← Back
Zoned residential, not Manhattan
59 PARK PLACE
STATEN ISLAND · BIN 5175225
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R2Zoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Zoned residential, not Manhattan · 7,516 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Roof2p · 1 filing · 10 docs
Floor 34p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
I E BUILDER2207/08/2026
IE IE BUILDER103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SQUARE ARCH, LLC212/06/2024
STANLEY M. KREBUSHEVSKI, R.A.603/13/2023
A TECH ENGINEERING NYC, PLLC.107/06/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KAMTECH RESTORATION CORP403/21/2026
LARGIME MUJOVIC303/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IE BUILDERGeneral Contractor707/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
MARTIN DORKINElectrical103/22/2026
KAMTECH RESTORATION CORPGeneral Contractor104/09/2026
K.M.D MECHANICAL 1443 LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802212/06/2024
A TECH ENGINEERING NYC, P6738403/13/2023
Building Lifecycle
All (78)Filed (9)Permit Issued (9)Signed Off (5)Violation (8)Inspection (11)Objection (6)Special Inspection (30)
01/22/2025
Signed off — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
S01130019-I1
12/06/2024
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
S01130019-P1
12/06/2024
Special inspection requirement — Final
Kaijin Liang
12/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
12/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kaijin Liang
12/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
12/06/2024
Special inspection requirement — Air barrier - visual inspection
Kaijin Liang
10/25/2024
Permit issued — Solar
S01130019-I1-SL
10/21/2024
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
S01130019-I1
01/18/2024
Signed off — New Building
Construction fence filed in conjunction with NB application S00620407
S00620407-S4
01/17/2024
Signed off — New Building
Construction fence filed in conjunction with NB application S00620407
S00620407-S3
01/16/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
01/10/2024
Signed off — Alteration
S00711165-I1
01/08/2024
Signed off — New Building
Construction fence filed in conjunction with NB application S00620407
S00620407-S1
07/18/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/25/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/23/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/17/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
04/17/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
03/29/2023
Special inspection requirement — Final
anthony santoro
03/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
03/29/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
anthony santoro
03/29/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
03/29/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/29/2023
Special inspection requirement — Subgrade Inspections
anthony santoro
03/29/2023
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/29/2023
Special inspection requirement — Structural Wood Frame
anthony santoro
03/29/2023
Special inspection requirement — Footing and Foundation
anthony santoro
03/29/2023
Special inspection requirement — Insulation placement and R values
anthony santoro
03/29/2023
Special inspection requirement — Air barrier — testing
anthony santoro
03/29/2023
Special inspection requirement — Air barrier - visual inspection
anthony santoro
03/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/29/2023
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
03/29/2023
Special inspection requirement — Interior lighting power
anthony santoro
03/29/2023
Special inspection requirement — Fenestration air leakage
anthony santoro
03/29/2023
Special inspection requirement — Fenestration areas
anthony santoro
03/29/2023
Special inspection requirement — Permanent certificate
anthony santoro
03/29/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
03/29/2023
Special inspection requirement — Maintenance information
anthony santoro
03/29/2023
Special inspection requirement — Metering
anthony santoro
03/13/2023
Filed — New Building
Construction fence filed in conjunction with NB application S00620407
S00620407-P2
03/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
03/10/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/10/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
anthony santoro
03/08/2023
Filed — New Building
Construction fence filed in conjunction with NB application S00620407
S00620407-P1
03/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/20/2023
Permit issued — Curb Cut
S00620407-S4-CC
12/22/2022
Permit issued — Plumbing
S00711165-I1-PL
12/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/28/2022
Violation issued (ECB, closed)
Construction
11/28/2022
Violation issued (ECB, closed)
Construction
11/28/2022
Violation issued (ECB, closed)
Construction
11/26/2022
Violation issued (ECB, closed)
Construction
09/29/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/28/2022
Violation issued (ECB, closed)
Construction
09/28/2022
Violation issued (ECB, closed)
Construction
09/28/2022
Violation issued (ECB, closed)
Construction
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offKAMTECH RESTORATION CORP10/25/2024
DOB NOWCurb CutSigned-offIE BUILDER01/20/2023
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR12/22/2022
DOB NOWConstruction FenceSigned-offIE BUILDER09/27/2022
DOB NOWFoundationPermit IssuedIE BUILDER09/27/2022
DOB NOWPlumbingSigned-offK.M.D MECHANICAL 1443 LLC09/21/2022
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR09/14/2022
DOB NOWStructuralPermit IssuedIE BUILDER07/28/2022
DOB NOWConstruction FenceSigned-offIE BUILDER07/26/2022
1 project · most recent 03/13/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/13/2023Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
2 projects · most recent 10/17/2024
General Wiring
FiledStatusContractorScope
10/17/2024CompleteBERGER QUALITY ELEC'L CON—
10/11/2022CompleteMARTIN DORKINGeneral Wiring
1 project · most recent 03/13/2023
Wood
FiledStatusContractorScope
03/13/2023Signed-offIE BUILDERWood
1 project · most recent 03/13/2023
Fence
FiledStatusContractorScope
03/13/2023Signed-offIE BUILDERFence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/16/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/05/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/25/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/23/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/17/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
04/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/29/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
12/06/2024FinalKaijin Liangprogress
12/06/2024Energy Code Compliance InspectionsKaijin Liangprogress
12/06/2024Structural Stability – Alterations of existing buildingsKaijin Liangspecial
12/06/2024Fire-Resistant Penetrations and JointsKaijin Liangspecial
12/06/2024Air barrier - visual inspectionKaijin Liangenergy_progress
03/29/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
03/29/2023Finalanthony santoroprogress
03/29/2023Fire-Resistance Rated Constructionanthony santoroprogress
03/29/2023Exterior Insulation and Finish Systems (EIFS)anthony santorospecial
03/29/2023Concrete - Cast-In-Placeanthony santorospecial
03/29/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
03/29/2023Subgrade Inspectionsanthony santorospecial
03/29/2023Energy Code Compliance Inspectionsanthony santoroprogress
03/29/2023Structural Wood Frameanthony santoroprogress
03/29/2023Footing and Foundationanthony santoroprogress
03/29/2023Insulation placement and R valuesanthony santoroenergy_progress
03/29/2023Air barrier — testing anthony santoroenergy_progress
03/29/2023Air barrier - visual inspectionanthony santoroenergy_progress
03/29/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
03/29/2023Electric vehicle service equipment requirementsanthony santoroenergy_progress
03/29/2023Interior lighting poweranthony santoroenergy_progress
03/29/2023Fenestration air leakageanthony santoroenergy_progress
03/29/2023Fenestration areasanthony santoroenergy_progress
03/29/2023Permanent certificateanthony santoroenergy_progress
03/29/2023Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
Latest 25 of 55.
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026S00620407-S1Request digital key ↗
08/23/2026S00620407-S3Request digital key ↗
08/23/2026S00620407-S4Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
11/19/2021540206105Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
11/19/2021540206105Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWRestrictive Declaration/Easement 16
08/13/2026S00620407-P2Open ↗
08/13/2026S00620407-I1Open ↗
08/13/2026S00620407-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00620407-I1Open ↗
08/13/2026S00620407-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00620407-I1Open ↗
08/13/2026S00620407-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00620407-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026S01130019-P1Open ↗
09/01/2026S01130019-P1Open ↗
08/31/2026S00620407-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026S01130019-P1Open ↗
09/01/2026S01130019-P1Open ↗
09/01/2026S01130019-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026S00620407-P1Open ↗
08/23/2026S00620407-I1Open ↗
08/23/2026S00620407-S1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/19/2021540206105Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/19/2021540206105Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00620407-P2Open ↗
08/13/2026S00620407-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist2
08/13/2026S00620407-I1Open ↗
08/13/2026S00620407-P2Open ↗
▸BISSTREET TREE CHECKLIST1
11/19/2021540206105Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00620407-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00620407-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00620407-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00620407-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/13/2026S00620407-S1Open ↗
08/13/2026S00620407-P2Open ↗
08/13/2026S00620407-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00620407-S1Open ↗
08/13/2026S00620407-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
11/19/2021540206105Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00620407-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
11/19/2021540206105Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01130019-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
11/19/2021540206105Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/13/2026S00620407-I1Open ↗
08/13/2026S00620407-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00620407-P2Open ↗
08/13/2026S00620407-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026S00620407-P2Open ↗
08/15/2026S00620407-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/19/2021540206105Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00620407-I1Open ↗