Church, synagogue, chapel
Rossville A.M.E. Zion Church
584 BLOOMINGDALE ROAD · BIN 5086734
💬 Discuss this project
1897Year Built
1Stories
M1Building Class
R3-1Zoning
1,750 sfGross Floor Area
0Units
1 Open Violation ▸FDNY Report ↗
Church, synagogue, chapel · 52,065 sf lot · 0.03 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
CellarUnder Construction2p · 1 filing · 14 docs
BasementUnder Construction3p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROSSVILLE AME ZION CHURCH506/23/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURE STUDIO305/08/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G-NET CONSTRUCTION CORPGeneral Contractor104/09/2026
EGL HEATING INCPlumbing106/23/2026
Building Lifecycle
All (15)Filed (3)Permit Issued (2)Violation (1)Inspection (9)
06/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/08/2026
Filed — Alteration
RENOVATE CELLAR TO INCLUDE AN ADA BATHROOM BY RELOCATING EXISTING MENS WC AND WOMENS TOILETS; ADJUST SINK PLACEMENT, INSTALL NEW WATERLINE FOR FRIDGE, ADD DOUBLE KITCHEN SINK WITH HOT/COLD LINES, AND REPLACING GAS STOVE WITH LIKE.
S01199851-P1
04/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/10/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/23/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/10/2025
Permit issued — Plumbing
S01199851-S1-PL
09/22/2025
Permit issued — General Construction
S01199851-I1-GC
08/21/2025
Filed — Alteration
RENOVATE CELLAR TO INCLUDE AN ADA BATHROOM BY RELOCATING EXISTING MENS WC AND WOMENS TOILETS; ADJUST SINK PLACEMENT, INSTALL NEW WATERLINE FOR FRIDGE, ADD DOUBLE KITCHEN SINK WITH HOT/COLD LINES, AND REPLACING GAS STOVE WITH LIKE.
S01199851-S1
05/05/2025
Filed — Alteration
RENOVATE CELLAR TO INCLUDE AN ADA BATHROOM BY RELOCATING EXISTING MENS WC AND WOMENS TOILETS; ADJUST SINK PLACEMENT, INSTALL NEW WATERLINE FOR FRIDGE, ADD DOUBLE KITCHEN SINK WITH HOT/COLD LINES, AND REPLACING GAS STOVE WITH LIKE.
S01199851-I1
11/17/2007
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedEGL HEATING INC11/10/2025
DOB NOWGeneral ConstructionSigned-offG-NET CONSTRUCTION CORP09/22/2025
1 project · most recent 05/08/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/08/2026Permit IssuedEGL HEATING INCGas, Water/Sanitary
1 project · most recent 03/21/2026
General Wiring
FiledStatusContractorScope
03/21/2026CompleteE.N.E.L. ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/10/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/23/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AME Rossville ChurchOtherCellar
Project S01199851 Alteration · Permit Entire · 05/05/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026S01199851-I1Request digital key ↗
08/18/2026S01199851-P1Request digital key ↗
08/18/2026S01199851-S1Request digital key ↗
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/18/2026S01199851-P1Open ↗
08/13/2026S01199851-S1Open ↗
08/13/2026S01199851-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026S01199851-P1Open ↗
08/18/2026S01199851-S1Open ↗
08/18/2026S01199851-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/18/2026S01199851-S1Open ↗
08/18/2026S01199851-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/18/2026S01199851-P1Open ↗
08/18/2026S01199851-S1Open ↗
08/18/2026S01199851-I1Open ↗