← Back
Hospital, sanitarium, mental institution
DMRI Building
585 SCHENECTADY AVENUE · BIN 3327565
💬 Discuss this project
1975Year Built
11Stories
I1Building Class
R6Zoning
297,200 sfGross Floor Area
1Units
LL97 Covered59 Open Violations 48 unresolved · 11 paperwork only ▸FISP: SAFEFDNY Report ↗
Hospital, sanitarium, mental institution · Owner of record: RUTLAND NURSING HOME INC · 70,562 sf lot · 4.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 7 filings · 20 docs
Penthouse2p · 2 filings · 14 docs
Floor 11Under Construction1 filing · 2 docs
Floor 1011p · 3 filings · 20 docs
Floor 98p · 2 filings · 14 docs
Floor 89p · 3 filings · 20 docs
Floor 78p · 2 filings · 14 docs
Floor 68p · 2 filings · 14 docs
Floor 5Under Construction12p · 4 filings · 20 docs
Floor 4Under Construction24p · 6 filings · 20 docs
Floor 3Under Construction19p · 5 filings · 20 docs
Floor 2Under Construction19p · 4 filings · 20 docs
Floor 1Under Construction16p · 3 filings · 20 docs
CellarUnder Construction40p · 8 filings · 20 docs
Basement7p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMERICAN VENTILATION SERVICES209/13/2026
MONADNOCK DEVELOPMENT309/13/2026
BROOKDALE HOSPITAL MEDICAL CENTER6409/13/2026
A1EXPEDITERS1507/08/2026
ROCKLEDGE SCF CORP103/22/2026
RUTLAND NURSING HOME INC1203/22/2026
GOTHAM CONSTRUCTION103/22/2026
HUNTER ROBERTS GENERAL CONTRACTING203/22/2026
PREMIER DEVELOPMENT103/21/2026
FACILITIES ENGINEERING303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL EXPEDITING5203/21/2026
GREEN STUDIO803/21/2026
MERRITT ENGINEERING CONSULTANT DPC603/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HUNTER ROBERTS CONSTRUCTIONGeneral Contractor1607/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor1507/08/2026
NELSON AIR DEVICE CORPGeneral Contractor1207/08/2026
B & A RESTORATION CONTRAGeneral Contractor707/08/2026
CARDOZA PLUMBING CORPPlumbing507/08/2026
ALLIANCE PLUMBING CORPPlumbing407/08/2026
SIRINA FIRE PROT CORPFire Protection307/08/2026
JC ELITE CONSTRUCTION SERGeneral Contractor307/08/2026
FARID MARJIElectrical203/21/2026
MONADNOCK CONSTRUCTION INGeneral Contractor207/08/2026
ROCON CORPGeneral Contractor107/08/2026
ADCO ELEC'L CORPElectrical103/22/2026
ROCON CORPPlumbing106/27/2026
ANGELO DOMINGUEZElectrical103/21/2026
CHRISTOPHER VANELLAElectrical103/21/2026
DAY ELEC'L CONTR'G CORPElectrical103/22/2026
GEHRKE, BRIANElectrical103/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
PATRICK KENNELLYElectrical103/21/2026
RAJINDRAH RAMRATTANElectrical103/21/2026
REY, JOHNElectrical103/21/2026
VINCENT DURYEEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247404/21/2026
CONCRETE SOLUTIONS LAB CO5344204/08/2026
JPC LOGISTICS DBA JPCL EN3511407/02/2025
MERRITT ENGINEERING CONSU460209/15/2022
Building Lifecycle
All (300)Filed (40)Permit Issued (57)Signed Off (10)Facade (FISP) (6)Violation (50)Inspection (29)Objection (78)Special Inspection (30)
08/07/2026
Inspection — Pass Boiler Equipment Inspection
Pass
View inspection ↗
07/23/2026
Signed off — Alteration
B00771340-I1
07/21/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2026
Permit issued — Boiler Equipment
B01361821-S2-BE
06/18/2026
Filed — Alteration
INSTALLATION OF A 10,000 GALLON OIL TANK CONNECTED TO TWO (2) MOBILE BOILER TRAILERS SUBMITTING ON BEHALF OF CONTRACTOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01361821-S2
06/18/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/16/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/04/2026
Permit issued — General Construction
B01373591-I1-GC
05/04/2026
Permit issued — Structural
B01373591-S1-ST
05/01/2026
Permit issued — Mechanical Systems
B01361821-S1-GC-CX
04/30/2026
Permit issued — Structural
B00856680-I1-ST
04/21/2026
Filed — Alteration
INSTALLATION OF A 10,000 GALLON OIL TANK CONNECTED TO TWO (2) MOBILE BOILER TRAILERS SUBMITTING ON BEHALF OF CONTRACTOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01361821-S1
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Sunil Saigal
04/16/2026
Special inspection requirement — Post-installed Anchors
Sunil Saigal
04/16/2026
Special inspection requirement — Chimneys and vents
Sunil Saigal
04/08/2026
Filed — Alteration
Construction of a new foundation wall and exterior wall; selective infill; and select portions of roofing work necessary to enclose the building to remain as identified on the plans herein. No change in use, egress or occupancy.
B01373591-S1
04/08/2026
Filed — Alteration
Construction of a new foundation wall and exterior wall; selective infill; and select portions of roofing work necessary to enclose the building to remain as identified on the plans herein. No change in use, egress or occupancy.
B01373591-I1
04/06/2026
Special inspection requirement — Post-installed Anchors
MINA HANNA
04/06/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MINA HANNA
04/06/2026
Special inspection requirement — Masonry
MINA HANNA
04/06/2026
Special inspection requirement — Masonry
MINA HANNA
04/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MINA HANNA
04/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
MINA HANNA
04/06/2026
Special inspection requirement — Combustible Exterior Wall Coverings
MINA HANNA
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
04/06/2026
Special inspection requirement — Sprayed fire-resistant materials
MINA HANNA
04/06/2026
Special inspection requirement — Structural Steel - Details
MINA HANNA
04/06/2026
Special inspection requirement — Concrete - Cast-In-Place
MINA HANNA
04/06/2026
Special inspection requirement — Structural Steel - Welding
MINA HANNA
04/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
MINA HANNA
04/01/2026
Permit issued — Boiler Equipment
B01361821-I1-BE
03/30/2026
Signed off — Alteration
Supported scaffold installation as per plans filed herewith.
B01376745-I1
03/24/2026
Permit issued — Suspended Scaffold
B01376745-I1-SC
03/23/2026
Filed — Alteration
Supported scaffold installation as per plans filed herewith.
B01376745-I1
03/22/2026
Filed — Alteration
INSTALLATION OF A 10,000 GALLON OIL TANK CONNECTED TO TWO (2) MOBILE BOILER TRAILERS SUBMITTING ON BEHALF OF CONTRACTOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01361821-I1
03/17/2026
Special inspection requirement — Final
MINA HANNA
03/17/2026
Special inspection requirement — Final
MINA HANNA
02/18/2026
Special inspection requirement — Mechanical Systems
Sunil Saigal
02/18/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Sunil Saigal
02/18/2026
Special inspection requirement — Final
Sunil Saigal
01/15/2026
Signed off — Alteration
B00683637-I1
12/29/2025
Permit issued — General Construction
B00856670-I1-GC
12/29/2025
Permit issued — Mechanical Systems
B00856676-I1-MS
12/22/2025
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
12/22/2025
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
12/22/2025
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
12/18/2025
Permit issued — Plumbing
B00683637-I1-PL
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/19/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offROCON CORP06/23/2026
DOB NOWGeneral ConstructionPermit IssuedMONADNOCK CONSTRUCTION IN05/04/2026
DOB NOWStructuralPermit IssuedMONADNOCK CONSTRUCTION IN05/04/2026
DOB NOWMechanical SystemsPermit IssuedROCON CORP05/01/2026
DOB NOWStructuralPermit IssuedNELSON AIR DEVICE CORP04/30/2026
DOB NOWBoiler EquipmentSigned-offAMERICAN BOILER & WELDING04/01/2026
DOB NOWSuspended ScaffoldSigned-offAMERICAN VENTILATION SERV03/24/2026
DOB NOWGeneral ConstructionPermit IssuedNELSON AIR DEVICE CORP12/29/2025
DOB NOWMechanical SystemsPermit IssuedNELSON AIR DEVICE CORP12/29/2025
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE12/18/2025
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC07/10/2025
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION06/23/2025
DOB NOWStructuralPermit IssuedNELSON AIR DEVICE CORP05/14/2025
DOB NOWPlumbingSigned-offSIRINA FIRE PROT CORP04/01/2025
DOB NOWGeneral ConstructionSigned-offHUNTER ROBERTS CONSTRUCTION01/27/2025
DOB NOWMechanical SystemsPermit IssuedHUNTER ROBERTS CONSTRUCTION01/27/2025
DOB NOWGeneral ConstructionSigned-offHUNTER ROBERTS CONSTRUCTION01/27/2025
DOB NOWMechanical SystemsPermit IssuedNELSON AIR DEVICE CORP01/07/2025
DOB NOWGeneral ConstructionPermit IssuedNELSON AIR DEVICE CORP01/07/2025
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE10/24/2024
DOB NOWStructuralPermit IssuedNELSON AIR DEVICE CORP08/19/2024
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE08/16/2024
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC07/10/2024
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION06/26/2024
DOB NOWGeneral ConstructionPermit IssuedNELSON AIR DEVICE CORP04/15/2024
DOB NOWMechanical SystemsPermit IssuedNELSON AIR DEVICE CORP04/09/2024
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP04/02/2024
DOB NOWGeneral ConstructionSigned-offHUNTER ROBERTS CONSTRUCTION02/09/2024
DOB NOWMechanical SystemsPermit IssuedHUNTER ROBERTS CONSTRUCTION02/09/2024
DOB NOWGeneral ConstructionSigned-offHUNTER ROBERTS CONSTRUCTION02/06/2024
DOB NOWSprinklersSigned-offCARDOZA PLUMBING WMBE07/27/2023
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION07/18/2023
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC07/10/2023
DOB NOWConstruction FenceSigned-offSPRING SCAFFOLDING LLC07/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC07/10/2023
DOB NOWSidewalk ShedSigned-offSPRING SCAFFOLDING LLC05/12/2023
DOB NOWPlumbingSigned-offCARDOZA PLUMBING CORP03/29/2023
DOB NOWSprinklersSigned-offCARDOZA PLUMBING CORP03/17/2023
DOB NOWSprinklersSigned-offSIRINA FIRE PROT CORP03/07/2023
DOB NOWSprinklersSigned-offCARDOZA PLUMBING CORP02/21/2023
+ 60 more permits on file
3 projects · most recent 07/02/2025
Associated Ducts and Piping Ventilation Systems Generators Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/02/2025Permit IssuedHUNTER ROBERTS CONSTRUCTIAssociated Ducts and Piping, Ventilation Systems
Ventilation
__Junk__ EXHAUST & RETURN DUCT & FAN 1 CFM · Ductwork ×2
Ducts & Piping
__Junk__ ductwork & piping 1 CFM · Ductwork ×2
08/14/2023Permit IssuedNELSON AIR DEVICE CORPAssociated Ducts and Piping
Ducts & Piping
__Junk__ ductwork & piping 1 CFM · Ductwork ×1
03/16/2023——Associated Ducts and Piping, Generators, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Hitachi ACC-1-1: RAS-4.0PNNBDH1 & AC-C-1: RPK-4.0PNN1DH 3 tons · Vrf Outdoor ×4
Ventilation
Loren Cook EXHAUST DUCT & FAN 320 BTU · Exhaust Fan ×2
Generators
__Junk__ Generator 500 kW · Generator ×2
Ducts & Piping
__Junk__ ductwork & piping 1 BTU · Ductwork ×2
2 projects · most recent 08/14/2023
FiledStatusContractorScope
08/14/2023——12 heads
02/16/2023——1,086 heads
2 projects · most recent 08/14/2023
Water/Sanitary Medical Gas
FiledStatusContractorScope
08/14/2023Permit IssuedALLIANCE PLUMBING CORPWater/Sanitary
02/16/2023——Medical Gas, Water/Sanitary
14 projects · most recent 02/19/2026
General Wiring
FiledStatusContractorScope
02/19/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
06/20/2025CompleteUNITY ELECTRIC CO. INCGeneral Wiring
05/28/2024CompleteFOREST ELECTRIC CORP.General Wiring
05/28/2024CompleteFOREST ELECTRIC CORP.—
04/18/2023Permit IssuedALLRAN ELECTRIC OF NY LLC—
04/18/2023Permit IssuedALLRAN ELECTRIC OF NY LLCGeneral Wiring
03/20/2023CancelledNEAD ELECTRIC INC.General Wiring
10/24/2022Permit IssuedNEE ELECTRICAL, LLC—
07/21/2022Permit IssuedADCO ELEC'L CORP—
03/30/2022Permit IssuedNEE ELECTRICAL, LLC—
08/26/2021CompleteTOP SHELF ELECTRIC CORP—
07/13/2021CompleteHUGH O'KANE ELEC. CO. INCGeneral Wiring
10/13/2020Permit IssuedDAY ELEC'L CONTR'G CORPGeneral Wiring
09/28/2020Permit IssuedNEE ELECTRICAL, LLCGeneral Wiring
1 project · most recent 04/08/2026
Steel Concrete Masonry
FiledStatusContractorScope
04/08/2026Permit IssuedMONADNOCK CONSTRUCTION INSteel, Concrete, Masonry
1 project · most recent 02/05/2021
Scaffold
FiledStatusContractorScope
02/05/2021Permit IssuedB & A RESTORATION CONTRAScaffold
▾Field Inspections (DOB CAP) — 29
DateTypeResultReport
08/07/2026Pass Boiler Equipment InspectionPassView ↗
07/21/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/18/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/18/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/22/2025Certified Medical Gas - MG - PL - FinishCertifiedView ↗
12/22/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
12/22/2025Certified Medical Gas - MG - PL - TestCertifiedView ↗
09/19/2025Pass-Final PL - UndergroundPassView ↗
09/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2025Pass-Final PL - UndergroundPassView ↗
05/02/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/28/2025Certified Medical Gas - MG - PL - FinishCertifiedView ↗
03/28/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
03/28/2025Certified Medical Gas - MG - PL - TestCertifiedView ↗
03/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/31/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/24/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/24/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 29.
▾Special Inspection Requirements (DOB NOW) — 122
DateRequirementInspectorRole
04/16/2026Post-installed AnchorsSunil Saigalspecial
04/16/2026HVAC-R and service water piping design and insulationSunil Saigalenergy_progress
04/16/2026Chimneys and ventsSunil Saigalspecial
04/06/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
04/06/2026Exterior Insulation and Finish Systems (EIFS)MINA HANNAspecial
04/06/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
04/06/2026MasonryMINA HANNAspecial
04/06/2026Sprayed fire-resistant materialsMINA HANNAspecial
04/06/2026Energy Code Compliance InspectionsMINA HANNAprogress
04/06/2026Post-installed AnchorsMINA HANNAspecial
04/06/2026Structural Stability – Alterations of existing buildingsMINA HANNAspecial
04/06/2026Structural Steel - High Strength BoltingMINA HANNAspecial
04/06/2026Structural Steel - WeldingMINA HANNAspecial
04/06/2026Concrete - Cast-In-PlaceMINA HANNAspecial
04/06/2026MasonryMINA HANNAspecial
04/06/2026Structural Steel - DetailsMINA HANNAspecial
04/06/2026Combustible Exterior Wall CoveringsMINA HANNAspecial
03/17/2026FinalMINA HANNAprogress
03/17/2026FinalMINA HANNAprogress
02/18/2026Mechanical SystemsSunil Saigalspecial
02/18/2026FinalSunil Saigalprogress
02/18/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsSunil Saigalspecial
07/24/2025HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
07/24/2025Mechanical SystemsAsma Hashmispecial
07/24/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
Latest 25 of 122.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
One Brooklyn Health System - Kingsbrook Jewish Medical CenterMedical / HealthcareCellar, Floor 4
Project B00856670 Alteration · Permit Entire · 08/31/2023
Project B07997223 Alteration · Permit Entire · 11/03/2022
Project B07997664 Alteration · Approved · 11/03/2022
Kingbrook Jewish Medical CenterMedical / Healthcare—
Project B00492785 Alteration · LOC Issued · 05/06/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,029 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch36
09/01/2026B00492785-I1Request digital key ↗
09/01/2026B00492785-P1Request digital key ↗
09/01/2026B00499731-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/15/2026B00426091-I1Request digital key ↗
▸Applications & Permits196
▸BISPLAN / WORK APPROVAL APPLICATION108
07/29/2022321547983Open ↗
12/30/2020340332946Open ↗
12/30/2020340332946Open ↗
Showing 3 of 108 on file for this type
▸BISWORK PERMIT APPLICATION84
02/08/2024340332946Open ↗
02/06/2024340332946Open ↗
01/25/2024340332946Open ↗
Showing 3 of 84 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
11/14/2017321080432Open ↗
05/25/2017320997864Open ↗
11/01/2016321080432Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/21/2017320997864Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT I- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications245
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION113
02/01/2018321228818Open ↗
01/19/2018321551682Open ↗
01/19/2018321551682Open ↗
Showing 3 of 113 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
09/01/2026B00426091-I1Open ↗
09/01/2026B00492785-P1Open ↗
09/01/2026B00492785-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/01/2026B08044823-I1Open ↗
09/01/2026B00856670-I1Open ↗
09/01/2026B00856670-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/01/2026B00856670-I1Open ↗
09/01/2026B00856670-I1Open ↗
08/31/2026B01361821-S1Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
06/26/2017321551682Open ↗
04/04/2017321547983Open ↗
03/28/2017321545529Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
10/02/2020340769957Open ↗
06/26/2017321551682Open ↗
04/04/2017321547983Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/02/2020340769957Open ↗
04/21/2016340374552Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment73
▸BISSELF-CERT PLUMBING NOTICE19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA10
11/29/2017320238337Open ↗
06/14/2017320088962Open ↗
02/22/2017321017378Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
11/16/2017321080432Open ↗
06/26/2017321551682Open ↗
04/04/2017321547983Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT7
09/09/2016340374552Open ↗
09/09/2016340374552Open ↗
Showing 2 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS4
09/09/2016340374552Open ↗
Showing 1 of 4 on file for this type
▸BISSPRINKLER SYSTEMS1
04/25/2022321547983Open ↗
▸Safety & Tenant Protection1
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos73
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)18
10/02/2020340769957Open ↗
04/05/2017321545529Open ↗
12/05/2016321428576Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00499731-I1Open ↗
09/01/2026B00555781-I1Open ↗
08/31/2026B00683637-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form9
09/01/2026B00492785-I1Open ↗
08/27/2026B07997165-I1Open ↗
08/26/2026B00856670-I1Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/12/2020321545538Open ↗
▸Energy Compliance37
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
04/05/2017321545529Open ↗
03/28/2017321545529Open ↗
09/20/2016340374552Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: ENERGY10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/20/2016340374552Open ↗
Showing 1 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/02/2020340769957Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00499731-I1Open ↗
08/13/2026B00492785-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/24/2023340769957Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY4
11/09/2020340769957Open ↗
10/02/2020340769957Open ↗
Showing 2 of 4 on file for this type
▸BISHYDRO FLOW TEST LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs139
▸BISADMINISTRATIVE OBJECTIONS51
12/05/2016321428576Open ↗
Showing 1 of 51 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST38
01/29/2025340332946Open ↗
05/25/2023340769957Open ↗
08/30/2022321547983Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
08/28/2026B07997206-I1Open ↗
08/26/2026B00856680-I1Open ↗
08/17/2026B01361821-S2Open ↗
Showing 3 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter3
09/01/2026B00492785-I1Open ↗
08/13/2026B07997664-I1Open ↗
08/13/2026B07997662-I1Open ↗
▸BISFINAL2
01/28/2025340332946Open ↗
05/24/2023340769957Open ↗
▸BISSUPERSEDING LETTER1
06/24/2016340374552Open ↗
▸Cost, Insurance & Ownership107
▸BISCOST AFFIDAVIT100
10/02/2020340769957Open ↗
06/12/2018321080432Open ↗
02/15/2018321551682Open ↗
Showing 3 of 100 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
05/24/2023340769957Open ↗
08/26/2022321547983Open ↗
08/12/2020321545538Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms79
▸BISEFILING COVER SHEET60
06/30/2017321551682Open ↗
03/31/2017321545538Open ↗
03/31/2017321547983Open ↗
Showing 3 of 60 on file for this type
▸BISBOROUGH INTAKE FORM9
11/30/2022340332946Open ↗
01/15/2021340332946Open ↗
01/12/2021340332946Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
10/02/2020340769957Open ↗
Showing 1 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
12/27/2016321080432Open ↗
Showing 1 of 4 on file for this type
▸Other Documents16
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION13
11/30/2022340332946Open ↗
06/14/2017320088962Open ↗
06/05/2017320088962Open ↗
Showing 3 of 13 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type