← Back
Over six families without stores
5901 4 AVENUE
BROOKLYN · BIN 3016264
💬 Discuss this project
1931Year Built
4Stories
C1Building Class
R7AZoning
6,389 sfGross Floor Area
10Units
Rent Stabilized18 Open Violations ▸FDNY Report ↗
Over six families without stores · 1,773 sf lot · 3.6 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof3p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
408 59TH STREET2507/08/2026
SAG CONTRACTING103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GESTURE INK ARCHITECTURE205/22/2025
KOJO SIMPSON ARCHITECT304/14/2025
ENTHINK ENGINEERS LLC209/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAG CONTRACTING CORPGeneral Contractor407/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor307/08/2026
FLINT MECHANICAL CORPPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AM DESIGN STUDIO LLC4413405/22/2025
KOJO SIMPSON ARCHITECT1664304/14/2025
Building Lifecycle
All (84)Filed (7)Permit Issued (9)Signed Off (5)Violation (31)Inspection (2)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/05/2025
Signed off — Alteration
Herewith filed for cap and removal of an existing boiler and hot water heater. Installation of new gas meters, plumbing equipment and fixtures with piping.
B08046127-S1
07/25/2025
Signed off — Alteration
HEREWITH FILED FOR INSTALLATION OF NEW COMBI-BOILERS.
B01158972-I1
07/03/2025
Signed off — Alteration
Herewith filed for cap and removal of an existing boiler and hot water heater. Installation of new gas meters, plumbing equipment and fixtures with piping.
B08046127-I1
06/05/2025
Violation issued (HPD, open)
A
05/22/2025
Filed — Alteration
Herewith filed for cap and removal of an existing boiler and hot water heater. Installation of new gas meters, plumbing equipment and fixtures with piping.
B08046127-P2
05/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALLENDE MATOS
05/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
05/22/2025
Special inspection requirement — Final
MEL SARKOR-CLINTON
05/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALLENDE MATOS
05/22/2025
Special inspection requirement — Lighting in dwelling units
MEL SARKOR-CLINTON
05/22/2025
Special inspection requirement — Insulation placement and R values
MEL SARKOR-CLINTON
05/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MEL SARKOR-CLINTON
05/22/2025
Special inspection requirement — Fenestration air leakage
MEL SARKOR-CLINTON
05/22/2025
Special inspection requirement — Lighting controls
MEL SARKOR-CLINTON
05/22/2025
Special inspection requirement — Interior lighting power
MEL SARKOR-CLINTON
05/21/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/16/2025
Permit issued — Boiler Equipment
B01158972-I1-BE
05/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALLENDE MATOS
05/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALLENDE MATOS
05/01/2025
Special inspection requirement — Final
MEL SARKOR-CLINTON
05/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALLENDE MATOS
05/01/2025
Special inspection requirement — Fenestration air leakage
MEL SARKOR-CLINTON
05/01/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MEL SARKOR-CLINTON
05/01/2025
Special inspection requirement — Insulation placement and R values
MEL SARKOR-CLINTON
05/01/2025
Special inspection requirement — Interior lighting power
MEL SARKOR-CLINTON
05/01/2025
Special inspection requirement — Lighting controls
MEL SARKOR-CLINTON
05/01/2025
Special inspection requirement — Lighting in dwelling units
MEL SARKOR-CLINTON
04/21/2025
Special inspection requirement — Maintenance information
KOJO SIMPSON
04/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
KOJO SIMPSON
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KOJO SIMPSON
04/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
KOJO SIMPSON
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
KOJO SIMPSON
04/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
KOJO SIMPSON
04/14/2025
Filed — Alteration
HEREWITH FILED FOR INSTALLATION OF NEW COMBI-BOILERS.
B01158972-I1
04/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
KOJO SIMPSON
04/11/2025
Filed — Alteration
Herewith filed for cap and removal of an existing boiler and hot water heater. Installation of new gas meters, plumbing equipment and fixtures with piping.
B08046127-P1
04/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
KOJO SIMPSON
03/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
KOJO SIMPSON
12/24/2024
Permit issued — General Construction
B08046127-I1-GC
12/10/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/06/2024
Permit issued — Plumbing
B08046127-S1-PL
11/27/2024
Violation issued (HPD, open)
I
07/18/2024
Permit issued — Plumbing
B08046127-S1-PL
04/23/2024
Signed off — Alteration
B00745688-I1
04/23/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00916907-I1
04/03/2024
Violation issued (HPD, open)
A
02/11/2024
Filed — Alteration
Herewith filed for cap and removal of an existing boiler and hot water heater. Installation of new gas meters, plumbing equipment and fixtures with piping.
B08046127-S1
01/02/2024
Permit issued — General Construction
B08046127-I1-GC
11/21/2023
Violation issued (HPD, open)
I
09/26/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00916907-I1
09/26/2023
Permit issued — Supported Scaffold
B00916907-I1-SF
06/14/2023
Permit issued — Sidewalk Shed
B00745688-I1-SH
06/09/2023
Violation issued (ECB, closed)
Construction
06/02/2023
Permit issued — General Construction
B08046127-I1-GC
03/17/2023
Violation issued (HPD, open)
A
12/16/2022
Filed — Alteration
Herewith filed for cap and removal of an existing boiler and hot water heater. Installation of new gas meters, plumbing equipment and fixtures with piping.
B08046127-I1
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offFLINT MECHANICAL CORP05/16/2025
DOB NOWGeneral ConstructionSigned-offSAG CONTRACTING CORP12/24/2024
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP12/06/2024
DOB NOWPlumbingSigned-offFLINT MECHANICAL CORP07/18/2024
DOB NOWGeneral ConstructionSigned-offSAG CONTRACTING CORP01/02/2024
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/26/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/14/2023
DOB NOWGeneral ConstructionSigned-offSAG CONTRACTING CORP06/02/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC06/22/2022
2 projects · most recent 07/07/2023
General Wiring
FiledStatusContractorScope
07/07/2023Permit IssuedA & R ELEC'L CONTR'G INC.General Wiring
05/26/2022CompleteBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/21/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/10/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
05/22/2025Tenant Protection Plan ComplianceALLENDE MATOSspecial
05/22/2025Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
05/22/2025FinalMEL SARKOR-CLINTONprogress
05/22/2025Fire-Resistance Rated ConstructionALLENDE MATOSprogress
05/22/2025Lighting in dwelling unitsMEL SARKOR-CLINTONenergy_progress
05/22/2025Insulation placement and R valuesMEL SARKOR-CLINTONenergy_progress
05/22/2025Fenestration and door U-factor and product ratingsMEL SARKOR-CLINTONenergy_progress
05/22/2025Fenestration air leakageMEL SARKOR-CLINTONenergy_progress
05/22/2025Lighting controlsMEL SARKOR-CLINTONenergy_progress
05/22/2025Interior lighting powerMEL SARKOR-CLINTONenergy_progress
05/01/2025Fire-Resistant Penetrations and JointsALLENDE MATOSspecial
05/01/2025Tenant Protection Plan ComplianceALLENDE MATOSspecial
05/01/2025FinalMEL SARKOR-CLINTONprogress
05/01/2025Fire-Resistance Rated ConstructionALLENDE MATOSprogress
05/01/2025Fenestration air leakageMEL SARKOR-CLINTONenergy_progress
05/01/2025Fenestration and door U-factor and product ratingsMEL SARKOR-CLINTONenergy_progress
05/01/2025Insulation placement and R valuesMEL SARKOR-CLINTONenergy_progress
05/01/2025Interior lighting powerMEL SARKOR-CLINTONenergy_progress
05/01/2025Lighting controlsMEL SARKOR-CLINTONenergy_progress
05/01/2025Lighting in dwelling unitsMEL SARKOR-CLINTONenergy_progress
04/21/2025Maintenance informationKOJO SIMPSONenergy_progress
04/21/2025HVAC-R and service water heating equipmentKOJO SIMPSONenergy_progress
04/21/2025Fire-Resistant Penetrations and JointsKOJO SIMPSONspecial
04/21/2025Tenant Protection Plan ComplianceKOJO SIMPSONspecial
04/21/2025Energy Code Compliance InspectionsKOJO SIMPSONprogress
Latest 25 of 35.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026B00745688-I1Request digital key ↗
08/26/2026B00916907-I1Request digital key ↗
08/21/2026B01158972-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026B08046127-S1Open ↗
09/01/2026B08046127-S1Open ↗
09/01/2026B08046127-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/29/2026B00745688-I1Open ↗
08/21/2026B08046127-I1Open ↗
08/21/2026B08046127-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026B01158972-I1Open ↗
09/01/2026B08046127-S1Open ↗
09/01/2026B08046127-S1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026B08046127-I1Open ↗
08/21/2026B08046127-P2Open ↗
08/21/2026B08046127-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B08046127-S1Open ↗