General warehouse
59-48 60 ROAD
QUEENS · BIN 4059584
💬 Discuss this project
1931Year Built
1Stories
E1Building Class
R4-1Zoning
4,146 sfGross Floor Area
1Units
General warehouse · Owner of record: TOPVIEW 60 LLC · 5,000 sf lot · 0.83 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof2p · 1 filing · 20 docs
Floor 11p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TOPVIEW 601009/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/22/2023$2.3M—— → —$555/sf building
05/19/2022$1.3M—— → —$314/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SU ARCHITECT, P.C.404/29/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XH&RC PLUMBING HEATINGGeneral Contractor303/21/2026
A ELECTRICAL MAIN SVC INCElectrical103/22/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SU ARCHITECT PC6857404/29/2026
Building Lifecycle
All (62)Filed (4)Permit Issued (2)Signed Off (1)Inspection (3)Objection (22)Special Inspection (30)
06/01/2026
Signed off — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 001 FLOOR WITH GENERAL CONSTRUCTION WORK, TO INSTALL NEW AC UNITS ON 1ST FLOOR AND ROOF AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00916259-I1
05/12/2026
Special inspection requirement — Mechanical Systems
QIANG SU
05/12/2026
Special inspection requirement — Maintenance information
QIANG SU
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
QIANG SU
05/12/2026
Special inspection requirement — Interior lighting power
QIANG SU
05/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
QIANG SU
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
QIANG SU
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
05/12/2026
Special inspection requirement — Final
Giap Flores
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
04/29/2026
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 001 FLOOR WITH GENERAL CONSTRUCTION WORK, TO INSTALL NEW AC UNITS ON 1ST FLOOR AND ROOF AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00916259-P2
04/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
QIANG SU
04/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
04/29/2026
Special inspection requirement — Mechanical Systems
QIANG SU
04/29/2026
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
04/29/2026
Special inspection requirement — Final
Giap Flores
04/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
QIANG SU
04/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
QIANG SU
04/29/2026
Special inspection requirement — Duct leakage testing, insulation and design
QIANG SU
04/29/2026
Special inspection requirement — Interior lighting power
QIANG SU
04/29/2026
Special inspection requirement — Maintenance information
QIANG SU
04/01/2026
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 001 FLOOR WITH GENERAL CONSTRUCTION WORK, TO INSTALL NEW AC UNITS ON 1ST FLOOR AND ROOF AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00916259-P1
10/24/2025
Special inspection requirement — Mechanical Systems
QIANG SU
10/24/2025
Special inspection requirement — Final
Giap Flores
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
QIANG SU
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIANG SU
10/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
QIANG SU
10/24/2025
Special inspection requirement — Interior lighting power
QIANG SU
10/24/2025
Special inspection requirement — Maintenance information
QIANG SU
10/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
QIANG SU
10/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
QIANG SU
10/24/2025
Special inspection requirement — Duct leakage testing, insulation and design
QIANG SU
12/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/03/2024
Permit issued — Plumbing
Q00916316-I1-PL
01/03/2024
Permit issued — General Construction
Q00916259-I1-GC-CX
11/14/2023
Objection resolved — Addressed
11/14/2023
Objection resolved — Addressed
11/13/2023
Objection raised — Other
10/30/2023
Objection resolved — Addressed
10/26/2023
Objection resolved — Addressed
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection resolved — Addressed
10/25/2023
Objection resolved — Addressed
10/12/2023
Objection resolved — Addressed
10/11/2023
Objection resolved — Addressed
10/11/2023
Objection resolved — Addressed
10/11/2023
Objection resolved — Addressed
09/29/2023
Objection raised — Inspections
09/29/2023
Objection raised — Fire_Protection
09/29/2023
Objection raised — Zoning
09/29/2023
Objection raised — Zoning
09/29/2023
Objection raised — Fire_Protection
09/29/2023
Objection raised — Inspections
09/29/2023
Objection raised — Scope
09/29/2023
Objection raised — Other
09/29/2023
Objection raised — Mechanical
09/29/2023
Objection raised — Other
09/25/2023
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE ON 001 FLOOR WITH GENERAL CONSTRUCTION WORK, TO INSTALL NEW AC UNITS ON 1ST FLOOR AND ROOF AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q00916259-I1
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedXH&RC PLBG AND HTG INC01/03/2024
DOB NOWGeneral ConstructionSigned-offXH&RC PLUMBING HEATING01/03/2024
1 project · most recent 04/29/2026
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
04/29/2026Signed-offXH&RC PLUMBING HEATINGAir Conditioning Systems, Associated Ducts and Piping
Cooling
Gree GMV-96WM/B-F 92,000 BTU · Vrf Outdoor ×9
GMV-ND48PHS/B 48,000 BTU · Vrf Outdoor ×9
GMV-ND42PHS/B 42,000 BTU · Vrf Outdoor ×6
Ducts & Piping
Gree GMV-ND48PHS/B 4 tons · Vrf Outdoor ×6
GMV-ND42PHS/B 3 tons · Vrf Outdoor ×4
1 project · most recent 09/25/2023
Water/Sanitary
FiledStatusContractorScope
09/25/2023Permit IssuedXH&RC PLBG AND HTG INCWater/Sanitary
2 projects · most recent 12/27/2025
General Wiring
FiledStatusContractorScope
12/27/2025Permit IssuedA ELECTRICAL MAIN SVC INCGeneral Wiring
05/13/2025CompleteV A ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/12/2026Mechanical SystemsQIANG SUspecial
05/12/2026Maintenance informationQIANG SUenergy_progress
05/12/2026HVAC-R and service water piping design and insulationQIANG SUenergy_progress
05/12/2026Interior lighting powerQIANG SUenergy_progress
05/12/2026Duct leakage testing, insulation and designQIANG SUenergy_progress
05/12/2026HVAC-R and service water heating system controlsQIANG SUenergy_progress
05/12/2026Energy Code Compliance InspectionsQIANG SUprogress
05/12/2026FinalGiap Floresprogress
05/12/2026Fire-Resistant Penetrations and JointsQIANG SUspecial
04/29/2026HVAC-R and service water heating system controlsQIANG SUenergy_progress
04/29/2026Fire-Resistant Penetrations and JointsQIANG SUspecial
04/29/2026Mechanical SystemsQIANG SUspecial
04/29/2026Energy Code Compliance InspectionsQIANG SUprogress
04/29/2026FinalGiap Floresprogress
04/29/2026HVAC-R and service water heating equipmentQIANG SUenergy_progress
04/29/2026HVAC-R and service water piping design and insulationQIANG SUenergy_progress
04/29/2026Duct leakage testing, insulation and designQIANG SUenergy_progress
04/29/2026Interior lighting powerQIANG SUenergy_progress
04/29/2026Maintenance informationQIANG SUenergy_progress
10/24/2025Mechanical SystemsQIANG SUspecial
10/24/2025FinalGiap Floresprogress
10/24/2025Energy Code Compliance InspectionsQIANG SUprogress
10/24/2025Fire-Resistant Penetrations and JointsQIANG SUspecial
10/24/2025HVAC-R and service water piping design and insulationQIANG SUenergy_progress
10/24/2025Interior lighting powerQIANG SUenergy_progress
Latest 25 of 31.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/24/2026Q00916316-I1Request digital key ↗
08/17/2026Q00916259-I1Request digital key ↗
08/17/2026Q00916259-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026Q00916259-P2Open ↗
09/02/2026Q00916259-P2Open ↗
09/02/2026Q00916259-P2Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q00916259-P2Open ↗
09/02/2026Q00916259-P2Open ↗
08/28/2026Q00916259-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/24/2026Q00916316-I1Open ↗
08/17/2026Q00916259-P2Open ↗
08/13/2026Q00916259-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026Q00916316-I1Open ↗
08/17/2026Q00916259-P2Open ↗
08/13/2026Q00916259-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/17/2026Q00916259-I1Open ↗