← Back
Two stories - detached, small or mid-size
59-16 57 DRIVE
QUEENS · BIN 4060154
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R4-1Zoning
864 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,500 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC ARCHITECT, PC208/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CH CORNERSTONE DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LT PRO CONSTRUCTION INCGeneral Contractor603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BEYOND ARCH LLC3600208/15/2025
Building Lifecycle
All (5)Filed (2)Permit Issued (2)Signed Off (1)
11/06/2025
Signed off — Alteration
1. REPAIR AND REPLACE PORTION OF ROOF. REPLACE VINYL SIDING WITH STUCCO 2. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q01129275-I1
08/15/2025
Filed — Alteration
1. REPAIR AND REPLACE PORTION OF ROOF. REPLACE VINYL SIDING WITH STUCCO 2. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q01129275-P1
01/31/2025
Permit issued — General Construction
Q01129275-I1-GC-CX
12/16/2024
Permit issued — Structural
Q01129275-I1-GC-CX
10/22/2024
Filed — Alteration
1. REPAIR AND REPLACE PORTION OF ROOF. REPLACE VINYL SIDING WITH STUCCO 2. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q01129275-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLT PRO CONSTRUCTION INC01/31/2025
DOB NOWStructuralSigned-offLT PRO CONSTRUCTION INC12/16/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/29/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/25/2025Structural Stability – Alterations of existing buildingsHackjong Choispecial
08/25/2025FinalTae Chongprogress
08/25/2025Structural Wood FrameHackjong Choiprogress
08/25/2025Fenestration and door U-factor and product ratingsHackjong Choienergy_progress
08/25/2025Air barrier - visual inspectionHackjong Choienergy_progress
08/25/2025Fenestration areasHackjong Choienergy_progress
08/25/2025Insulation placement and R valuesHackjong Choienergy_progress
08/14/2025Structural Stability – Alterations of existing buildingsHackjong Choispecial
08/14/2025FinalTae Chongprogress
08/14/2025Structural Wood FrameHackjong Choiprogress
08/14/2025Insulation placement and R valuesHackjong Choienergy_progress
08/14/2025Air barrier - visual inspectionHackjong Choienergy_progress
08/14/2025Fenestration areasHackjong Choienergy_progress
08/14/2025Fenestration and door U-factor and product ratingsHackjong Choienergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026Q01129275-P1Request digital key ↗
08/19/2026Q01129275-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026Q01129275-I1Open ↗
08/28/2026Q01129275-I1Open ↗
08/28/2026Q01129275-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026Q01129275-I1Open ↗
08/13/2026Q01129275-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01129275-I1Open ↗
08/23/2026Q01129275-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026Q01129275-I1Open ↗
08/13/2026Q01129275-P1Open ↗
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q01129275-I1Open ↗