2 Active Violations 0 unresolved · 2 paperwork only▸
ECB04/11/200750A,b,c,d,e,f.fucton vt boiler,15HP,NB38014,gas,1980.50A-missing coveron boiler control panel.50B-improper arrangement of the blowdown valves.50C-secondary low water manual reset switch not connected.50D-gaugeNothing owed — awaiting certificate of correction
ECB04/11/2007Fucton vt boiler 15HP,NB36672,gas,1979/.50A-improper arrangement of the blowdown valves,install a screw type(slow)valve at the outlet end of the blowdown line.50B-gauge glass drain line too short.extend lineNothing owed — awaiting certificate of correction
Factory, industrial, miscellaneous · Owner of record: 59-23 Decatur St · 1.25 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.