← Back
Condo, residential unit in walk-up building
Diego Rivera Condominium
5860 WEST 106 STREET · Upper West Side-Manhattan Valley · BIN 1086064
💬 Discuss this project
1910Year Built
5Stories
R2Building Class
R8AZoning
17,562 sfGross Floor Area
20Units
Rent Stabilized1 Open Violation ▸
Condo, residential unit in walk-up building · Owner of record: DIEGO RIVERA CONDOMINIUM · 5,521 sf lot · 3.18 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 42p · 1 filing · 4 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEIGEO RIVERA CONDOMINIUM203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN TRANS ENGINEERING, LLC101/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARANDA PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292101/02/2020
Building Lifecycle
All (4)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (1)
05/14/2020
Signed off — Alteration
PROPOSE MINOR REPAIR IN APARTMENT 4D, CAP AND REMOVE BATHTUB AND INSTALLING STALL SHOWER. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS UNDER THIS APPLICATION.
M00272649-I1
01/30/2020
Permit issued — Plumbing
M00272649-I1-PL
01/02/2020
Filed — Alteration
PROPOSE MINOR REPAIR IN APARTMENT 4D, CAP AND REMOVE BATHTUB AND INSTALLING STALL SHOWER. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS UNDER THIS APPLICATION.
M00272649-I1
11/26/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP01/30/2020
BISOTISSUEDJ&N HOME IMPROVEMENT COR01/17/2020
BISOTISSUEDAMERI RESTORATION INC04/09/2015
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
11/26/2019Fire-Resistant Penetrations and JointsJose Santosspecial
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Plumbing1
09/05/2026M00272649-I1Request digital key ↗
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION2
01/17/2020123742236Open ↗
04/21/2015122198898Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
01/06/2020123742236Open ↗
11/20/2014122198898Open ↗
▸Seals & Professional Certifications8
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
01/06/2020123742236Open ↗
01/06/2020123742236Open ↗
01/06/2020123742236Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/06/2020123742236Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/06/2020123742236Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026M00272649-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026M00272649-I1Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
01/06/2020123742236Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/06/2020123742236Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00272649-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
01/06/2020123742236Open ↗
01/06/2020123742236Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/17/2020123742236Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/17/2020123742236Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/17/2020123742236Open ↗
06/17/2020123742236Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/17/2020123742236Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
06/17/2020123742236Open ↗
01/06/2020123742236Open ↗
11/20/2014122198898Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
01/06/2020123742236Open ↗
11/20/2014122198898Open ↗