← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Five Nine John Lofts Condominium
59 JOHN STREET · BIN 1001193
💬 Discuss this project
1909Year Built
13Stories
RMBuilding Class
C6-4Zoning
97,798 sfGross Floor Area
74Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 10,551 sf lot · 9.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsFacade and roof repairs1 filing
Site & exteriorHeavy duty sidewalk shed installation4 filings · 10 docs
Filed — no permit issuedFacade restoration and scaffold1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Wiljohn 593203/21/2026
Penn Capital Realty1603/21/2026
Five Nine John Lofts Condominium203/21/2026
59 John Operating203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG Engineering110/24/2023
Melone Architects101/12/2023
Enthink Engineers107/12/2022
NY Restoration Technology304/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arsenal Building Consultants203/21/2026
Xinos Construction603/21/2026
Boyd Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tribute Restorationspecialty_contractor307/08/2026
Elpo Electrical ContgElectrical103/22/2026
High Quality Electric ofElectrical103/22/2026
Kings Group NYScaffold107/08/2026
Phoenix Sutton STRScaffold107/08/2026
Xinos ConstructionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
George J. Xerakias, PE1658101/12/2023
Melone Architects2944101/12/2023
Building Lifecycle
All (99)Filed (7)Permit Issued (7)Signed Off (5)Facade (FISP) (15)Violation (60)Special Inspection (5)
10/02/2026
Permit issued — Suspended Scaffold
M01454329-I1-SC
09/08/2026
Filed — Alteration
Rope access installation
M01454329-I1
10/30/2024
Signed off — Alteration
Exterior repairs including select masonry facade repairs and roofing repairs as shown on drawings and as specified. No change in use, occupancy, or egress.
M08048416-I1
08/20/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00952494-I1
02/20/2024
Permit issued — General Construction
M08048416-I1-GC
10/25/2023
Permit issued — Sidewalk Shed
M00952494-I1-SH
10/24/2023
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
M00952494-I1
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/23/2023
Permit issued — General Construction
M08048416-I1-GC
01/12/2023
Filed — Alteration
Exterior repairs including select masonry facade repairs and roofing repairs as shown on drawings and as specified. No change in use, occupancy, or egress.
M08048416-I1
12/01/2022
Special inspection requirement — Tenant Protection Plan Compliance
George Xerakias
12/01/2022
Special inspection requirement — Masonry
Nicholas Melone
12/01/2022
Special inspection requirement — Final
Nicholas Melone
10/03/2022
Cycle 9 facade report signed — SWARMP
08/29/2022
Signed off — Alteration
M00773039-I1
08/21/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/20/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/29/2022
Cycle 9 facade report submitted
07/27/2022
Cycle 9 facade inspection completed
07/12/2022
Filed — Alteration
M00773039-I1
07/12/2022
Permit issued — Sidewalk Shed
M00773039-I1-SH
07/12/2022
Special inspection requirement — Final
Sunil Saigal
02/21/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/21/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/21/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/14/2020
Signed off — Alteration
supported scaffold filing as per facade repairs.
M00006651-I1
10/25/2019
Violation issued (HPD, closed)
I
07/23/2019
Signed off — Alteration
M00159186-I1
04/25/2019
Filed — Alteration
M00159186-I1
04/25/2019
Permit issued — Supported Scaffold
M00159186-I1-SF
04/11/2019
Cycle 8 facade inspection completed
03/24/2019
Cycle 8 facade report signed — SAFE
03/12/2019
Cycle 8 facade report submitted
02/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/20/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/21/2018
Cycle 8 facade report submitted
02/21/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/20/2018
Cycle 8 facade report signed — UNSAFE
02/19/2018
Cycle 8 facade inspection completed
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/21/2017
Permit issued — Supported Scaffold
M00006651-I1-SF
12/19/2017
Filed — Alteration
supported scaffold filing as per facade repairs.
M00006651-I1
12/19/2017
Special inspection requirement — Final
Hamidreza Saghari
12/15/2017
Filed — Alteration
M00002783-I1
02/09/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/09/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/20/2015
Violation issued (ECB, closed)
Construction
02/11/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/22/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/15/2012
Cycle 7 facade report submitted
08/07/2012
Cycle 7 facade inspection completed
08/07/2012
Cycle 7 facade report signed — SAFE
07/11/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2012
Violation issued (ECB, closed)
Signs
03/27/2012
Violation issued (ECB, closed)
Unknown
12/15/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 99 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedConstructed10/02/2026
DOB NOWGeneral ConstructionSigned-offTribute Restoration02/20/2024
DOB NOWSidewalk ShedSigned-offKings Group NY10/25/2023
DOB NOWGeneral ConstructionSigned-offTribute Restoration02/23/2023
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR07/12/2022
DOB NOWSupported ScaffoldSigned-offXinos Construction04/25/2019
DOB NOWSupported ScaffoldSigned-off12/21/2017
BISEQISSUEDXinos Construction07/23/2018
BISOTISSUEDXinos Construction02/21/2018
BISOTISSUEDHanjo Contractors12/13/2017
BISMHISSUEDHanjo Contractors12/13/2017
BISPLISSUEDR&A Heating & Contracting Co.i09/25/2017
BISMHISSUEDHanjo Contractors09/13/2017
BISOTISSUEDHanjo Contractors09/13/2017
BISOTISSUEDXinos Construction08/23/2017
BISEQISSUEDXinos Construction08/22/2017
BISOTISSUEDParagon Installers11/16/2015
BISPLISSUEDSuperb Plumbing & Heating05/28/2014
BISOTISSUEDJozu Terra Design12/06/2013
BISOTISSUEDEvista Group Construction11/22/2013
BISSPISSUEDActive Plumbing & Heating10/24/2013
BISOTISSUEDBCS Construction Service05/17/2012
BISSPISSUEDSunset PLGB. & Fire03/01/2012
BIS—ISSUEDSigns Cad02/10/2012
BIS—ISSUEDSigns Cad02/10/2012
BIS—ISSUEDSigns Cad02/10/2012
BISPLISSUEDAuthorized Plumbing & Heating Service11/22/2011
BISOTISSUEDUmana Designs11/10/2011
BISPLISSUEDCopper Plumbing & Heating09/27/2011
BISOTISSUEDBCS Construction Service08/03/2011
BISOTISSUEDBCS Construction Service09/23/2010
BISOTISSUEDBCS Construction Service09/24/2009
BIS—ISSUEDPrestige Interior Cleanup09/08/2009
BIS—ISSUEDM Melnick & Company10/02/2007
BISEQISSUEDAll-Safe Height12/13/2006
BISEQISSUEDAll Safe Height Construction10/04/2006
BISPLISSUEDCopper Plumbing & Heating08/08/2006
BISEQISSUEDAll-Safe Height03/31/2006
BISPLISSUEDDanica Plumbing Heat03/20/2006
BISEQISSUEDAll-Safe Height12/12/2005
+ 17 more permits on file
5 projects · most recent 12/05/2025
General Wiring
FiledStatusContractorScope
12/05/2025CompleteEmpire Lic Electrical Contractors—
07/08/2025Permit IssuedDenali Electric—
11/01/2023CompleteHigh Quality Electric of—
07/11/2022CompleteElpo Electrical Contg—
04/01/2021Permit IssuedValley Electric of NYGeneral Wiring
1 project · most recent 09/08/2026
FiledStatusContractorScope
09/08/2026Permit IssuedConstructed—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/01/2022Tenant Protection Plan ComplianceGeorge Xerakiasspecial
12/01/2022MasonryNicholas Melonespecial
12/01/2022FinalNicholas Meloneprogress
07/12/2022FinalSunil Saigalprogress
12/19/2017FinalHamidreza Saghariprogress
▾Documents — 252 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
10/04/2026M01454329-I1Request digital key ↗
09/06/2026M00006651-I1Request digital key ↗
09/02/2026M00773039-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00159186-I1Request digital key ↗
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION28
07/13/2018123121157Open ↗
03/28/2018123121157Open ↗
08/25/2017123121157Open ↗
Showing 3 of 28 on file for this type
▸BISWORK PERMIT APPLICATION25
07/30/2018140675062Open ↗
12/15/2017123121157Open ↗
12/15/2017123121157Open ↗
Showing 3 of 25 on file for this type
▸Seals & Professional Certifications58
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION34
03/11/2019123106138Open ↗
03/11/2019123106138Open ↗
11/28/2018123121157Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/05/2026M00159186-I1Open ↗
08/13/2026M00773039-I1Open ↗
08/13/2026M08048416-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
08/14/2017123106138Open ↗
11/27/2015122566151Open ↗
01/27/2012120948412Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
01/27/2012120948412Open ↗
01/27/2012120948403Open ↗
01/27/2012120948396Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/21/2017140675062Open ↗
08/14/2017123106138Open ↗
11/27/2015122566151Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/28/2026M00773039-I1Open ↗
09/02/2026M00006651-I1Open ↗
08/29/2026M08048416-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026M08048416-I1Open ↗
08/29/2026M08048416-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/21/2017140675062Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/21/2017140675062Open ↗
▸Trade Schedules & Equipment18
▸BISSELF-CERT PLUMBING NOTICE6
08/28/2014120861022Open ↗
08/16/2014121987895Open ↗
08/02/2014121987895Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
07/12/2018123121157Open ↗
03/28/2018123121157Open ↗
08/25/2017123121157Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
03/03/2014120861353Open ↗
11/26/2013120861353Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT2
11/25/2013120861353Open ↗
09/12/2017123121157Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
08/28/2014120861022Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/21/2013121396140Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes3
08/25/2017123121157Open ↗
08/14/2017123106138Open ↗
08/21/2017140675062Open ↗
▸BISSTREET TREE CHECKLIST2
04/28/2014121987895Open ↗
06/03/2013121634954Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/25/2017123121157Open ↗
08/14/2017123106138Open ↗
11/27/2015122566151Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M08048416-I1Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
03/11/2019123106138Open ↗
11/28/2018123121157Open ↗
11/28/2018123121157Open ↗
Showing 3 of 12 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
03/11/2019123106138Open ↗
11/28/2018123121157Open ↗
11/28/2018123121157Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections3
11/04/2013120861353Open ↗
07/16/2013121634954Open ↗
Showing 2 of 3 on file for this type
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/11/2019123106138Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
12/17/2012120861022Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/21/2017140675062Open ↗
▸Approvals, Objections & Sign-offs19
▸BISADMINISTRATIVE OBJECTIONS8
06/03/2013121634954Open ↗
10/12/2012121396140Open ↗
01/27/2012120948412Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
03/11/2019123106138Open ↗
11/28/2018123121157Open ↗
01/26/2016122566151Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER2
12/11/2013110379199Open ↗
11/02/2012120861022Open ↗
▸BISSHED LETTER1
07/30/2018140675062Open ↗
▸Cost, Insurance & Ownership24
▸BISCOST AFFIDAVIT22
03/11/2019123106138Open ↗
11/28/2018123121157Open ↗
08/25/2017123121157Open ↗
Showing 3 of 22 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
12/02/2015122566151Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms32
▸BISADDITIONAL INFORMATION14
07/24/2018123121157Open ↗
07/12/2018123121157Open ↗
03/30/2018123121157Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING COVER SHEET13
08/25/2017123121157Open ↗
08/25/2017123121157Open ↗
08/14/2017123106138Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM4
03/11/2019123106138Open ↗
11/28/2018123121157Open ↗
07/12/2018123121157Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/21/2017140675062Open ↗
▸Other Documents3
▸BISDepartment of Consumer Affairs (DCA) Form1
12/10/2013121634954Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
09/12/2017123121157Open ↗
▸DOB NOWIRA Certification1
10/03/2026M01454329-I1Open ↗