← Back
Three families
59 BEAVER STREET
BROOKLYN · BIN 3071750
💬 Discuss this project
1920Year Built
3Stories
C0Building Class
M1-1Zoning
2,520 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 59 BEAVER ST 26 LLC · 1,830 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 20 docs
Floor 32p · 1 filing · 15 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
59 BEAVER ST 26 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/09/2020$970K—Private party → 59 BEAVER ST 26 LLC$385/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
L & C ASSOCIATES711/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EAST ENDERS NYC INCGeneral Contractor507/08/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAM &CO CONSULTING LLC DB2159711/10/2021
Building Lifecycle
All (97)Filed (7)Permit Issued (4)Signed Off (3)Violation (53)Special Inspection (30)
05/01/2026
Violation issued (HPD, closed)
A
06/06/2025
Violation issued (HPD, closed)
A
11/25/2024
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
12/07/2021
Signed off — Alteration
B00482049-I1
12/03/2021
Signed off — Alteration
EXISTING THREE STORY. CELLAR TO 3RD FLOOR BUILDING. PLUMBING WORK. AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00481619-I1
11/19/2021
Signed off — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00481599-I1
11/15/2021
Special inspection requirement — HVAC-R and service water heating equipment
RONNY LAM
11/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONNY LAM
11/15/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
11/15/2021
Special inspection requirement — HVAC-R and service water heating system controls
RONNY LAM
11/15/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
11/10/2021
Filed — Alteration
EXISTING THREE STORY. CELLAR TO 3RD FLOOR BUILDING. PLUMBING WORK. AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00481619-P3
11/10/2021
Special inspection requirement — HVAC-R and service water heating equipment
RONNY LAM
11/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONNY LAM
11/10/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
11/10/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
11/10/2021
Special inspection requirement — HVAC-R and service water heating system controls
RONNY LAM
10/21/2021
Permit issued — General Construction
B00481599-I1-GC
09/24/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00481599-P1
09/24/2021
Filed — Alteration
EXISTING THREE STORY. CELLAR TO 3RD FLOOR BUILDING. PLUMBING WORK. AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00481619-P1
09/24/2021
Filed — Alteration
B00482049-P2
09/24/2021
Special inspection requirement — Mechanical Systems
RONNY LAM
09/24/2021
Special inspection requirement — Heating Systems
RONNY LAM
09/24/2021
Special inspection requirement — Final
JAN PEREZ
09/24/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
09/22/2021
Special inspection requirement — Mechanical Systems
RONNY LAM
09/22/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
09/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONNY LAM
09/22/2021
Special inspection requirement — Final
JAN PEREZ
09/22/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
09/22/2021
Special inspection requirement — Air barrier — testing
RONNY LAM
09/22/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
RONNY LAM
09/22/2021
Special inspection requirement — Air barrier - visual inspection
RONNY LAM
09/22/2021
Special inspection requirement — Fenestration air leakage
RONNY LAM
09/22/2021
Special inspection requirement — Interior lighting power
RONNY LAM
09/22/2021
Special inspection requirement — Fenestration areas
RONNY LAM
09/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
RONNY LAM
09/22/2021
Special inspection requirement — Energy Code Compliance Inspections
RONNY LAM
09/22/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
RONNY LAM
09/22/2021
Special inspection requirement — HVAC-R and service water heating system controls
RONNY LAM
09/22/2021
Special inspection requirement — HVAC-R and service water heating equipment
RONNY LAM
04/27/2021
Permit issued — Plumbing
B00481619-I1-PL
04/22/2021
Permit issued — General Construction
B00481599-I1-GC
04/21/2021
Permit issued — Mechanical Systems
B00482049-I1-MS
04/16/2021
Filed — Alteration
B00482049-I1
04/16/2021
Filed — Alteration
EXISTING THREE STORY. CELLAR TO 3RD FLOOR BUILDING. PLUMBING WORK. AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00481619-I1
04/16/2021
Filed — Alteration
INTERIOR RENOVATION WITH PARTITIONS. AS PER PLANS. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B00481599-I1
04/07/2021
Violation issued (HPD, closed)
I
04/07/2021
Violation issued (HPD, closed)
A
03/16/2019
Violation issued (HPD, closed)
B
03/16/2019
Violation issued (HPD, closed)
B
03/16/2019
Violation issued (HPD, closed)
B
03/16/2019
Violation issued (HPD, closed)
B
03/16/2019
Violation issued (HPD, closed)
B
03/16/2019
Violation issued (HPD, closed)
B
11/14/2018
Violation issued (HPD, closed)
B
11/14/2018
Violation issued (HPD, closed)
B
11/14/2018
Violation issued (HPD, closed)
A
11/14/2018
Violation issued (HPD, closed)
A
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEAST ENDERS NYC INC10/21/2021
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI04/27/2021
DOB NOWGeneral ConstructionSigned-offEAST ENDERS NYC INC04/22/2021
DOB NOWMechanical SystemsSigned-offEAST ENDERS NYC INC04/21/2021
1 project · most recent 01/25/2021
General Wiring
FiledStatusContractorScope
01/25/2021CompleteROYAL ELEC'L CONTR'G CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
11/15/2021HVAC-R and service water heating equipmentRONNY LAMenergy_progress
11/15/2021Fire-Resistant Penetrations and JointsRONNY LAMspecial
11/15/2021Energy Code Compliance InspectionsRONNY LAMprogress
11/15/2021HVAC-R and service water heating system controlsRONNY LAMenergy_progress
11/15/2021HVAC-R and service water piping design and insulationRONNY LAMenergy_progress
11/10/2021HVAC-R and service water heating equipmentRONNY LAMenergy_progress
11/10/2021Fire-Resistant Penetrations and JointsRONNY LAMspecial
11/10/2021Energy Code Compliance InspectionsRONNY LAMprogress
11/10/2021HVAC-R and service water piping design and insulationRONNY LAMenergy_progress
11/10/2021HVAC-R and service water heating system controlsRONNY LAMenergy_progress
09/24/2021Mechanical SystemsRONNY LAMspecial
09/24/2021Heating SystemsRONNY LAMspecial
09/24/2021FinalJAN PEREZprogress
09/24/2021Energy Code Compliance InspectionsRONNY LAMprogress
09/22/2021Mechanical SystemsRONNY LAMspecial
09/22/2021Energy Code Compliance InspectionsRONNY LAMprogress
09/22/2021Fire-Resistant Penetrations and JointsRONNY LAMspecial
09/22/2021FinalJAN PEREZprogress
09/22/2021Energy Code Compliance InspectionsRONNY LAMprogress
09/22/2021Air barrier — testing RONNY LAMenergy_progress
09/22/2021Fenestration and door U-factor and product ratingsRONNY LAMenergy_progress
09/22/2021Air barrier - visual inspectionRONNY LAMenergy_progress
09/22/2021Fenestration air leakageRONNY LAMenergy_progress
09/22/2021Interior lighting powerRONNY LAMenergy_progress
09/22/2021Fenestration areasRONNY LAMenergy_progress
Latest 25 of 31.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00481599-I1Request digital key ↗
09/01/2026B00481599-P1Request digital key ↗
09/01/2026B00482049-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications38
▸DOB NOWProgress Inspector Seal & Signature23
09/02/2026B00481599-P1Open ↗
09/02/2026B00481599-P1Open ↗
09/02/2026B00481599-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026B00481599-P1Open ↗
09/02/2026B00482049-I1Open ↗
09/02/2026B00482049-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026B00481599-P1Open ↗
08/13/2026B00482049-I1Open ↗
08/13/2026B00481619-P3Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026B00481599-I1Open ↗
08/13/2026B00481619-P3Open ↗
08/13/2026B00481619-P1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026B00482049-I1Open ↗
08/13/2026B00481619-I1Open ↗
08/13/2026B00481599-I1Open ↗