← Back
BuildNYC
Parochial school, yeshiva
Uta 590
590 BEDFORD AVENUE · BIN 3060113
💬 Discuss this project
1982Year Built
2Stories
W2Building Class
R7-1Zoning
36,468 sfGross Floor Area
1Units
LL97 Covered1 Active Violation 2 old, status unconfirmed ▸FDNY Report ↗
Parochial school, yeshiva · Owner of record: Congregation Yetev Lev D'Satmar · 41,345 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Site & exterior6 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
United Talmudical Academy603/22/2026
UTA103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG Engineering110/07/2024
Jeffrey Kamen Architect409/12/2023
Paul Perdek, Professional Engineering209/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAC Developers Group503/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold603/21/2026
Core Scaffold Systemsspecialty_contractor303/21/2026
Mod ConsultantsGeneral Contractor303/21/2026
Express Builders JBGeneral Contractor107/08/2026
Skyward DevelopersGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY1258110/07/2024
Regional Testing394209/12/2023
Leo Y Lee Associates2481209/07/2023
Building Lifecycle
All (74)Filed (7)Permit Issued (5)Signed Off (4)Violation (18)Objection (13)Special Inspection (14)
04/10/2026
Closed: Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
DOB violation · closed on the city's record
12/30/2025
Boiler inspection report filed
Initial · no defects · Pre-filing
02/25/2025
1RCNY 103-09(e). Failure to file a retaining wall condition assessmentreport by the deadline as required by 1RCNY 103-09(e)(2) and (5). To date,…
ECB violation · closed
12/26/2024
Boiler inspection report filed
Initial · no defects · Accepted
11/13/2024
Signed off — Alteration
MECHANICAL APPLICATION FILED FOR THE INSTALLATION AND RENEWAL OF EUP/COC FOR OUTDOOR CONDENSER UNITS ON EXISTING DUNNAGE.
B01120136-I1
11/07/2024
Permit issued — Mechanical Systems
B01120136-I1-MS
10/16/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00929923-I1
10/07/2024
Filed — Alteration
MECHANICAL APPLICATION FILED FOR THE INSTALLATION AND RENEWAL OF EUP/COC FOR OUTDOOR CONDENSER UNITS ON EXISTING DUNNAGE.
B01120136-I1
10/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
SOORJBALLY HARILALL
10/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
10/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
SOORJBALLY HARILALL
10/07/2024
Special inspection requirement — Maintenance information
SOORJBALLY HARILALL
10/07/2024
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
10/01/2024
Special inspection requirement — Final
SOORJBALLY HARILALL
10/01/2024
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
09/27/2024
Permit renewed — Protection and Mechanical Methods
Renewed without changes
B00929923-I1-PMM
06/06/2024
FPS-02-02: Failed to obtain approval from agency having jurisdiction for alteration to the existing fire protection and/or communication system, in…
FDNY_ORDER violation · closed
03/25/2024
Permit expired, never signed off — Structural
The city's record still shows this permit as issued, with no sign-off on its filing
B00932119-I1-ST
12/11/2023
Boiler inspection report filed
Initial · no defects · Accepted
09/28/2023
Permit issued — Protection and Mechanical Methods
B00929923-I1-PMM
09/22/2023
Permit issued — Structural
B00932119-I1-ST
09/20/2023
Objection resolved — Addressed
09/19/2023
Objection raised — Other
09/19/2023
Objection resolved — Addressed
09/14/2023
Objection raised — Other
09/14/2023
Objection resolved — Addressed
09/14/2023
Objection resolved — Addressed
09/13/2023
Objection raised — Admin
09/13/2023
Objection resolved — Addressed
09/13/2023
Objection raised — Fire_Protection
09/13/2023
Objection raised — Inspections
09/13/2023
Objection raised — Structural
09/13/2023
Objection resolved — Addressed
09/13/2023
Objection raised — Inspections
09/12/2023
Filed — No Work
B00932128-I1
09/12/2023
Filed — Alteration
Erection of a temporary tent, stage and bleachers in conjunction with a temporary place of assembly for a holiday use.
B00932119-I1
09/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
09/11/2023
Special inspection requirement — Final
Paul Raymond
09/07/2023
Filed — Alteration
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00929923-I1
12/15/2022
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
DOB violation · closed · Issued 2022; DOB's record still lists it as active
11/29/2022
Signed off — Alteration
B08013056-I1
11/25/2022
Signed off — Alteration
B08014209-I1
11/25/2022
Boiler inspection report filed
Initial · no defects · Accepted
10/06/2022
Permit issued — Structural
B08014209-I1-ST
10/05/2022
Permit issued — General Construction
B08013056-I1-GC
10/03/2022
Filed — Alteration
B08013056-I1
10/03/2022
Filed — Alteration
B08014209-I1
10/03/2022
Filed — No Work
B08014359-I1
10/03/2022
Special inspection requirement — Final
Paul Raymond
10/03/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Raymond
09/30/2022
Work w/o a permit. At time of inspection observed 12 men working on top of an existing and unpermitted 85'l X78'w X27'h platform. Constructing an…
ECB violation · closed
09/29/2022
At time of inspection observed at corner yard of bedford ave & williamsburg st w, erected pipe scaffold structure approx. 85'l X78'w X27'h.…
ECB violation · closed
09/29/2022
Special inspection requirement — Post-installed Anchors
Leo Lee
09/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Leo Lee
09/29/2022
Special inspection requirement — Final
Paul Perdek
12/22/2021
Boiler inspection report filed
Initial · no defects · Accepted
08/02/2021
Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · open · Issued 2021; DOB's record still lists it as active
06/02/2021
Failure to file benchmarking report of energy use as per ad. Code sec. 28-309.4
DOB violation · open · Issued 2021; DOB's record still lists it as active
12/28/2020
Boiler inspection report filed
Initial · defects found · Accepted
12/28/2020
Boiler inspection report filed
Initial · no defects · Accepted
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Mod Consultants—
DOB NOW—Core Scaffold Systems—
DOB NOW—Core Scaffold Systems—
DOB NOW—Express Builders JB—
DOB NOW—Skyward Developers—
DOB NOW—Core Scaffold Systems—
BIS—United Talmudical Academ—
BIS—United Talmudical Academy—
BIS—Lund Fire Products Co—
BIS—Lund Fire Products Co—
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/28/2026B08014209-I1Request the plans ↗
08/28/2026B08013056-I1Request the plans ↗
08/26/2026B00932119-I1Request the plans ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
08/28/2026B08014359-I1Request the plans ↗
08/26/2026B00932128-I1Request the plans ↗
▸Applications & Permits8
▸BISPLACE OF ASSEMBLY5
02/01/2020321147558Open ↗
08/26/2016321147558Open ↗
10/02/2015321147558Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
05/13/2010320164923Open ↗
05/05/2010320152062Open ↗
▸BISWORK PERMIT APPLICATION1
06/11/2010320164923Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B08014209-I1Open ↗
08/23/2026B01120136-I1Open ↗
08/13/2026B08014359-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
02/01/2020321147558Open ↗
02/01/2020321147558Open ↗
08/26/2016321147558Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026B08013056-I1Open ↗
08/27/2026B08014209-I1Open ↗
08/25/2026B01120136-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B08013056-I1Open ↗
08/27/2026B08014209-I1Open ↗
08/25/2026B01120136-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/05/2010320152062Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/05/2010320152062Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/13/2010320164923Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/13/2010320164923Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/05/2010320152062Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B08013056-I1Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
02/01/2020321147558Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/13/2026B08014209-I1Open ↗
08/13/2026B01120136-I1Open ↗
08/13/2026B08014359-I1Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
05/13/2010320164923Open ↗
05/05/2010320152062Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/13/2010320164923Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
05/13/2010320164923Open ↗
05/05/2010320152062Open ↗
▸BISADDITIONAL INFORMATION1
05/08/2018321147558Open ↗