Two family brick
59 LEFFERTS PLACE
BROOKLYN · BIN 3340282
💬 Discuss this project
1931Year Built
3Stories
B1Building Class
R6BZoning
4,400 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family brick · 3,080 sf lot · 1.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Floor 310p · 1 filing · 20 docs
Floor 210p · 1 filing · 20 docs
Floor 113p · 2 filings · 20 docs
Cellar11p · 1 filing · 20 docs
Basement10p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/17/2021$3.6M—Private party → Private party$812/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALBANNA ENGINEERING PC308/06/2024
BARKER FREEMAN DESIGN OFFICE607/11/2024
JOEL PHAGOO P.E. PLLC203/10/2023
DANIEL R. WAPNER PE., P.C.201/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE403/21/2026
4444 PPPP CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABA INNOVATIVE BUILDERS IGeneral Contractor1207/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor403/21/2026
CARA PLUMBING GROUP INCPlumbing207/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
CASE PLUMBINGGeneral Contractor103/21/2026
DEPENDABLE MECHANICAL CORFire Protection107/08/2026
WASSERMAN STEVENGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALBANNA ENGINEERING PC2401708/06/2024
JOEL PHAGOO ,PE, PLLC2416103/10/2023
Building Lifecycle
All (95)Filed (13)Permit Issued (12)Signed Off (7)Violation (8)Inspection (11)Objection (14)Special Inspection (30)
03/10/2025
Signed off — Alteration
installation of construction fence as per plans
B08053316-I1
03/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/12/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/15/2025
Signed off — Alteration CO
Interior renovation and new rear steel deck as per plans, this A2 application is filed as a subsequent application to an A1 architectural application no B00704486-I1,
B00704486-S1
01/14/2025
Signed off — Alteration
Install new combined sprinkler system, no change to use egress or occupancy
B08029240-I1
01/14/2025
Signed off — Alteration CO
Interior renovation and new rear steel deck as per plans, this A2 application is filed as a subsequent application to an A1 architectural application no B00704486-I1,
B00704486-S3
01/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/16/2024
Signed off — Alteration CO
Interior renovation and new rear steel deck as per plans, this A2 application is filed as a subsequent application to an A1 architectural application no B00704486-I1,
B00704486-S2
12/16/2024
Permit issued — Foundation
B00704486-S3-GC-CX
11/25/2024
Permit issued — Sprinklers
B08029240-I1-PL
11/13/2024
Permit issued — Sprinklers
B08029240-I1-PL
09/10/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/03/2024
Permit issued — Mechanical Systems
B00704486-S2-MS
08/30/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/20/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/20/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/16/2024
Objection resolved — Addressed
08/12/2024
Objection raised — Structural
08/06/2024
Filed — Alteration
Install new combined sprinkler system, no change to use egress or occupancy
B08029240-P1
08/02/2024
Objection resolved — Addressed
08/02/2024
Objection resolved — Addressed
08/02/2024
Objection resolved — Addressed
08/02/2024
Objection resolved — Addressed
08/02/2024
Objection resolved — Addressed
08/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZAKI ALBANNA
08/02/2024
Special inspection requirement — Sprinkler Systems
ZAKI ALBANNA
07/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ZAKI ALBANNA
07/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEXANDRA BARKER
07/30/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEXANDRA BARKER
07/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEXANDRA BARKER
07/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXANDRA BARKER
07/30/2024
Special inspection requirement — Maintenance information
ALEXANDRA BARKER
07/29/2024
Objection resolved — Addressed
07/24/2024
Objection raised — Zoning
07/24/2024
Objection raised — Other
07/24/2024
Objection raised — Other
07/24/2024
Objection raised — Other
07/24/2024
Objection raised — Scope
07/24/2024
Objection raised — Scope
07/11/2024
Filed — Alteration CO
Interior renovation and new rear steel deck as per plans, this A2 application is filed as a subsequent application to an A1 architectural application no B00704486-I1,
B00704486-P3
07/11/2024
Filed — Alteration CO
Interior renovation and new rear steel deck as per plans, this A2 application is filed as a subsequent application to an A1 architectural application no B00704486-I1,
B00704486-P2
07/11/2024
Special inspection requirement — Underpinning
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Subgrade Inspections
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Final
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Footing and Foundation
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Insulation placement and R values
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Joseph Bizarroque
07/10/2024
Special inspection requirement — Concrete - Cast-In-Place
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Masonry
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Structural Cold-Formed Steel
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Structural Steel - Details
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Structural Steel - High Strength Bolting
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Structural Steel - Welding
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Energy Code Compliance Inspections
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Fire-Resistance Rated Construction
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
ZAKI ALBANNA
07/10/2024
Special inspection requirement — Insulation placement and R values
ZAKI ALBANNA
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offABA INNOVATIVE BUILDERS I12/16/2024
DOB NOWSprinklersSigned-offPRIME PLMBG & HTG OF NY11/25/2024
DOB NOWSprinklersSigned-offA&H EXPRESS PLBG&HTG CORP11/13/2024
DOB NOWMechanical SystemsSigned-offABA INNOVATIVE BUILDERS I09/03/2024
DOB NOWConstruction FenceSigned-offABA INNOVATIVE BUILDERS I01/16/2024
DOB NOWGeneral ConstructionPermit IssuedABA INNOVATIVE BUILDERS I12/27/2023
DOB NOWSprinklersSigned-offDEPENDABLE MECHANICAL COR09/25/2023
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY06/30/2023
DOB NOWSupported ScaffoldSigned-offAKM CONSTRUCTION NY03/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offAKM CONSTRUCTION NY03/10/2023
DOB NOWGeneral ConstructionPermit IssuedABA INNOVATIVE BUILDERS I12/29/2022
DOB NOWConstruction FenceSigned-offABA INNOVATIVE BUILDERS I12/27/2022
BISOTISSUEDBROOKLYN SOLARWORKS LLC07/19/2023
BISPLISSUEDALADDIN PLG & HTG06/17/1994
BIS—ISSUEDRUSS MAYDAN CO.06/07/1994
2 projects · most recent 08/10/2023
General Wiring
FiledStatusContractorScope
08/10/2023CompleteBROOKYLN SOLARWORKS, LLC—
04/04/2023CompleteFIRST STAR ELECTRIC INCGeneral Wiring
1 project · most recent 07/11/2024
Steel Concrete Wood
FiledStatusContractorScope
07/11/2024Signed-offABA INNOVATIVE BUILDERS ISteel, Concrete, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
03/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/12/2025Fail-Final CND-Occupancy InspectionFailView ↗
01/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/30/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/20/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/15/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/17/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
08/02/2024Fire-Resistant Penetrations and JointsZAKI ALBANNAspecial
08/02/2024Sprinkler SystemsZAKI ALBANNAspecial
07/31/2024Structural Stability – Alterations of existing buildingsZAKI ALBANNAspecial
07/30/2024HVAC-R and service water heating equipmentALEXANDRA BARKERenergy_progress
07/30/2024Energy Code Compliance InspectionsALEXANDRA BARKERprogress
07/30/2024HVAC-R and service water heating system controlsALEXANDRA BARKERenergy_progress
07/30/2024HVAC-R and service water piping design and insulationALEXANDRA BARKERenergy_progress
07/30/2024Maintenance informationALEXANDRA BARKERenergy_progress
07/11/2024UnderpinningZAKI ALBANNAspecial
07/10/2024Subgrade InspectionsZAKI ALBANNAspecial
07/10/2024FinalZAKI ALBANNAprogress
07/10/2024Footing and FoundationZAKI ALBANNAprogress
07/10/2024Insulation placement and R valuesZAKI ALBANNAenergy_progress
07/10/2024Subsurface Investigations (Borings/Test Pits)Joseph Bizarroquespecial
07/10/2024Concrete - Cast-In-PlaceZAKI ALBANNAspecial
07/10/2024Fire-Resistant Penetrations and JointsZAKI ALBANNAspecial
07/10/2024MasonryZAKI ALBANNAspecial
07/10/2024Structural Cold-Formed SteelZAKI ALBANNAspecial
07/10/2024Structural Stability – Alterations of existing buildingsZAKI ALBANNAspecial
07/10/2024Structural Steel - DetailsZAKI ALBANNAspecial
07/10/2024Structural Steel - High Strength BoltingZAKI ALBANNAspecial
07/10/2024Structural Steel - WeldingZAKI ALBANNAspecial
07/10/2024Energy Code Compliance InspectionsZAKI ALBANNAprogress
07/10/2024Fire-Resistance Rated ConstructionZAKI ALBANNAprogress
07/10/2024Fenestration and door U-factor and product ratingsZAKI ALBANNAenergy_progress
Latest 25 of 44.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/29/2026B00704486-S2Request digital key ↗
08/29/2026B00704486-I1Request digital key ↗
08/29/2026B00704486-P2Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
07/18/2023340893867Open ↗
▸BISWORK PERMIT APPLICATION1
07/19/2023340893867Open ↗
▸Seals & Professional Certifications43
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026B00704486-P2Open ↗
09/02/2026B00704486-P2Open ↗
09/02/2026B00704486-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/29/2026B00704486-S2Open ↗
08/29/2026B00704486-S1Open ↗
08/29/2026B00704486-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026B00704486-P2Open ↗
09/02/2026B00704486-P2Open ↗
08/27/2026B00840405-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/18/2023340893867Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/18/2023340893867Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/29/2026B00704486-I1Open ↗
08/29/2026B00704486-P2Open ↗
08/29/2026B00704486-S3Open ↗
Showing 3 of 4 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
07/19/2023340893867Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00704486-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00704486-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/29/2026B00704486-S2Open ↗
08/29/2026B00704486-S1Open ↗
08/29/2026B00704486-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/18/2023340893867Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/12/2023340893867Open ↗
07/18/2023340893867Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/18/2023340893867Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
10/13/2023340893867Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
07/18/2023340893867Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/12/2023340893867Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00704486-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
10/12/2023340893867Open ↗
07/18/2023340893867Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B00704486-P3Open ↗
08/13/2026B00704486-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00704486-S3Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/13/2023340893867Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/13/2023340893867Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/12/2023340893867Open ↗
07/18/2023340893867Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/18/2023340893867Open ↗
▸Other Documents11
▸DOB NOWDHCR Document8
08/13/2026B00704486-P2Open ↗
08/13/2026B00704486-I1Open ↗
08/13/2026B00704486-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProperty Ownership Certification2
08/29/2026B00704486-I1Open ↗
08/29/2026B00704486-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00704486-I1Open ↗