← Back
BuildNYC
Two family brick
59 SOUTH 3RD STREET
BROOKLYN · BIN 3063083
💬 Discuss this project
1899Year Built
5Stories
B1Building Class
R6Zoning
4,169 sfGross Floor Area
2Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Two family brick · Owner of record: Brooklyn Five Nine · 1,900 sf lot · 2.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof83p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 483p · 1 filing · 20 docs
Floor 383p · 1 filing · 20 docs
Floor 286p · 1 filing · 20 docs
Floor 183p · 1 filing · 20 docs
Cellar85p · 1 filing · 20 docs
Basement84p · 1 filing · 20 docs
Site & exteriorSidewalk shed repair, use, and removal13p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Brooklyn Five Nine103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/23/2022$4.0M—Private party → Private party$959/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Danico Services1003/21/2026
BMB Building Consulting3203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RYL GroupGeneral Contractor1307/08/2026
Lakhi General ContractorScaffold507/08/2026
Go Greener PlumbingPlumbing407/08/2026
Omd ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Delta Testing Labs6871910/22/2025
Building Lifecycle
All (171)Filed (21)Permit Issued (20)Signed Off (9)Violation (5)Inspection (6)Objection (80)Special Inspection (30)
07/31/2026
Signed off — Alteration CO
Propose installation of new sprinkler heads for the interior renovation of cellar to 4th floor with 60 new sprinkler heads filed in conjunction with Alt-CO-GC # B00797719-I1.
B00797719-I1
05/05/2026
Violation issued (HPD, closed)
A
02/12/2026
Signed off — Alteration CO
Propose installation of new sprinkler heads for the interior renovation of cellar to 4th floor with 60 new sprinkler heads filed in conjunction with Alt-CO-GC # B00797719-I1.
B00797719-S5
02/12/2026
Signed off — Alteration CO
Propose installation of new sprinkler heads for the interior renovation of cellar to 4th floor with 60 new sprinkler heads filed in conjunction with Alt-CO-GC # B00797719-I1.
B00797719-S6
02/12/2026
Signed off — Alteration CO
Propose installation of new sprinkler heads for the interior renovation of cellar to 4th floor with 60 new sprinkler heads filed in conjunction with Alt-CO-GC # B00797719-I1.
B00797719-S4
12/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/09/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.SIDEWALK SHED FILED ON A SEPARATE APPLICATION.
B00943260-I1
12/09/2025
Signed off — Alteration
HEAVY DUTY SWS IN ORDER FOR VERTICAL ENLARGEMENT UNDER JOB #B00797719-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SWS SHALL COMPLY WITH CH 33 OF THE NYC BUILDING CODE.
B01001522-I1
11/14/2025
Signed off — Alteration CO
Propose installation of new sprinkler heads for the interior renovation of cellar to 4th floor with 60 new sprinkler heads filed in conjunction with Alt-CO-GC # B00797719-I1.
B00797719-S3
11/14/2025
Signed off — Alteration CO
Propose installation of new sprinkler heads for the interior renovation of cellar to 4th floor with 60 new sprinkler heads filed in conjunction with Alt-CO-GC # B00797719-I1.
B00797719-S1
11/14/2025
Signed off — Alteration CO
Propose installation of new sprinkler heads for the interior renovation of cellar to 4th floor with 60 new sprinkler heads filed in conjunction with Alt-CO-GC # B00797719-I1.
B00797719-S2
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
10/30/2025
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
10/22/2025
Filed — Alteration CO
Propose installation of new sprinkler heads for the interior renovation of cellar to 4th floor with 60 new sprinkler heads filed in conjunction with Alt-CO-GC # B00797719-I1.
B00797719-A3
10/10/2025
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
10/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
09/18/2025
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
09/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
09/18/2025
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
09/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
09/18/2025
Special inspection requirement — Duct leakage testing, insulation and design
RICHARD GREENWALD
09/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
09/18/2025
Special inspection requirement — Maintenance information
RICHARD GREENWALD
09/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
09/18/2025
Special inspection requirement — Shutoff dampers
RICHARD GREENWALD
09/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
09/18/2025
Special inspection requirement — Final
RICHARD GREENWALD
09/09/2025
Filed — Alteration CO
Propose installation of new sprinkler heads for the interior renovation of cellar to 4th floor with 60 new sprinkler heads filed in conjunction with Alt-CO-GC # B00797719-I1.
B00797719-A2
09/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
09/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
09/05/2025
Special inspection requirement — Shutoff dampers
09/05/2025
Special inspection requirement — Duct leakage testing, insulation and design
09/05/2025
Special inspection requirement — Final
RICHARD GREENWALD
09/05/2025
Special inspection requirement — Maintenance information
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
RICHARD GREENWALD
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
09/05/2025
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
08/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
08/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
08/06/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/30/2025
Objection resolved — Addressed
07/21/2025
Filed — Alteration CO
Propose installation of new sprinkler heads for the interior renovation of cellar to 4th floor with 60 new sprinkler heads filed in conjunction with Alt-CO-GC # B00797719-I1.
B00797719-A1
07/18/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
07/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
07/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
07/11/2025
Objection raised — Other
07/11/2025
Objection resolved — Addressed
07/11/2025
Objection resolved — Addressed
07/10/2025
Objection raised — Other
07/10/2025
Objection raised — Other
06/24/2025
Filed — Alteration CO
Propose installation of new sprinkler heads for the interior renovation of cellar to 4th floor with 60 new sprinkler heads filed in conjunction with Alt-CO-GC # B00797719-I1.
B00797719-P9
06/20/2025
Objection raised — Other
06/20/2025
Objection raised — Other
06/02/2025
Filed — Alteration CO
Propose installation of new sprinkler heads for the interior renovation of cellar to 4th floor with 60 new sprinkler heads filed in conjunction with Alt-CO-GC # B00797719-I1.
B00797719-P5
05/21/2025
Permit issued — General Construction
B00797719-I1-GC
05/21/2025
Permit issued — Plumbing
B00797719-S5-PL
05/21/2025
Permit issued — Sprinklers
B00797719-S6-EW-SP
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRYL Group05/21/2025
DOB NOWPlumbingSigned-offGo Greener Plumbing05/21/2025
DOB NOWSprinklersSigned-offGo Greener Plumbing05/21/2025
DOB NOWSidewalk ShedSigned-offLakhi General Contractor02/19/2025
DOB NOWSupported ScaffoldSigned-offLakhi General Contractor11/14/2024
DOB NOWGeneral ConstructionPermit IssuedRYL Group07/30/2024
DOB NOWFoundationSigned-offRYL Group07/22/2024
DOB NOWStructuralSigned-offRYL Group07/18/2024
DOB NOWFoundationSigned-offRYL Group07/18/2024
DOB NOWMechanical SystemsSigned-offRYL Group07/18/2024
DOB NOWPlumbingSigned-offGo Greener Plumbing05/08/2024
DOB NOWSprinklersSigned-offGo Greener Plumbing05/07/2024
DOB NOWSidewalk ShedSigned-offLakhi General Contractor02/07/2024
DOB NOWSupported ScaffoldSigned-offLakhi General Contractor11/13/2023
DOB NOWSidewalk ShedPermit IssuedLakhi General Contractor10/25/2023
DOB NOWFoundationSigned-offRYL Group08/17/2023
DOB NOWGeneral ConstructionPermit IssuedRYL Group08/17/2023
DOB NOWStructuralSigned-offRYL Group08/17/2023
DOB NOWFoundationSigned-offRYL Group08/15/2023
DOB NOWMechanical SystemsSigned-offRYL Group08/14/2023
BISEQISSUEDS S Bridging & Scaffoldin05/10/2013
1 project · most recent 10/22/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/22/2025Permit IssuedRYL GroupHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ2 42,000 BTU · Vrf Outdoor ×3
MXZ-SM48NAMHZ2 48,000 BTU · Vrf Outdoor ×3
PUHY-HP72TNU-A 72,000 BTU · Vrf Outdoor ×3
1 project · most recent 10/22/2025
Sprinkler System
FiledStatusContractorScope
10/22/2025——Sprinkler System
1 project · most recent 10/22/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/22/2025Signed-offGo Greener PlumbingGas, Storm, Water/Sanitary
3 projects · most recent 07/04/2024
General Wiring
FiledStatusContractorScope
07/04/2024CompleteOmd Electrical2 meters, 2 new_meters
06/06/2024CompleteSupreme ElectricGeneral Wiring
11/14/2023CompleteK.N.C. Electric—
1 project · most recent 10/22/2025
Steel Concrete Masonry Wood
FiledStatusContractorScope
10/22/2025Signed-offGo Greener PlumbingSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/05/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
10/30/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
10/30/2025Sprinkler SystemsRICHARD GREENWALDspecial
10/10/2025Sprinkler SystemsRICHARD GREENWALDspecial
10/10/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
09/18/2025Duct leakage testing, insulation and designRICHARD GREENWALDenergy_progress
09/18/2025HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
09/18/2025HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
09/18/2025Shutoff dampersRICHARD GREENWALDenergy_progress
09/18/2025Maintenance informationRICHARD GREENWALDenergy_progress
09/18/2025Energy Code Compliance InspectionsRICHARD GREENWALDprogress
09/18/2025FinalRICHARD GREENWALDprogress
09/18/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
09/18/2025Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
09/18/2025Mechanical SystemsRICHARD GREENWALDspecial
09/18/2025HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
09/05/2025Energy Code Compliance InspectionsRICHARD GREENWALDprogress
09/05/2025Shutoff dampers—energy_progress
09/05/2025HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
09/05/2025HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
09/05/2025HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
09/05/2025Maintenance information—energy_progress
09/05/2025Duct leakage testing, insulation and design—energy_progress
09/05/2025Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
09/05/2025Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
09/05/2025Mechanical SystemsRICHARD GREENWALDspecial
Latest 25 of 83.
▾Documents — 175 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
08/28/2026B00797719-A3Request digital key ↗
08/28/2026B00797719-A2Request digital key ↗
08/28/2026B00797719-A1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
01/03/2022320761626Open ↗
05/13/2013320761626Open ↗
▸BISWORK PERMIT APPLICATION1
05/13/2013320761626Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00797719-P1Open ↗
08/13/2026B00797719-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00797719-I1Open ↗
▸Seals & Professional Certifications104
▸DOB NOWSpecial Inspector Seal & Signature47
10/08/2026B00797719-S3Open ↗
10/08/2026B00797719-S3Open ↗
10/08/2026B00797719-S3Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
10/08/2026B00797719-S3Open ↗
10/08/2026B00797719-S3Open ↗
10/01/2026B00797719-S5Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/28/2026B00797719-I1Open ↗
08/28/2026B00797719-A3Open ↗
08/28/2026B00797719-A2Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/13/2013320761626Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/13/2013320761626Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/13/2013320761626Open ↗
▸Safety & Tenant Protection15
▸DOB NOWHPD-1: Anti-Harassment Area Checklist13
08/13/2026B00951374-I1Open ↗
08/13/2026B00943260-P2Open ↗
08/13/2026B00797719-P5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWStreet Tree Checklist2
08/28/2026B00797719-P1Open ↗
08/15/2026B00797719-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/28/2026B00797719-S6Open ↗
08/28/2026B00797719-S5Open ↗
08/28/2026B00797719-S4Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00797719-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/13/2026B00797719-P4Open ↗
08/13/2026B00797719-P3Open ↗
08/13/2026B00797719-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00797719-S3Open ↗
08/13/2026B00797719-S2Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
05/13/2013320761626Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/13/2013320761626Open ↗
▸Other Documents13
▸DOB NOWPlot Diagram6
08/13/2026B00797719-I1Open ↗
08/13/2026B00797719-P1Open ↗
08/13/2026B00797719-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial2
08/13/2026B00797719-I1Open ↗
08/13/2026B00797719-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00797719-P1Open ↗
08/13/2026B00797719-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/28/2026B00797719-P1Open ↗
08/15/2026B00797719-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00797719-I1Open ↗