← Back
Other college and university
Peggy Plaza
590 EAST 68 STREET · Upper East Side-Lenox Hill-Roosevelt Island · BIN 1090765
💬 Discuss this project
1940Year Built
6Stories
W6Building Class
R9Zoning
1,200,000 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized44 Open Violations 27 unresolved · 17 paperwork only ▸FDNY Report ↗
Other college and university · 445,942 sf lot · 2.69 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Permit Issued — active, not yet Signed-off
CellarUnder Construction16p · 4 filings · 17 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BR+A CONSULTING ENGINEERS307/24/2026
OCULUS CONSULTING GROUP106/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE ROCKEFELLER UNIVERSITYGeneral Contractor208/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JAJ ENGINEERING PLLC930407/24/2026
Building Lifecycle
All (28)Filed (4)Permit Issued (2)Violation (10)Special Inspection (12)
08/20/2026
Permit issued — Mechanical Systems
M01399707-I1-MS
07/24/2026
Filed — Alteration
SPRINKLER MODIFICATIONS TO PIT INSTRUMENT SHOP/OFFICE (CELLAR "A FLOOR LEVEL") PLAZA BUILDING - ROCKEFELLER UNIVERSITY AS PER DRAWINGS. NO CHANGE IN, USE OCCUPANCY OR EGRESS
M01399711-I1
07/24/2026
Filed — Alteration
MECHANICAL MODIFICATIONS TO PIT INSTRUMENT SHOP/OFFICE (CELLAR "A FLOOR LEVEL") PLAZA BUILDING - ROCKEFELLER UNIVERSITY AS PER DRAWINGS. NEW AIR HANDLER UNIT. NEW EXHAUST FAN. MISC PIPING & DUCTWORK. NO CHANGE IN, USE OCCUPANCY OR EGRESS
M01399707-I1
07/24/2026
Filed — Alteration
PLUMBING MODIFICATIONS TO PIT INSTRUMENT SHOP/OFFICE (CELLAR "A FLOOR LEVEL") PLAZA BUILDING - ROCKEFELLER UNIVERSITY AS PER DRAWINGS. NO CHANGE IN, USE OCCUPANCY OR EGRESS
M01399686-I1
07/10/2026
Permit issued — General Construction
M01399670-I1-GC
06/23/2026
Filed — Alteration
RENOVATION TO PIT INSTRUMENT SHOP/OFFICE (CELLAR "A FLOOR LEVEL") PLAZA BUILDING - ROCKEFELLER UNIVERSITY. NEW NON-BEARING PARTITIONS. NEW SUSP CEILING IN SELECTED AREAS. NEW CABINETS, COUNTERS & FINISHES AS PER DWGS. NO CHANGE IN, USE OCCUPANCY OR EGRESS
M01399670-I1
05/11/2026
Special inspection requirement — Electrical motors and elevators
Joseph Jabour
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
05/08/2026
Special inspection requirement — Mechanical Systems
Joseph Jabour
05/08/2026
Special inspection requirement — Final
Joseph Jabour
05/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Joseph Jabour
05/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Joseph Jabour
05/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Jabour
05/08/2026
Special inspection requirement — Maintenance information
Joseph Jabour
05/08/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Joseph Jabour
05/08/2026
Special inspection requirement — Sprinkler Systems
Joseph Jabour
05/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Jabour
06/23/2025
Violation issued (FDNY_NOV, closed)
02/09/2023
Violation issued (FDNY_ORDER, closed)
02/09/2023
Violation issued (FDNY_ORDER, closed)
02/09/2023
Violation issued (FDNY_ORDER, closed)
05/13/2020
Violation issued (FDNY_NOV, closed)
07/08/2016
Violation issued (FDNY_NOV, closed)
03/31/2011
Violation issued (FDNY_NOV, closed)
10/02/2010
Violation issued (FDNY_NOV, closed)
01/28/2010
Violation issued (FDNY_ORDER, closed)
08/17/2000
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTHE ROCKEFELLER UNIVERSITY08/20/2026
DOB NOWGeneral ConstructionPermit IssuedTHE ROCKEFELLER UNIVERSITY07/10/2026
1 project · most recent 07/24/2026
Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
07/24/2026Permit IssuedTHE ROCKEFELLER UNIVERSITAir Conditioning Systems, Others
Cooling
York XTI-69x57 8,400 CFM · Ahu ×1
Other
Greenheck GREENHECK BSQ-240HP 7,200 CFM · Exhaust Fan ×1
1 project · most recent 07/24/2026
FiledStatusContractorScope
07/24/2026——8 heads
2 projects · most recent 07/24/2026
Water/Sanitary
FiledStatusContractorScope
07/24/2026———
07/24/2026——Water/Sanitary
1 project · most recent 10/14/2020
FiledStatusContractorScope
10/14/2020CompleteTOP SHELF ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/11/2026Electrical motors and elevatorsJoseph Jabourenergy_progress
05/08/2026Fire-Resistant Penetrations and JointsJoseph Jabourspecial
05/08/2026Fire-Resistant Penetrations and JointsJoseph Jabourspecial
05/08/2026Mechanical SystemsJoseph Jabourspecial
05/08/2026FinalJoseph Jabourprogress
05/08/2026Energy Code Compliance InspectionsJoseph Jabourprogress
05/08/2026HVAC-R and service water heating system controlsJoseph Jabourenergy_progress
05/08/2026HVAC-R and service water heating equipmentJoseph Jabourenergy_progress
05/08/2026Maintenance informationJoseph Jabourenergy_progress
05/08/2026HVAC-R and service water piping design and insulationJoseph Jabourenergy_progress
05/08/2026Sprinkler SystemsJoseph Jabourspecial
05/08/2026Fire-Resistant Penetrations and JointsJoseph Jabourspecial
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026M01399670-I1Request digital key ↗
08/16/2026M01399711-I1Request digital key ↗
08/16/2026M01399686-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026M01399670-I1Open ↗
08/16/2026M01399711-I1Open ↗
08/16/2026M01399686-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026M01399686-I1Open ↗
08/28/2026M01399711-I1Open ↗
08/23/2026M01399707-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026M01399707-I1Open ↗
08/23/2026M01399707-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/16/2026M01399670-I1Open ↗
08/16/2026M01399711-I1Open ↗
08/16/2026M01399686-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/16/2026M01399670-I1Open ↗
08/16/2026M01399711-I1Open ↗
08/16/2026M01399686-I1Open ↗