← Back
BuildNYC
Two stories - detached, small or mid-size
59 NORWALK AVENUE
STATEN ISLAND · BIN 5103937
💬 Discuss this project
1991Year Built
3Stories
A1Building Class
R3-1Zoning
2,340 sfGross Floor Area
1Units
2 Active Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,140 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
Floor 3Under Construction7p · 1 filing · 20 docs
Floor 2Under Construction8p · 1 filing · 20 docs
Floor 1Under Construction8p · 1 filing · 20 docs
Site & exteriorUnder Construction5p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chris Ponisi, Architect610/28/2026
A Tech Engineering NYC205/07/2026
Alpha Engineering102/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dawn Ponisi203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Zaim ContractorGeneral Contractor209/16/2026
West Shore ConsultingPlumbing207/08/2026
United Industries & ConstructionGeneral Contractor109/18/2026
Green Apple ConstructionScaffold104/09/2026
Zaim ContractorScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738410/28/2026
Building Lifecycle
10/28/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Application filed to reconstruct existing building due to fire damage and convert to two families.
S01370314-P3
10/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
10/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
10/28/2026
Special inspection requirement — Maintenance information
anthony santoro
10/28/2026
Special inspection requirement — Metering
anthony santoro
62 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offZaim Contractor09/15/2026
DOB NOWPlumbingPermit IssuedWest Shore Consulting05/15/2026
DOB NOWPlumbingPermit IssuedWest Shore Consulting04/30/2026
DOB NOWStructuralPermit IssuedZaim Contractor04/22/2026
DOB NOWConstruction FencePermit IssuedZaim Contractor04/22/2026
DOB NOWConstruction FencePermit IssuedGreen Apple Construction02/03/2026
DOB NOWFull DemolitionSigned-offUnited Industries & Construction—
1 project · most recent 10/28/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
10/28/2026Permit IssuedDemerac Plumbing & HeatingGas, Plumbing-Sprinkler, Water/Sanitary
2 projects · most recent 06/24/2026
General Wiring
FiledStatusContractorScope
06/24/2026Permit IssuedA & R Electrical ContractingGeneral Wiring
03/25/2026Permit IssuedPremier Electrical Contractors—
1 project · most recent 10/28/2026
Wood
FiledStatusContractorScope
10/28/2026Permit IssuedDemerac Plumbing & HeatingWood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/09/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
07/07/2026Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
07/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
10/28/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
10/28/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
10/28/2026Maintenance informationanthony santoroenergy_progress
10/28/2026Meteringanthony santoroenergy_progress
10/28/2026Permanent certificateanthony santoroenergy_progress
10/28/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
10/28/2026Energy Code Compliance Inspectionsanthony santoroprogress
09/15/2026Energy Code Compliance Inspectionsanthony santoroprogress
09/15/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
09/15/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
09/15/2026Meteringanthony santoroenergy_progress
09/15/2026Permanent certificateanthony santoroenergy_progress
09/15/2026Maintenance informationanthony santoroenergy_progress
09/15/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
05/01/2026Shutoff dampers—energy_progress
05/01/2026Maintenance information—energy_progress
04/30/2026HVAC-R and service water heating equipment—energy_progress
04/30/2026HVAC-R and service water piping design and insulation—energy_progress
04/30/2026Ventilation and air distribution system—energy_progress
04/30/2026HVAC-R and service water heating system controls—energy_progress
04/08/2026Mechanical Systems—special
04/08/2026Final—progress
03/11/2026Electric vehicle service equipment requirementsanthony santoroenergy_progress
03/11/2026Fenestration air leakageanthony santoroenergy_progress
03/11/2026Air barrier — testing anthony santoroenergy_progress
Latest 25 of 38.
38 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account