1890Year Built
6Stories
D0Building Class
M1-5/R7XZoning
43,500 sfGross Floor Area
13Units
LL97 CoveredRent Stabilized9 Open Violations 8 unresolved · 1 paperwork only ▸
Elevator co-op, conversion from loft/warehouse · Owner of record: 59 WOOSTER ST CORP · 7,500 sf lot · 5.8 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof2p · 3 filings · 20 docs
Floor 2Under Construction12p · 2 filings · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIEBERMAN HOLDINGS2709/16/2026
PLATINUM SERVICES NY807/08/2026
ALL EMPIRE BUILDING CONTRACTORS404/09/2026
59 WOOSTE STREET CORP3503/22/2026
59 WOOSTER803/21/2026
COLGATE ENTERPRISE203/21/2026
PRESIDENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.1203/21/2026
59 WOOSTER403/21/2026
HLZAE103/21/2026
SHEIKH EXPEDITING203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANHATTAN D ENTERPRISESGeneral Contractor707/08/2026
HI-TECH RESTORATION CORPGeneral Contractor707/08/2026
TRADITIONAL WATERPROOFINGGeneral Contractor407/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
URBAN INTELLIGENCE, INCGeneral Contractor303/21/2026
BAYSIDE CONTRACTING INCGeneral Contractor307/08/2026
GODFREY'S REFRIGERATIONGeneral Contractor203/21/2026
INTERBORO PROPERTY MGMTGeneral Contractor107/31/2026
AMC PLBG, HTG & CLNG, INCPlumbing109/16/2026
ADAMS, AElectrical103/21/2026
DEMAR MECHANICAL INCPlumbing107/08/2026
BIRNBAUM, ALANElectrical103/21/2026
INNER CITY CONTRACTINGElectrical103/21/2026
RONALD TESTA, JR.Electrical103/21/2026
SCHONDORF MICHAELElectrical103/21/2026
TOUGH STALLION LLCElectrical103/21/2026
ALL EMPIRE BUILDING CONGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ACE STRUCTURAL ENGINEERIN496608/04/2026
HOWARD L ZIMMERMAN ARCHIT1712309/14/2023
Building Lifecycle
All (150)Filed (15)Permit Issued (20)Signed Off (8)Violation (60)Inspection (5)Objection (12)Special Inspection (30)
09/04/2026
Permit issued — Plumbing
M01336478-S1-PL
08/14/2026
Objection resolved — Resolved
08/14/2026
Objection resolved — Resolved
08/13/2026
Objection raised — Mechanical
08/13/2026
Objection raised — Fire_Protection
08/04/2026
Filed — Alteration
MINOR RENOVATIONS TO THEATRICAL GALLERY, WINDOWS REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01336478-P1
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
07/31/2026
Special inspection requirement — Final
MARTIN COX
07/30/2026
Permit issued — General Construction
M01336478-I1-GC
04/20/2026
Objection resolved — Resolved
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/04/2026
Objection raised — Cost
03/03/2026
Objection raised — Scope
02/12/2026
Objection raised — Admin
02/12/2026
Objection raised — Admin
02/09/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/20/2026
Filed — Alteration
MINOR RENOVATIONS TO THEATRICAL GALLERY, WINDOWS REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01336478-S1
01/20/2026
Filed — Alteration
MINOR RENOVATIONS TO THEATRICAL GALLERY, WINDOWS REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01336478-I1
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/08/2025
Permit issued — Sidewalk Shed
M01281233-I1-SH
09/05/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATIONPROPOSED INSTALLATION OF HEAVY DUTY S
M01281233-I1
03/06/2025
Signed off — Alteration
MECHANICAL WORK AS PER PLANS FILED HEREWITH.
M00933827-S1
02/24/2025
Signed off — Alteration
MECHANICAL WORK AS PER PLANS FILED HEREWITH.
M00933827-I1
10/24/2024
Permit issued — Mechanical Systems
M00933827-S1-MS
01/29/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/2023
Permit issued — General Construction
M00933827-I1-GC
11/07/2023
Filed — Alteration
MECHANICAL WORK AS PER PLANS FILED HEREWITH.
M00933827-S1
11/06/2023
Filed — Alteration
MECHANICAL WORK AS PER PLANS FILED HEREWITH.
M00933827-I1
10/03/2023
Signed off — Alteration
EXTERIOR REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00487816-I1
09/19/2023
Special inspection requirement — Final
Howard Zimmerman
09/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Howard Zimmerman
09/19/2023
Special inspection requirement — Masonry
Howard Zimmerman
09/19/2023
Special inspection requirement — Post-installed Anchors
Howard Zimmerman
09/19/2023
Special inspection requirement — Air barrier - visual inspection
Howard Zimmerman
09/14/2023
Filed — Alteration
EXTERIOR REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00487816-P1
09/14/2023
Special inspection requirement — Interior lighting power
ANTHONY UGBEBOR
09/14/2023
Special inspection requirement — Mechanical Systems
ANTHONY UGBEBOR
09/14/2023
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY UGBEBOR
09/14/2023
Special inspection requirement — Final
MARTIN COX
09/14/2023
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY UGBEBOR
09/14/2023
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY UGBEBOR
09/14/2023
Special inspection requirement — Ventilation and air distribution system
ANTHONY UGBEBOR
09/14/2023
Special inspection requirement — Maintenance information
ANTHONY UGBEBOR
09/14/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY UGBEBOR
09/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANTHONY UGBEBOR
09/14/2023
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY UGBEBOR
09/14/2023
Special inspection requirement — Final
ANTHONY UGBEBOR
09/08/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00524863-I1
08/29/2023
Special inspection requirement — Post-installed Anchors
Howard Zimmerman
08/29/2023
Special inspection requirement — Masonry
Howard Zimmerman
08/29/2023
Special inspection requirement — Air barrier - visual inspection
Howard Zimmerman
08/29/2023
Special inspection requirement — Final
Howard Zimmerman
08/29/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Howard Zimmerman
07/10/2023
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00505337-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMC PLBG, HTG & CLNG, INC09/04/2026
DOB NOWGeneral ConstructionPermit IssuedINTERBORO PROPERTY MGMT07/30/2026
DOB NOWSidewalk ShedPermit IssuedALL EMPIRE BUILDING CON09/08/2025
DOB NOWMechanical SystemsSigned-offGODFREYS REFRIGERATION10/24/2024
DOB NOWGeneral ConstructionSigned-offBAYSIDE CONTRACTING INC11/29/2023
DOB NOWGeneral ConstructionSigned-offTRADITIONAL WATERPROOFING06/02/2023
DOB NOWSidewalk ShedSigned-offURBAN INTELLIGENCE, INC05/19/2023
DOB NOWGeneral ConstructionSigned-offTRADITIONAL WATERPROOFING05/11/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES04/19/2023
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC01/17/2023
DOB NOWGeneral ConstructionSigned-offBAYSIDE CONTRACTING INC01/03/2023
DOB NOWGeneral ConstructionSigned-offTRADITIONAL WATERPROOFING06/14/2022
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC05/18/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES04/19/2022
DOB NOWGeneral ConstructionSigned-offTRADITIONAL WATERPROOFING06/16/2021
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC05/21/2021
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES04/20/2021
DOB NOWSidewalk ShedPermit IssuedHI-TECH RESTORATION CORP12/23/2020
DOB NOWSidewalk ShedPermit IssuedHI-TECH RESTORATION CORP01/03/2020
DOB NOWSidewalk ShedPermit IssuedHI-TECH RESTORATION CORP07/15/2019
BISPLISSUEDKEW FOREST PLBG & HTG INC01/11/2022
BISPLISSUEDKEW FOREST PLBG & HTG INC04/20/2021
BISPLISSUEDSAFETY PLMBG & HTG LLC08/28/2012
BISMHISSUEDCONCEPT FINE INTERIOR INC.08/28/2012
BISOTISSUEDCONCEPT FINE INTERIOR INC.07/30/2012
BISMHISSUEDCONCEPT FINE INTERIOR INC.06/27/2012
BISPLISSUEDSAFETY PLMBG & HTG LLC07/20/2011
BISBLISSUEDAMOK INC10/07/2010
BISPLISSUEDAMOK INC06/30/2010
BISOTISSUEDHORIZON FINE INTERIOR,INC04/02/2010
BISMHISSUEDHORIZON FINE INTERIOR,INC04/02/2010
BISOTISSUEDHORIZON FINE INTERIOR,INC04/02/2010
BISPLISSUEDAMOK INC03/04/2010
BISSPISSUEDAMOK INC07/09/2009
BISEQISSUEDVERTICAL SCAFFOLD LLC.01/04/2008
BISOTISSUEDCLARK & WILKINS INDUSTRIES INC11/16/2007
BISPLISSUEDSAFETY PLMBG & HTG LLC10/23/2007
BISOTISSUEDHORIZON FINE INTERIORS INC05/21/2007
BISOTISSUEDHORIZON FINE INTERIORS INC05/21/2007
BISOTISSUEDHORIZON FINE INTERIORS INC04/11/2007
+ 11 more permits on file
1 project · most recent 08/04/2026
Water/Sanitary
FiledStatusContractorScope
08/04/2026Permit IssuedACTION&A1 PLBG AND HTG COWater/Sanitary
5 projects · most recent 08/31/2026
General Wiring
FiledStatusContractorScope
08/31/2026Permit IssuedJASON SALOME ELEC'L CONTGGeneral Wiring
04/29/2021Complete5 J'S ELECTL CONTS CORP—
03/17/2021Permit IssuedROBERT CHIMENTI3 meters, 1 new_meters
12/30/2019Permit IssuedSTAR ELEC'L CONTRACTORS C—
10/03/2019Permit IssuedRICHARD NEU—
1 project · most recent 09/05/2025
Sidewalk Shed
FiledStatusContractorScope
09/05/2025Permit IssuedALL EMPIRE BUILDING CONSidewalk Shed
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/09/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
07/31/2026Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
07/31/2026FinalMARTIN COXprogress
01/20/2026Fire-Resistant Penetrations and Joints—special
09/19/2023FinalHoward Zimmermanprogress
09/19/2023Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
09/19/2023MasonryHoward Zimmermanspecial
09/19/2023Post-installed AnchorsHoward Zimmermanspecial
09/19/2023Air barrier - visual inspectionHoward Zimmermanenergy_progress
09/14/2023Interior lighting powerANTHONY UGBEBORenergy_progress
09/14/2023Mechanical SystemsANTHONY UGBEBORspecial
09/14/2023Energy Code Compliance InspectionsANTHONY UGBEBORprogress
09/14/2023FinalMARTIN COXprogress
09/14/2023HVAC-R and service water heating system controlsANTHONY UGBEBORenergy_progress
09/14/2023HVAC-R and service water heating equipmentANTHONY UGBEBORenergy_progress
09/14/2023Ventilation and air distribution systemANTHONY UGBEBORenergy_progress
09/14/2023Maintenance informationANTHONY UGBEBORenergy_progress
09/14/2023HVAC-R and service water piping design and insulationANTHONY UGBEBORenergy_progress
09/14/2023Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
09/14/2023Energy Code Compliance InspectionsANTHONY UGBEBORprogress
09/14/2023FinalANTHONY UGBEBORprogress
08/29/2023Post-installed AnchorsHoward Zimmermanspecial
08/29/2023MasonryHoward Zimmermanspecial
08/29/2023Air barrier - visual inspectionHoward Zimmermanenergy_progress
08/29/2023FinalHoward Zimmermanprogress
08/29/2023Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
Latest 25 of 33.
▾Documents — 215 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch14
09/03/2026M00505337-I1Request digital key ↗
09/03/2026M00524863-I1Request digital key ↗
09/03/2026M00524863-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00188935-I1Request digital key ↗
▸Applications & Permits46
▸BISPLAN / WORK APPROVAL APPLICATION22
02/09/2022140933006Open ↗
11/09/2021120742081Open ↗
09/21/2021121126101Open ↗
Showing 3 of 22 on file for this type
▸BISWORK PERMIT APPLICATION12
01/11/2022121126101Open ↗
04/21/2021104722285Open ↗
04/08/2021104722285Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWLPC Approval/Permit10
08/19/2026M01336478-P1Open ↗
08/13/2026M00782656-I1Open ↗
08/13/2026M00933827-S1Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
10/06/2020140933006Open ↗
10/06/2020140933006Open ↗
▸Seals & Professional Certifications60
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026M00487816-I1Open ↗
09/01/2026M00487816-I1Open ↗
08/28/2026M00782549-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00188935-I1Open ↗
09/03/2026M00524863-P1Open ↗
09/03/2026M00524863-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
07/31/2012121126101Open ↗
06/30/2011120742081Open ↗
10/18/2010120258764Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026M00487816-I1Open ↗
08/28/2026M00782549-I1Open ↗
08/25/2026M00487816-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPC FULL REPORT4
12/18/2007110023457Open ↗
12/17/2007110023457Open ↗
12/17/2007110023457Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/22/2011120742081Open ↗
07/19/2011120742081Open ↗
06/30/2011120742081Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/13/2020140933006Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
06/30/2011120742081Open ↗
▸Trade Schedules & Equipment25
▸BISEQUIPMENT USE PERMITS10
11/15/2021120742081Open ↗
11/15/2021120742081Open ↗
11/15/2021120742081Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING8
05/17/2021104722285Open ↗
05/13/2021104722285Open ↗
05/11/2021104722285Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
11/15/2021120742081Open ↗
11/03/2021120742081Open ↗
05/05/2010110023457Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/03/2010120258764Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
10/26/2017104722276Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
02/03/2010120258764Open ↗
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
08/13/2020140933006Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00188935-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/02/2026M00781490-I1Open ↗
09/01/2026M00782549-I1Open ↗
09/01/2026M00782656-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
06/30/2011120742081Open ↗
02/03/2010120258764Open ↗
12/17/2007110023457Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/14/2007110020343Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/06/2012121126101Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/20/2022121126101Open ↗
08/13/2020140933006Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/06/2012121126101Open ↗
▸BISTR8: Energy Code Progress Inspections1
07/31/2012121126101Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/20/2022121126101Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00487816-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00487816-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/20/2022121126101Open ↗
11/09/2021120742081Open ↗
11/03/2021120742081Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs17
▸BISADMINISTRATIVE OBJECTIONS5
07/06/2012121126101Open ↗
06/30/2011120742081Open ↗
02/03/2010120258764Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL4
07/19/2012121126101Open ↗
07/22/2011120742081Open ↗
06/30/2011120742081Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF3
07/21/2022121126101Open ↗
11/09/2021120742081Open ↗
10/26/2021104722285Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
07/21/2022121126101Open ↗
11/09/2021120742081Open ↗
05/12/2010110023457Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
01/11/2022121126101Open ↗
▸BISSUPERSEDING LETTER1
04/21/2021104722285Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT5
08/13/2020140933006Open ↗
07/06/2012121126101Open ↗
06/30/2011120742081Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
07/20/2022121126101Open ↗
11/03/2021120742081Open ↗
10/26/2021104722285Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION7
05/17/2021104722285Open ↗
03/22/2021104722285Open ↗
11/10/2020140933006Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET3
07/06/2012121126101Open ↗
06/30/2011120742081Open ↗
02/03/2010120258764Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/13/2020140933006Open ↗
▸Other Documents5
▸DOB NOWProof of Historic Building2
08/19/2026M01336478-P1Open ↗
08/13/2026M01336478-I1Open ↗
▸BISSupporting Document: Fee Exempt1
05/11/2010110023457Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
07/31/2012121126101Open ↗
▸DOB NOWDHCR Document1
08/13/2026M00188935-I1Open ↗