← Back
Two family frame
59-30 69 PLACE
QUEENS · BIN 4063575
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R4-1Zoning
2,012 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Two family frame · 2,308 sf lot · 0.87 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC205/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J B I CONSTRUCTION GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JSP ELECTL CNTNG CORPElectrical103/22/2026
J.B.I. CONSTRUCTION GROUPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116205/13/2024
Building Lifecycle
All (15)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (10)
08/09/2024
Violation issued (ECB, open)
Construction
05/22/2024
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISITNG ROOF TOP. NO CHANGES THE USE EGRESS OR OCCUPANCY.
Q01015122-I1
05/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
05/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
05/16/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
05/16/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
05/16/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
05/13/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISITNG ROOF TOP. NO CHANGES THE USE EGRESS OR OCCUPANCY.
Q01015122-P1
05/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
05/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
05/10/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
05/10/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
05/10/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
03/14/2024
Permit issued — Solar
Q01015122-I1-SL
03/07/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISITNG ROOF TOP. NO CHANGES THE USE EGRESS OR OCCUPANCY.
Q01015122-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP03/14/2024
BISOTISSUEDVOLTAIC SOLAIRE LLC09/22/2023
2 projects · most recent 02/26/2024
FiledStatusContractorScope
02/26/2024CompleteJSP ELECTL CNTNG CORP—
08/04/2023CancelledBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
05/16/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
05/16/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
05/16/2024FinalVYACHESLAV NECHAYEVprogress
05/16/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
05/16/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
05/10/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
05/10/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
05/10/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
05/10/2024FinalVYACHESLAV NECHAYEVprogress
05/10/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026Q01015122-I1Request digital key ↗
08/22/2026Q01015122-P1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/10/2023440796783Open ↗
▸BISWORK PERMIT APPLICATION1
09/22/2023440796783Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026Q01015122-P1Open ↗
08/29/2026Q01015122-P1Open ↗
08/26/2026Q01015122-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q01015122-I1Open ↗
08/13/2026Q01015122-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026Q01015122-P1Open ↗
08/26/2026Q01015122-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/10/2023440796783Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/10/2023440796783Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
09/22/2023440796783Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01015122-I1Open ↗
08/13/2026Q01015122-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/10/2023440796783Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/10/2023440796783Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/10/2023440796783Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/10/2023440796783Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/10/2023440796783Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01015122-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/10/2023440796783Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
08/10/2023440796783Open ↗
▸BISADDITIONAL INFORMATION1
09/19/2023440796783Open ↗