← Back
Miscellaneous two family
584 PARK PLACE
BROOKLYN · BIN 3029266
💬 Discuss this project
1910Year Built
3Stories
B9Building Class
R6BZoning
4,004 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Miscellaneous two family · 2,620 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 2 filings · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
Sub-Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WILL DUBOSE DESIGN803/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/26/2024$2.4M—— → —$599/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INGA CONSULTING ENGINEERS708/05/2026
URBAN INTEGRATIONS109/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MODERN BUILDING CONSULTANT603/21/2026
RAMOS NY CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WILL DUBOSE DESIGN LLCGeneral Contractor1308/18/2026
ALL PRO PLBG & HTG INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252708/05/2026
Building Lifecycle
All (64)Filed (8)Permit Issued (8)Signed Off (1)Violation (7)Inspection (10)Special Inspection (30)
08/17/2026
Permit issued — Structural
B01437519-I1-GC-CX
08/05/2026
Filed — Alteration
Proposed construction of new roof terrace at roof level as per plans herewith filed. No change to use, egress or occupancy proposed under this application.
B01437519-I1
07/28/2026
Special inspection requirement — Structural Steel - Details
INDARDEO PARBHUNATH
07/28/2026
Special inspection requirement — Final
Andrew Inga
05/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/16/2026
Signed off — Alteration
Propose plumbing work for existing 2 family dwelling as per plan. No change in use, egress, or occupancy under this application
B01181637-S3
04/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
02/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
02/23/2026
Special inspection requirement — Final
Andrew Inga
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Andrew Inga
02/23/2026
Special inspection requirement — Interior lighting power
Andrew Inga
02/23/2026
Special inspection requirement — Fenestration air leakage
Andrew Inga
02/23/2026
Special inspection requirement — Fenestration areas
Andrew Inga
02/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Andrew Inga
02/23/2026
Special inspection requirement — Air barrier - visual inspection
Andrew Inga
02/06/2026
Filed — Alteration
Propose plumbing work for existing 2 family dwelling as per plan. No change in use, egress, or occupancy under this application
B01181637-P3
02/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Andrew Inga
02/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Andrew Inga
02/02/2026
Special inspection requirement — Fenestration areas
Andrew Inga
02/02/2026
Special inspection requirement — Fenestration air leakage
Andrew Inga
02/02/2026
Special inspection requirement — Interior lighting power
Andrew Inga
02/02/2026
Special inspection requirement — Air barrier - visual inspection
Andrew Inga
02/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
INDARDEO PARBHUNATH
02/02/2026
Special inspection requirement — Final
Andrew Inga
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
11/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/09/2025
Filed — Alteration
Propose plumbing work for existing 2 family dwelling as per plan. No change in use, egress, or occupancy under this application
B01181637-P2
10/09/2025
Special inspection requirement — Preliminary
INDARDEO PARBHUNATH
10/09/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
INDARDEO PARBHUNATH
10/09/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
INDARDEO PARBHUNATH
10/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
INDARDEO PARBHUNATH
10/09/2025
Special inspection requirement — Subgrade Inspections
INDARDEO PARBHUNATH
10/09/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
INDARDEO PARBHUNATH
10/09/2025
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
INDARDEO PARBHUNATH
10/09/2025
Special inspection requirement — Concrete - Cast-In-Place
INDARDEO PARBHUNATH
10/09/2025
Special inspection requirement — Final
NAVEEN KUMAR
10/09/2025
Special inspection requirement — Footing and Foundation
INDARDEO PARBHUNATH
10/02/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/22/2025
Filed — Alteration
CONSTRUCTION FENCE INSTALLED PER PLANS, NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01289697-I1
09/22/2025
Permit issued — Structural
B01181637-S3-GC-CX
09/22/2025
Permit issued — Construction Fence
B01289697-I1-FN
08/29/2025
Violation issued (ECB, closed)
Construction
08/29/2025
Violation issued (ECB, closed)
Construction
08/29/2025
Violation issued (ECB, closed)
Construction
08/28/2025
Violation issued (ECB, closed)
Site Safety
08/28/2025
Violation issued (ECB, closed)
Unknown
08/28/2025
Violation issued (ECB, closed)
Construction
07/25/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/08/2025
Filed — Alteration
Propose plumbing work for existing 2 family dwelling as per plan. No change in use, egress, or occupancy under this application
B01181637-P1
06/05/2025
Permit issued — Plumbing
B01181637-S1-PL
06/04/2025
Permit issued — General Construction
B01181637-I1-GC
06/04/2025
Permit issued — General Construction
B01181637-S3-GC-CX
04/09/2025
Permit issued — General Construction
B01181637-I1-GC
04/07/2025
Permit issued — Earth Work
B01181637-S3-GC-CX
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedWILL DUBOSE DESIGN LLC08/17/2026
DOB NOWStructuralSigned-offWILL DUBOSE DESIGN LLC09/22/2025
DOB NOWConstruction FencePermit IssuedWILL DUBOSE DESIGN LLC09/22/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC06/05/2025
DOB NOWGeneral ConstructionPermit IssuedWILL DUBOSE DESIGN LLC06/04/2025
DOB NOWGeneral ConstructionSigned-offWILL DUBOSE DESIGN LLC06/04/2025
DOB NOWGeneral ConstructionPermit IssuedWILL DUBOSE DESIGN LLC04/09/2025
DOB NOWEarth WorkSigned-offWILL DUBOSE DESIGN LLC04/07/2025
1 job · most recent 08/05/2026
General Wiring
FiledStatusContractorScope
08/05/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
2 jobs · most recent 08/05/2026
Steel Concrete
FiledStatusContractorScope
08/05/2026Permit IssuedWILL DUBOSE DESIGN LLCSteel
02/06/2026Signed-offWILL DUBOSE DESIGN LLCConcrete
1 job · most recent 09/22/2025
Fence
FiledStatusContractorScope
09/22/2025Permit IssuedWILL DUBOSE DESIGN LLCFence
1 job · most recent 02/06/2026
Earthwork
FiledStatusContractorScope
02/06/2026Signed-offWILL DUBOSE DESIGN LLCEarthwork
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/02/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/02/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/25/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
07/28/2026Structural Steel - DetailsINDARDEO PARBHUNATHspecial
07/28/2026FinalAndrew Ingaprogress
02/23/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
02/23/2026Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
02/23/2026FinalAndrew Ingaprogress
02/23/2026Energy Code Compliance InspectionsAndrew Ingaprogress
02/23/2026Interior lighting powerAndrew Ingaenergy_progress
02/23/2026Fenestration air leakageAndrew Ingaenergy_progress
02/23/2026Fenestration areasAndrew Ingaenergy_progress
02/23/2026Fenestration and door U-factor and product ratingsAndrew Ingaenergy_progress
02/23/2026Air barrier - visual inspectionAndrew Ingaenergy_progress
02/02/2026Energy Code Compliance InspectionsAndrew Ingaprogress
02/02/2026Fenestration and door U-factor and product ratingsAndrew Ingaenergy_progress
02/02/2026Fenestration areasAndrew Ingaenergy_progress
02/02/2026Fenestration air leakageAndrew Ingaenergy_progress
02/02/2026Interior lighting powerAndrew Ingaenergy_progress
02/02/2026Air barrier - visual inspectionAndrew Ingaenergy_progress
02/02/2026Fire-Resistance Rated ConstructionINDARDEO PARBHUNATHprogress
02/02/2026FinalAndrew Ingaprogress
02/02/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
10/09/2025PreliminaryINDARDEO PARBHUNATHprogress
10/09/2025Construction Operations Influencing Adjacent StructuresINDARDEO PARBHUNATHspecial
10/09/2025Excavations - Sheeting, Shoring, and BracingINDARDEO PARBHUNATHspecial
10/09/2025Structural Stability – Alterations of existing buildingsINDARDEO PARBHUNATHspecial
10/09/2025Subgrade InspectionsINDARDEO PARBHUNATHspecial
Latest 25 of 39.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026B01181637-P3Request digital key ↗
08/22/2026B01181637-S1Request digital key ↗
08/22/2026B01181637-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026B01181637-P3Open ↗
09/01/2026B01181637-P3Open ↗
09/01/2026B01181637-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026B01181637-P3Open ↗
08/25/2026B01437519-I1Open ↗
08/23/2026B01181637-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026B01181637-S3Open ↗
08/22/2026B01181637-S1Open ↗
08/22/2026B01181637-I1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/22/2026B01181637-P2Open ↗
08/22/2026B01181637-S1Open ↗
08/22/2026B01181637-I1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01181637-S3Open ↗