Two family converted from one family
587 7 STREET
BROOKLYN · BIN 3025712
💬 Discuss this project
1889Year Built
2Stories
B3Building Class
R7BZoning
2,769 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 1,900 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof14p · 2 filings · 17 docs
Floor 2Under Construction15p · 3 filings · 20 docs
Floor 1Under Construction20p · 4 filings · 20 docs
CellarUnder Construction26p · 4 filings · 20 docs
Sub-BasementUnder Construction18p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALWAYS FAST SERVICES CORP106/15/2026
HATCHET ARCHITECTURE DPC205/05/2026
ASHRAF CORP107/22/2025
MARTOS ENGINEERING204/16/2025
RJD ENGINEERING LLC203/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1003/21/2026
KMA DESIGNS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOZEFKO CONSTRUCTION INCGeneral Contractor707/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor207/08/2026
SUPERB PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHRISTIAN L. MARTOS ENGIN5965204/16/2025
CROSSCHECK INSPECTION SER544303/11/2025
Building Lifecycle
All (48)Filed (8)Permit Issued (8)Violation (2)Inspection (4)Objection (10)Special Inspection (16)
06/15/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01413184-I1
06/15/2026
Permit issued — Supported Scaffold
B01413184-I1-SF
05/07/2026
Permit issued — Construction Fence
B01390373-I1-FN
05/05/2026
Filed — Alteration
Installation of construction fence at rear of property.
B01390373-I1
04/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/16/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/09/2025
Permit issued — Plumbing
B01174136-I1-PL
09/24/2025
Permit issued — Mechanical Systems
B01174114-I1-MS
09/24/2025
Permit issued — Structural
B01174254-I1-ST
09/24/2025
Permit issued — Foundation
B01174254-S1-FO
09/18/2025
Permit issued — General Construction
B01174083-I1-GC
08/22/2025
Violation issued (ECB, closed)
Unknown
07/23/2025
Permit issued — Supported Scaffold
B01206156-I1-SF
07/22/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01206156-I1
06/20/2025
Objection raised — Mechanical
06/20/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
04/25/2025
Objection raised — Admin
04/25/2025
Objection raised — Admin
04/16/2025
Filed — Alteration
Foundation work proposed for an existing two-family home. No change to use, occupancy or egress.
B01174254-S1
04/16/2025
Filed — Alteration
Foundation work proposed for an existing two-family home. No change to use, occupancy or egress.
B01174254-I1
04/15/2025
Special inspection requirement — Post-installed Anchors
Christian Martos
04/15/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Christian Martos
04/15/2025
Special inspection requirement — Structural Steel - Welding
Christian Martos
04/08/2025
Objection raised — Admin
03/31/2025
Special inspection requirement — Concrete - Cast-In-Place
Christian Martos
03/31/2025
Special inspection requirement — Post-installed Anchors
Christian Martos
03/31/2025
Special inspection requirement — Subgrade Inspections
Christian Martos
03/25/2025
Objection resolved — Addressed
03/20/2025
Objection raised — Admin
03/11/2025
Filed — Alteration
B01174136-I1
03/11/2025
Filed — Alteration
Installation of kitchen hood, bathroom and dryer exhaust for an existing two-family home. No change to use, occupancy or egress.
B01174114-I1
03/10/2025
Filed — Alteration
B01174083-I1
02/27/2025
Special inspection requirement — Footing and Foundation
Christian Martos
02/27/2025
Special inspection requirement — Final
Christian Martos
02/14/2025
Special inspection requirement — Structural Cold-Formed Steel
Christian Martos
02/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
01/30/2025
Special inspection requirement — Masonry
Christian Martos
01/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christian Martos
01/30/2025
Special inspection requirement — Final
Christian Martos
01/30/2025
Special inspection requirement — Final
EUGENE BIFULCO
01/30/2025
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
01/30/2025
Special inspection requirement — Structural Steel - Details
Christian Martos
04/27/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedJ & G CONSTRUCTION SVCS06/15/2026
DOB NOWConstruction FencePermit IssuedJOZEFKO CONSTRUCTION INC05/07/2026
DOB NOWPlumbingPermit IssuedSUPERB PLUMBING & HEATING10/09/2025
DOB NOWMechanical SystemsPermit IssuedJOZEFKO CONSTRUCTION INC09/24/2025
DOB NOWStructuralPermit IssuedJOZEFKO CONSTRUCTION INC09/24/2025
DOB NOWFoundationPermit IssuedJOZEFKO CONSTRUCTION INC09/24/2025
DOB NOWGeneral ConstructionPermit IssuedJOZEFKO CONSTRUCTION INC09/18/2025
DOB NOWSupported ScaffoldPermit IssuedJ & G CONSTRUCTION SVCS07/23/2025
1 project · most recent 03/11/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/11/2025Permit IssuedJOZEFKO CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ventilation
Panasonic FV-0511VKS2 60 CFM · Exhaust Fan ×3
1 project · most recent 11/18/2025
General Wiring
FiledStatusContractorScope
11/18/2025Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
1 project · most recent 04/16/2025
Steel Concrete Masonry
FiledStatusContractorScope
04/16/2025Permit IssuedJOZEFKO CONSTRUCTION INCSteel, Concrete, Masonry
3 projects · most recent 06/15/2026
Scaffold Fence
FiledStatusContractorScope
06/15/2026Permit IssuedJ & G CONSTRUCTION SVCSScaffold
05/05/2026Permit IssuedJOZEFKO CONSTRUCTION INCFence
07/22/2025Permit IssuedJ & G CONSTRUCTION SVCSScaffold
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
04/15/2025Post-installed AnchorsChristian Martosspecial
04/15/2025Structural Steel - High Strength BoltingChristian Martosspecial
04/15/2025Structural Steel - WeldingChristian Martosspecial
03/31/2025Concrete - Cast-In-PlaceChristian Martosspecial
03/31/2025Post-installed AnchorsChristian Martosspecial
03/31/2025Subgrade InspectionsChristian Martosspecial
02/27/2025Footing and FoundationChristian Martosprogress
02/27/2025FinalChristian Martosprogress
02/14/2025Structural Cold-Formed SteelChristian Martosspecial
02/14/2025Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
01/30/2025MasonryChristian Martosspecial
01/30/2025Structural Stability – Alterations of existing buildingsChristian Martosspecial
01/30/2025FinalChristian Martosprogress
01/30/2025FinalEUGENE BIFULCOprogress
01/30/2025Mechanical SystemsEUGENE BIFULCOspecial
01/30/2025Structural Steel - DetailsChristian Martosspecial
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026B01174083-I1Request digital key ↗
08/22/2026B01174114-I1Request digital key ↗
08/22/2026B01174136-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits5
▸DOB NOWLPC Approval/Permit5
08/13/2026B01174136-I1Open ↗
08/13/2026B01174254-S1Open ↗
08/13/2026B01174114-I1Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01174083-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01174083-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026B01174083-I1Open ↗
08/22/2026B01174114-I1Open ↗
08/22/2026B01174136-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01174254-S1Open ↗
08/27/2026B01174254-I1Open ↗
08/26/2026B01174114-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B01174254-S1Open ↗
08/27/2026B01174254-I1Open ↗
08/26/2026B01174114-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/22/2026B01174083-I1Open ↗
08/22/2026B01174114-I1Open ↗
08/22/2026B01174136-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWACP5/20/21 or V51
08/13/2026B01174254-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B01174254-S1Open ↗
▸Other Documents6
▸DOB NOWPlot Diagram2
08/13/2026B01174254-S1Open ↗
08/13/2026B01174083-I1Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026B01174114-I1Open ↗
08/13/2026B01174136-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01174083-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01174083-I1Open ↗