15
▸BISADMINISTRATIVE OBJECTIONS9
05/18/2015321131896Open ↗
01/06/2014320820607Open ↗
01/06/2014320820625Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
09/08/2023301524125Open ↗
09/06/2023301524125Open ↗
05/17/2023301524125Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/24/2022300940490Open ↗
08/11/2021321131896Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
08/11/2021321131896Open ↗
05/18/2015321131896Open ↗
01/06/2014320820607Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET9
05/18/2015321131896Open ↗
01/06/2014320820607Open ↗
01/06/2014320820625Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION3
02/13/2025301524125Open ↗
06/05/2024320820652Open ↗
06/05/2024320820661Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00779066-P1Open ↗
▸Other Documents2
▸BIS* * VENTILATION / AIR CONDITIONING1
12/12/2024301524125Open ↗
▸BIS* FIRE STOPS 27-3451
12/12/2024301524125Open ↗