← Back
BuildNYC
Church, synagogue, chapel
585 LINCOLN AVENUE
STATEN ISLAND · BIN 5054755
💬 Discuss this project
1987Year Built
1Stories
M1Building Class
R3-1Zoning
3,200 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Church, synagogue, chapel · Owner of record: So Fourth · 4,140 sf lot · 0.77 FAR built · Flood zone AE
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CTR Properties103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rogers Calvanico Group112/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Largime Mujovic103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sken ServicesGeneral Contractor104/09/2026
MP Realty HoldingScaffold107/08/2026
Building Lifecycle
All (22)Filed (2)Permit Issued (2)Signed Off (2)Violation (16)
07/15/2026
Signed off — Alteration
S01330398-I1
05/05/2026
Signed off — Full Demolition
demolition of one-story building. On-site and off-sit fill not to exceed 300 cubic yards.
S01283865-I1
04/03/2026
Permit issued — Full Demolition
S01283865-I1-FD
01/22/2026
Permit issued — Construction Fence
S01330398-I1-FN
12/08/2025
Filed — Alteration
S01330398-I1
11/18/2025
Filed — Full Demolition
demolition of one-story building. On-site and off-sit fill not to exceed 300 cubic yards.
S01283865-I1
06/14/2025
VC20: failed to conduct required (initial/periodic) inspection or test of water based fire protection system at premises.
FDNY_NOV violation · closed
04/03/2025
Failure to maintain building in code compliant manner; roof at exposure 2 found in state of disrepair. Observed roof concaving and sinking. Missing…
ECB violation · closed
04/03/2025
No certificate of correction submitted to DOB for class 1 work without a permit violation #39095013R issued on 9/16/23 for interior gut renovation.…
ECB violation · closed
09/16/2023
At interior of premise there is a full gut renovation at time of inspection, obtain permit; stop all interior work obtain permit or return to prior…
ECB violation · closed
02/22/2019
: failed to conduct requir test/inspection vc 20:
FDNY_NOV violation · closed
01/08/2019
: failed to conduct requir test/inspection vc 20:
FDNY_NOV violation · closed
09/27/2016
Spk 7: arrange 5 year hydro test of spk sys
FDNY_ORDER violation · closed
05/14/2013
: failed to conduct requir test/inspection vc 20:
FDNY_NOV violation · closed
01/23/2013
Stop all work/work w/o a permit. (side) noted: extension at rear beingbuilt that is not part of the orig. Footprint of bldg & too close to adjacent…
ECB violation · closed
10/04/2012
: failed to conduct requir test/inspection vc 20:
FDNY_NOV violation · closed
06/17/2011
Work w/o permit.noted: @ roof of bldg erected 2 large (approx. 10FT. By 2FT) by 3FT.)statue/display/appurtenances).remedy; obtain permit to…
ECB violation · closed
05/08/2010
Operation of a pa w/o a current c/o. Remedy: obtain a c/o.
ECB violation · closed
12/13/1999
Failure to maintain exterior building wall, at right side of premises on colony st side defect: one story brick wall building in danger of…
ECB violation · closed
08/12/1999
Closed: Zoning (DOB violation)
DOB violation · closed on the city's record
05/10/1999
Zoning (DOB violation)
DOB violation · closed · Issued 1999; DOB's record still lists it as active
08/06/1991
Vc 12: fail to maintain spk/std/alarm/supp sys. Vc 19: failed to provide requir affidavit/plans vc 20: failed to conduct requir test/inspection vc…
FDNY_NOV violation · closed
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—TT & T Construction—
DOB NOW—MP Realty Holding—
BIS—AAA Plumbing & Heating—
BIS—Active Fire Extinguisher Co—
BIS—Atlantic Fire Service Co—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026S01283865-I1Request the plans ↗
08/17/2026S01330398-I1Request the plans ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
08/22/2014520205108Open ↗
06/06/2008510044088Open ↗
▸Seals & Professional Certifications7
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/22/2014520205108Open ↗
04/01/2009510044088Open ↗
04/01/2009510044088Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
06/06/2008510044088Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/06/2008510044088Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026S01330398-I1Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026S01283865-I1Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/22/2014520205108Open ↗
▸DOB NOWGas Cut-Off1
08/17/2026S01283865-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/17/2026S01283865-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026S01283865-I1Open ↗
▸DOB NOWWater Cut-Off1
08/17/2026S01283865-I1Open ↗
▸Environmental & Asbestos4
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/06/2008510044088Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/22/2014520205108Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01283865-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026S01283865-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/22/2014520205108Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE1
08/22/2014520205108Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/06/2008510044088Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/16/2009510044088Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/01/2009510044088Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
08/22/2014520205108Open ↗
06/06/2008510044088Open ↗
▸Other Documents4
▸DOB NOWCommunity Board Notification1
08/13/2026S01283865-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S01283865-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026S01283865-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026S01283865-I1Open ↗