← Back
Walk-up cooperative
59 MONTGOMERY PLACE
BROOKLYN · BIN 3024969
💬 Discuss this project
1893Year Built
4Stories
C6Building Class
R8XZoning
6,142 sfGross Floor Area
8Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 59 MONTGOMERY BROWNSTONE CORP · 2,070 sf lot · 2.97 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
59 MONTGOMERY BROWNSTONE CORP.1407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.312/23/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BELL FUEL OIL, LLCPlumbing407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851112/23/2020
Building Lifecycle
All (34)Filed (3)Permit Issued (4)Signed Off (2)Violation (13)Special Inspection (12)
05/05/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, closed)
I
06/10/2025
Violation issued (HPD, open)
A
04/11/2024
Violation issued (HPD, closed)
A
03/24/2023
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
02/08/2022
Signed off — Alteration
REPLACE GAS PIPING FROM EXISTING GAS METER TO REPLACMENT BOILER/BURNER AND REGISTER (2) GAS FIRED HOT WATER HEATERS
B00425794-S2
02/08/2022
Signed off — Alteration
REPLACE GAS PIPING FROM EXISTING GAS METER TO REPLACMENT BOILER/BURNER AND REGISTER (2) GAS FIRED HOT WATER HEATERS
B00425794-I1
01/28/2022
Permit issued — Plumbing
B00425794-I1-PL
12/28/2021
Permit issued — Boiler Equipment
B00425794-S2-BE
04/12/2021
Violation issued (HPD, closed)
A
12/24/2020
Permit issued — Boiler Equipment
B00425794-S2-BE
12/23/2020
Filed — Alteration
REPLACE GAS PIPING FROM EXISTING GAS METER TO REPLACMENT BOILER/BURNER AND REGISTER (2) GAS FIRED HOT WATER HEATERS
B00425794-S2
12/23/2020
Filed — Alteration
REPLACE GAS PIPING FROM EXISTING GAS METER TO REPLACMENT BOILER/BURNER AND REGISTER (2) GAS FIRED HOT WATER HEATERS
B00425794-P1
12/23/2020
Special inspection requirement — Maintenance information
LOUIS ARENA
12/23/2020
Special inspection requirement — HVAC insulation and sealing
LOUIS ARENA
12/23/2020
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
12/23/2020
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
11/23/2020
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
11/23/2020
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
11/23/2020
Special inspection requirement — HVAC insulation and sealing
LOUIS ARENA
11/23/2020
Special inspection requirement — Maintenance information
LOUIS ARENA
11/20/2020
Special inspection requirement — Maintenance information
LOUIS ARENA
11/20/2020
Special inspection requirement — HVAC and service water heating system controls
LOUIS ARENA
11/20/2020
Special inspection requirement — HVAC and service water heating equipment
LOUIS ARENA
11/20/2020
Special inspection requirement — Heating Systems
LOUIS ARENA
11/19/2020
Permit issued — Plumbing
B00425794-I1-PL
11/18/2020
Filed — Alteration
REPLACE GAS PIPING FROM EXISTING GAS METER TO REPLACMENT BOILER/BURNER AND REGISTER (2) GAS FIRED HOT WATER HEATERS
B00425794-I1
10/30/2019
Violation issued (HPD, closed)
I
10/18/2018
Violation issued (HPD, closed)
I
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC01/28/2022
DOB NOWBoiler EquipmentSigned-offAPPROVED ENERGY LLC12/28/2021
DOB NOWBoiler EquipmentSigned-offAPPROVED ENERGY LLC12/24/2020
DOB NOWPlumbingSigned-offAPPROVED ENERGY LLC11/19/2020
BISPLISSUEDNASTASI PLBG & HTG INC03/23/2004
BISOTISSUEDJ'S CUSTOM CONTRACTING IN03/15/2004
BISPLISSUEDNASTASI PLBG & HTG INC11/05/2003
BISOTISSUEDJ'S CUSTOM CONTRACTING IN11/21/2001
BISPLISSUEDNASTASI PLBG & HTG INC04/30/1998
BISOTISSUEDJ'S CUSTOM CONTRACTING IN04/23/1998
BISPLISSUEDMARTIN PLG & HTG INC02/27/1997
BIS—ISSUEDJ'S CUSTOM CONTRACTING08/23/1996
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/23/2020Maintenance informationLOUIS ARENAenergy_progress
12/23/2020HVAC insulation and sealing LOUIS ARENAenergy_progress
12/23/2020HVAC and service water heating system controls LOUIS ARENAenergy_progress
12/23/2020Energy Code Compliance InspectionsLOUIS ARENAprogress
11/23/2020Energy Code Compliance InspectionsLOUIS ARENAprogress
11/23/2020HVAC and service water heating system controls LOUIS ARENAenergy_progress
11/23/2020HVAC insulation and sealing LOUIS ARENAenergy_progress
11/23/2020Maintenance informationLOUIS ARENAenergy_progress
11/20/2020Maintenance informationLOUIS ARENAenergy_progress
11/20/2020HVAC and service water heating system controls LOUIS ARENAenergy_progress
11/20/2020HVAC and service water heating equipment LOUIS ARENAenergy_progress
11/20/2020Heating SystemsLOUIS ARENAspecial
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00425794-I1Request digital key ↗
09/02/2026B00425794-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/02/2026B00425794-S2Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
09/02/2026B00425794-I1Open ↗
09/02/2026B00425794-P1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026B00425794-S2Open ↗
09/23/2026B00425794-S2Open ↗
09/23/2026B00425794-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/02/2026B00425794-S2Open ↗
09/02/2026B00425794-I1Open ↗
09/02/2026B00425794-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026B00425794-S2Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan3
09/02/2026B00425794-I1Open ↗
09/02/2026B00425794-S2Open ↗
09/02/2026B00425794-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026B00425794-I1Open ↗
09/02/2026B00425794-P1Open ↗
09/02/2026B00425794-S2Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
09/02/2026B00425794-S2Open ↗