BROOKLYN
588 MARCY AVENUE
BROOKLYN · BIN 3048771
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
4 Open Violations ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
PenthouseUnder Construction22p · 1 filing · 20 docs
Floor 4Under Construction22p · 1 filing · 20 docs
Floor 3Under Construction22p · 1 filing · 20 docs
Floor 2Under Construction25p · 1 filing · 20 docs
Floor 1Under Construction21p · 1 filing · 20 docs
CellarUnder Construction26p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RELIABLE ENTERPRISES907/08/2026
R S CONTRACTING NY803/22/2026
AVA 588 MIA LLC103/22/2026
TO THE OWNER OF 588 MARCY103/22/2026
OWNER OF 588 MARCY AVE BK103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES5403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R & S CONTRACTING NY INCGeneral Contractor1307/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor407/08/2026
PLBG P & H INCPlumbing307/08/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56162311/13/2025
Building Lifecycle
All (231)Filed (29)Permit Issued (19)Signed Off (12)Violation (60)Inspection (15)Objection (66)Special Inspection (30)
08/13/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
03/26/2026
Signed off — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-I1
11/26/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/26/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
11/26/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
11/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
11/26/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
11/26/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
11/26/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
11/26/2025
Special inspection requirement — Metering
FAHAD FATEH
11/26/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/26/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
11/26/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
11/26/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/26/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
11/13/2025
Filed — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-A9
11/13/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
11/13/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
11/13/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
11/13/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
11/13/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
11/13/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
11/13/2025
Special inspection requirement — Metering
FAHAD FATEH
11/13/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
11/13/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
11/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
11/13/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
11/13/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
11/13/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
11/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
11/13/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
07/22/2025
Signed off — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-S4
07/22/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
05/21/2025
Signed off — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-S7
05/14/2025
Objection resolved — Addressed
05/08/2025
Objection raised — Cost
04/29/2025
Filed — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-A8
04/09/2025
Signed off — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-S8
04/03/2025
Signed off — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-S9
03/13/2025
Signed off — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-S3
01/13/2025
Filed — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-A7
12/12/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/15/2024
Filed — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-A5
10/08/2024
Permit issued — Boiler Equipment
B00603782-S9-BE
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/20/2024
Signed off — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-S6
09/19/2024
Filed — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-S9
09/19/2024
Signed off — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-S2
09/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/19/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/06/2024
Filed — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-A4
09/04/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/04/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/30/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/30/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/29/2024
Signed off — Alteration CO
Horizontal 4 story and penthouse addition to existing 4 story mixed use building. Minor exterior repairs to resolve vacate order B525/19, and related DOB violation 112319CCER01DM.
B00603782-S5
08/21/2024
Objection resolved — Addressed
08/16/2024
Permit issued — Plumbing
B00603782-S7-PL
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offPLBG P & H INC10/08/2024
DOB NOWPlumbingSigned-offPLBG P & H INC08/16/2024
DOB NOWGeneral ConstructionPermit IssuedR & S CONTRACTING NY INC05/28/2024
DOB NOWMechanical SystemsSigned-offR & S CONTRACTING NY INC05/03/2024
DOB NOWPlumbingSigned-offBRUCHE MECHANICAL NY LLC02/27/2024
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC12/05/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC12/01/2023
DOB NOWGeneral ConstructionPermit IssuedR & S CONTRACTING NY INC06/22/2023
DOB NOWPlumbingSigned-offPLBG P & H INC06/14/2023
DOB NOWStructuralSigned-offR & S CONTRACTING NY INC06/06/2023
DOB NOWConstruction FenceSigned-offR & S CONTRACTING NY INC06/06/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC01/20/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC01/20/2023
DOB NOWCurb CutSigned-offR & S CONTRACTING NY INC10/24/2022
DOB NOWEarth WorkSigned-offR & S CONTRACTING NY INC06/16/2022
DOB NOWFoundationSigned-offR & S CONTRACTING NY INC06/16/2022
DOB NOWSupport of ExcavationSigned-offR & S CONTRACTING NY INC05/27/2022
DOB NOWGeneral ConstructionPermit IssuedR & S CONTRACTING NY INC05/04/2022
DOB NOWConstruction FenceSigned-offR & S CONTRACTING NY INC04/27/2022
1 project · most recent 11/13/2025
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/13/2025Permit IssuedR & S CONTRACTING NY INCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MSZ-GL09NA-U2 14,000 BTU · Heat Pump Outdoor ×4
MXZ-3C30NA3 60,000 BTU · Heat Pump Outdoor ×2
MXZ-3C30NAHZ4 28,400 BTU · Heat Pump Outdoor ×2
MXZ-3C30NA4 28,400 BTU · Heat Pump Outdoor ×1
MXZ-SM60NAM-U1 60,000 BTU · Heat Pump Outdoor ×1
Daikin GSXN3N6010AA 40,500 BTU · Heat Pump Outdoor ×1
Heating
Indeeco indeeco ulir 300 CFM · Electric Heater ×2
Ventilation
Greenheck SP-B90 50 CFM · Exhaust Fan ×6
SP-B110 100 CFM · Kitchen Exhaust ×4
1 project · most recent 11/13/2025
Sprinkler System
FiledStatusContractorScope
11/13/2025Signed-offPLBG P & H INCSprinkler System
1 project · most recent 11/13/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/13/2025Signed-offBRUCHE MECHANICAL NY LLCGas, Storm, Water/Sanitary
2 projects · most recent 02/18/2024
General Wiring
FiledStatusContractorScope
02/18/2024CompleteACCURATE ELEC'L CORP.General Wiring
01/20/2023CompleteRICHARD NEU—
1 project · most recent 11/13/2025
Steel Masonry
FiledStatusContractorScope
11/13/2025Signed-offBRUCHE MECHANICAL NY LLCSteel, Masonry
1 project · most recent 11/13/2025
Fence
FiledStatusContractorScope
11/13/2025Signed-offBRUCHE MECHANICAL NY LLCFence
1 project · most recent 11/13/2025
Earthwork
FiledStatusContractorScope
11/13/2025Signed-offBRUCHE MECHANICAL NY LLCEarthwork
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
08/13/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/22/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
12/12/2024Pass-Final Boiler Equipment InspectionPassView ↗
09/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/19/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
09/04/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/04/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
08/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/30/2024Fail-Final CND-Occupancy InspectionFailView ↗
06/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/22/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/06/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 133
DateRequirementInspectorRole
11/26/2025MeteringFAHAD FATEHenergy_progress
11/26/2025Fenestration air leakageFAHAD FATEHenergy_progress
11/26/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
11/26/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
11/26/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
11/26/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
11/26/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
11/26/2025Maintenance informationFAHAD FATEHenergy_progress
11/26/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
11/26/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
11/26/2025Fenestration areasFAHAD FATEHenergy_progress
11/26/2025Exterior lighting powerFAHAD FATEHenergy_progress
11/26/2025Lighting controlsFAHAD FATEHenergy_progress
11/26/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
11/26/2025Interior lighting powerFAHAD FATEHenergy_progress
11/13/2025Exterior lighting powerFAHAD FATEHenergy_progress
11/13/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
11/13/2025Interior lighting powerFAHAD FATEHenergy_progress
11/13/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
11/13/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
11/13/2025Fenestration areasFAHAD FATEHenergy_progress
11/13/2025Maintenance informationFAHAD FATEHenergy_progress
11/13/2025Lighting controlsFAHAD FATEHenergy_progress
11/13/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
11/13/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 133.
▾Documents — 264 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch29
08/28/2026B08045957-I1Request digital key ↗
08/27/2026B00811736-I1Request digital key ↗
08/26/2026B00603782-S8Request digital key ↗
Showing 3 of 29 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
06/28/2024322117268Open ↗
06/03/2024340828625Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/23/2023340828625Open ↗
▸Zoning, Tax Lot & Property Records26
▸DOB NOWZD1: DOB Zoning Diagram11
08/13/2026B00603782-A4Open ↗
08/13/2026B00603782-I1Open ↗
08/13/2026B00603782-A1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWZoning Exhibit form (1-5)11
08/13/2026B00603782-A1Open ↗
08/13/2026B00603782-A3Open ↗
08/13/2026B00603782-P6Open ↗
Showing 3 of 11 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/02/2024322117268Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/02/2024322117268Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/02/2024322117268Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications75
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/13/2026B00603782-S5Open ↗
08/13/2026B00603782-I1Open ↗
08/13/2026B00603782-S8Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/29/2026B00603782-P3Open ↗
09/29/2026B00603782-P3Open ↗
09/01/2026B00603782-A7Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/29/2026B00603782-P3Open ↗
09/29/2026B00603782-P3Open ↗
09/23/2026B00603782-S9Open ↗
Showing 3 of 18 on file for this type
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)11
08/13/2026B00603782-A9Open ↗
08/13/2026B00603782-P4Open ↗
08/13/2026B00603782-P5Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection15
▸DOB NOWStreet Tree Checklist11
08/13/2026B00603782-A1Open ↗
08/13/2026B00603782-A3Open ↗
08/13/2026B00603782-A4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWStreet Tree Sign Off2
08/26/2026B00603782-I1Open ↗
08/13/2026B00603782-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00603782-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00603782-I1Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report27
08/13/2026B00603782-P3Open ↗
08/13/2026B00603782-A2Open ↗
08/13/2026B00603782-A3Open ↗
Showing 3 of 27 on file for this type
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026B00603782-S3Open ↗
08/13/2026B00603782-S8Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT4
08/13/2026B00603782-P2Open ↗
08/13/2026B00603782-S3Open ↗
08/13/2026B00603782-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B00603782-S3Open ↗
08/13/2026B00603782-S1Open ↗
08/13/2026B00603782-S2Open ↗
▸DOB NOWTR4 Plot Diagram3
08/13/2026B00603782-S1Open ↗
08/13/2026B00603782-S3Open ↗
08/13/2026B00603782-S2Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/02/2024322117268Open ↗
07/02/2024322117268Open ↗
07/02/2024322117268Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
06/17/2024340828625Open ↗
04/04/2023340828625Open ↗
▸BISEFILING COVER SHEET1
06/28/2024322117268Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/23/2023340828625Open ↗
▸Other Documents56
▸DOB NOWPlot Diagram15
08/13/2026B00603782-A5Open ↗
08/13/2026B00603782-A3Open ↗
08/13/2026B00603782-P3Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProperty Ownership Certification13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWSite Survey: Initial11
08/13/2026B00603782-A5Open ↗
08/13/2026B00603782-A9Open ↗
08/13/2026B00603782-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone11
08/13/2026B00603782-A3Open ↗
08/13/2026B00603782-A9Open ↗
08/13/2026B00603782-A5Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00603782-S3Open ↗
08/13/2026B00603782-S1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/23/2023340828625Open ↗
▸BISPLOT DIAGRAM1
07/02/2024322117268Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00603782-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00603782-I1Open ↗