Single or multiple dwelling with stores or offices
5901 7 AVENUE
BROOKLYN · BIN 3016394
💬 Discuss this project
1922Year Built
3Stories
S9Building Class
R7AZoning
4,841 sfGross Floor Area
6Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 5901 INVESTOR LLC · 1,613 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 3Under Construction28p · 1 filing · 20 docs
Floor 2Under Construction23p · 1 filing · 20 docs
Floor 1Under Construction1p · 2 filings · 20 docs
CellarUnder Construction36p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ALY REALTY MANAGEMENT2607/08/2026
SSP CONSTRUCTION407/08/2026
ATLAS NY CONSTRUCTION407/08/2026
5901 INVESTOR LLC203/22/2026
NEWLAND CONSTRUCTION203/22/2026
YIN KEAT HOI 98 CONSTRUCT103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2024$3.5M—— → —$723/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MW PROFESSIONAL ENGINEERING, P.C.307/20/2026
CLIP ARCHITECTS103/30/2026
BASSIRI307/08/2025
SIMON JIANG1212/21/2024
JIAN ENGINEERING PLLC111/08/2024
NYX ENGINEERING, PLLC110/02/2020
HARRY TENENBAUM,PE102/25/2020
ASHRAF CORP105/13/2019
GREEN DESIGN111/12/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MS2403/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
ECDESIGN STUDIO603/21/2026
JRK CREATIVE203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GENESIS NYC CONSTRUCTIONGeneral Contractor608/26/2026
PREMIER FLOW PLBG AND HTGPlumbing307/08/2026
PREMIER FLOW PLBG HTGGeneral Contractor303/22/2026
ATLAS NY CONSTRUCTION CORPGeneral Contractor207/08/2026
LONG SHOT CRANEScaffold107/08/2026
HI-RITE ELECTRIC CORPElectrical103/22/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
AMM GEN'L CONTRACTING.INCFire Protection106/28/2026
AMM GEN'L CONTRACTING INCPlumbing106/28/2026
CONTROL PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MW PROFESSIONAL ENGINEERI570307/20/2026
GREAT WALL CONSULTANT P.E5633103/30/2026
SIMON75551212/21/2024
JIAN ENGINEERING PLLC7397111/08/2024
S M TAM ARCHITECT, PLLC1666102/25/2020
Building Lifecycle
All (121)Filed (24)Permit Issued (12)Signed Off (5)Violation (37)Inspection (13)Special Inspection (30)
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/21/2026
Special inspection requirement — Sprinkler Systems
MING WAI WONG
07/20/2026
Filed — Alteration
File sprinkler application in cellar. No change of use, egress or occupancy.
B01382833-P1
07/20/2026
Permit issued — Structural
B01133689-S1-ST
07/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/20/2026
Special inspection requirement — Sprinkler Systems
MING WAI WONG
06/26/2026
Permit issued — Boiler Equipment
B01035581-S3-BE
06/26/2026
Permit issued — Sprinklers
B01382833-I1-EW-SP
06/15/2026
Filed — Alteration CO
FILING THIS APPLICATION TO CONVERT EXISTING CELLAR TO BE COMMERCIAL SPACE. OBTAIN NEW C OF O.
B01133689-S1
05/19/2026
Permit issued — General Construction
B01133689-I1-GC
04/07/2026
Filed — Alteration
File sprinkler application in cellar. No change of use, egress or occupancy.
B01382833-I1
03/30/2026
Filed — Alteration
Install a new stair from first floor to cellar and new toilet in cellar. Install one additional bathroom for apartment 2F & 3F. Renovate existing bathroom & existing kitchen area for apartment 2F.
B01035581-S3
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
03/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
Xiong Wei Wu
12/25/2025
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
10/01/2025
Special inspection requirement — Maintenance information
JIAN DENG
07/18/2025
Signed off — Alteration
INSTALL NEW ILLUMINATED SIGN READ "AI OPTICALS"AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01157919-I1
07/17/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
07/08/2025
Filed — Alteration
INSTALL NEW ILLUMINATED SIGN READ "AI OPTICALS"AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01157919-P2
06/12/2025
Permit issued — Sign
B01157919-I1-SG
06/05/2025
Violation issued (HPD, closed)
A
05/07/2025
Special inspection requirement — Lighting controls
JIAN DENG
05/07/2025
Special inspection requirement — Interior lighting power
JIAN DENG
03/20/2025
Filed — Alteration
INSTALL NEW ILLUMINATED SIGN READ "AI OPTICALS"AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01157919-P1
12/24/2024
Special inspection requirement — Tenant Protection Plan Compliance
SIMON JIANG
12/24/2024
Special inspection requirement — Energy Code Compliance Inspections
SIMON JIANG
12/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMON JIANG
12/23/2024
Filed — Alteration
INSTALL NEW ILLUMINATED SIGN READ "AI OPTICALS"AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01157919-I1
12/21/2024
Filed — Alteration
Install a new stair from first floor to cellar and new toilet in cellar. Install one additional bathroom for apartment 2F & 3F. Renovate existing bathroom & existing kitchen area for apartment 2F.
B01035581-A1
12/19/2024
Violation issued (ECB, closed)
Construction
12/16/2024
Special inspection requirement — Energy Code Compliance Inspections
SIMON JIANG
12/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMON JIANG
12/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2024
Filed — Alteration
Install a new stair from first floor to cellar and new toilet in cellar. Install one additional bathroom for apartment 2F & 3F. Renovate existing bathroom & existing kitchen area for apartment 2F.
B01035581-P8
11/15/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/15/2024
Special inspection requirement — Energy Code Compliance Inspections
SIMON JIANG
11/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMON JIANG
11/08/2024
Filed — Alteration CO
FILING THIS APPLICATION TO CONVERT EXISTING CELLAR TO BE COMMERCIAL SPACE. OBTAIN NEW C OF O.
B01133689-I1
11/08/2024
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
11/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
11/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
11/08/2024
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
11/08/2024
Special inspection requirement — Fenestration air leakage
JIAN DENG
11/08/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
11/08/2024
Special inspection requirement — Insulation placement and R values
JIAN DENG
11/08/2024
Special inspection requirement — Fenestration areas
JIAN DENG
10/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
JIAN DENG
10/24/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/03/2024
Filed — Alteration
Install a new stair from first floor to cellar and new toilet in cellar. Install one additional bathroom for apartment 2F & 3F. Renovate existing bathroom & existing kitchen area for apartment 2F.
B01035581-P7
09/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/19/2024
Filed — Alteration
Install a new stair from first floor to cellar and new toilet in cellar. Install one additional bathroom for apartment 2F & 3F. Renovate existing bathroom & existing kitchen area for apartment 2F.
B01035581-P6
07/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SIMON JIANG
07/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
SIMON JIANG
06/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/12/2024
Filed — Alteration
Install a new stair from first floor to cellar and new toilet in cellar. Install one additional bathroom for apartment 2F & 3F. Renovate existing bathroom & existing kitchen area for apartment 2F.
B01035581-P5
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedGENESIS NYC CONSTRUCTION07/20/2026
DOB NOWBoiler EquipmentPermit IssuedAMM GEN'L CONTRACTING INC06/26/2026
DOB NOWSprinklersPermit IssuedAMM GEN'L CONTRACTING.INC06/26/2026
DOB NOWGeneral ConstructionPermit IssuedGENESIS NYC CONSTRUCTION05/19/2026
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC06/12/2025
DOB NOWPlumbingPermit IssuedGALICJA PLBG AND HTG.CORP05/13/2024
DOB NOWGeneral ConstructionPermit IssuedGENESIS NYC CONSTRUCTION04/25/2024
DOB NOWConstruction FencePermit IssuedGENESIS NYC CONSTRUCTION04/25/2024
DOB NOWSignSigned-offLONG SHOT CRANE LLC10/08/2020
DOB NOWPlumbingSigned-offCONTROL PLBG & HTG INC02/28/2020
DOB NOWSupported ScaffoldSigned-offATLAS NY CONSTRUCTION COR05/13/2019
DOB NOWSidewalk ShedSigned-offATLAS NY CONSTRUCTION COR11/13/2018
BISOTISSUEDPRIMO DESIGN & CONSTRUCTI10/20/2020
BISOTISSUEDYILIN CONSTRUCTION INC10/15/2020
BISPLISSUEDSO PLUMBING & HEATING INC04/29/2019
BISOTISSUEDSTAR UNIVERSE RENOVATION*04/08/2019
BIS—ISSUEDSUPERB PROPERTY MNG'T02/26/2019
BISEQISSUEDNEWLAND CONSTRUCTION INC08/30/2018
BISPLISSUEDTOP PLUMBING GROUP,INC03/20/2018
BISOTISSUEDNEWLAND CONSTRUCTION INC03/09/2018
BIS—ISSUEDNEWLAND CONSTRUCTION INC03/09/2018
BIS—ISSUEDNEWLAND CONSTRUCTION INC02/13/2018
BIS—ISSUEDNEWLAND CONSTRUCTION INC02/09/2018
BISPLISSUEDTOP PLUMBING GROUP,INC01/25/2018
BIS—ISSUEDNEWLAND CONSTRUCTION INC09/15/2017
BIS—ISSUEDNEWLAND CONSTRUCTION INC07/27/2017
BISEQISSUEDNEWLAND CONSTRUCTION INC07/12/2017
1 project · most recent 07/20/2026
FiledStatusContractorScope
07/20/2026Permit IssuedAMM GEN'L CONTRACTING.INC—
1 project · most recent 03/30/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/30/2026Permit IssuedAMM GEN'L CONTRACTING INCGas, Water/Sanitary
4 projects · most recent 05/09/2025
General Wiring Lighting
FiledStatusContractorScope
05/09/2025CompleteKJK ELECTRIC INC—
10/03/2019CompleteHI-RITE ELECTRIC CORPGeneral Wiring, Lighting
11/12/2018CompleteRICHARD NEU—
03/12/2018CompleteHI-RITE ELECTRIC CORPGeneral Wiring
1 project · most recent 06/15/2026
Steel
FiledStatusContractorScope
06/15/2026Permit IssuedGENESIS NYC CONSTRUCTIONSteel
1 project · most recent 03/30/2026
Fence
FiledStatusContractorScope
03/30/2026Permit IssuedAMM GEN'L CONTRACTING INCFence
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/17/2025Pass-Final Sign Permit InspectionPassView ↗
12/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2024Fail-Final General Construction Non-Directive 14FailView ↗
10/24/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/14/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2024Fail-Final CND-Occupancy InspectionFailView ↗
05/14/2024Fail-Final CND-Occupancy InspectionFailView ↗
04/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
07/21/2026Tenant Protection Plan Compliance—special
07/21/2026Sprinkler SystemsMING WAI WONGspecial
07/20/2026Tenant Protection Plan Compliance—special
07/20/2026Sprinkler SystemsMING WAI WONGspecial
03/24/2026Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
03/24/2026Tenant Protection Plan ComplianceXiong Wei Wuspecial
12/25/2025Air barrier - visual inspectionJIAN DENGenergy_progress
10/01/2025Maintenance informationJIAN DENGenergy_progress
05/07/2025Lighting controlsJIAN DENGenergy_progress
05/07/2025Interior lighting powerJIAN DENGenergy_progress
12/24/2024Tenant Protection Plan ComplianceSIMON JIANGspecial
12/24/2024Energy Code Compliance InspectionsSIMON JIANGprogress
12/24/2024Fire-Resistant Penetrations and JointsSIMON JIANGspecial
12/16/2024Energy Code Compliance InspectionsSIMON JIANGprogress
12/16/2024Tenant Protection Plan Compliance—special
12/16/2024Fire-Resistant Penetrations and JointsSIMON JIANGspecial
11/15/2024Tenant Protection Plan Compliance—special
11/15/2024Energy Code Compliance InspectionsSIMON JIANGprogress
11/15/2024Fire-Resistant Penetrations and JointsSIMON JIANGspecial
11/08/2024Fire-Resistance Rated ConstructionJIAN DENGprogress
11/08/2024Fire-Resistant Penetrations and JointsJIAN DENGspecial
11/08/2024Structural Stability – Alterations of existing buildingsJIAN DENGspecial
11/08/2024Energy Code Compliance InspectionsJIAN DENGprogress
11/08/2024Fenestration air leakageJIAN DENGenergy_progress
11/08/2024Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
Latest 25 of 50.
▾Documents — 260 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch19
09/03/2026B01382833-I1Request digital key ↗
09/03/2026B01382833-P1Request digital key ↗
09/02/2026B00098945-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/02/2026B00405766-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/02/2026B00166046-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00321729-I1Request digital key ↗
▸Applications & Permits27
▸BISWORK PERMIT APPLICATION15
10/20/2020340776155Open ↗
10/15/2020340773069Open ↗
04/30/2019340666309Open ↗
Showing 3 of 15 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
10/14/2020340776155Open ↗
10/05/2020340773069Open ↗
11/14/2019321186319Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/28/2019321186319Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
07/16/2020321186319Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/16/2020321186319Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01133689-I1Open ↗
▸Seals & Professional Certifications74
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/03/2026B01382833-P1Open ↗
09/03/2026B01382833-I1Open ↗
09/02/2026B00098945-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/29/2026B01133689-I1Open ↗
09/29/2026B01133689-I1Open ↗
09/14/2026B01035581-P9Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/29/2026B01133689-I1Open ↗
09/14/2026B01035581-P9Open ↗
09/14/2026B01035581-P9Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
06/04/2019340666309Open ↗
06/04/2019340666309Open ↗
05/29/2018321698999Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/14/2020340776155Open ↗
10/05/2020340773069Open ↗
03/09/2018321698999Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
10/14/2020340776155Open ↗
10/05/2020340773069Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
10/14/2020340776155Open ↗
10/05/2020340773069Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/09/2018321698999Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
04/01/2019340666309Open ↗
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING3
04/01/2019340666309Open ↗
06/08/2017321186319Open ↗
05/12/2017321186319Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/22/2021321186319Open ↗
08/07/2020321186319Open ↗
▸BISEQUIPMENT USE PERMITS2
01/22/2021321186319Open ↗
08/07/2020321186319Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/09/2018321698999Open ↗
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes6
04/01/2019340666309Open ↗
05/02/2018321186319Open ↗
03/09/2018321698999Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan2
09/02/2026B00405766-I1Open ↗
08/13/2026B00321729-I1Open ↗
▸BISSTREET TREE CHECKLIST1
06/08/2017321186319Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/23/2026B01133689-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01133689-I1Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/03/2026B01382833-P1Open ↗
09/03/2026B01382833-I1Open ↗
08/23/2026B01133689-S1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
10/14/2020340776155Open ↗
04/01/2019340666309Open ↗
03/09/2018321698999Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
12/30/2020340776155Open ↗
12/16/2020340773069Open ↗
10/20/2020340776155Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
12/30/2020340776155Open ↗
12/16/2020340773069Open ↗
01/17/2020321186319Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
06/04/2019340666309Open ↗
06/04/2019340666309Open ↗
05/29/2018321698999Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/14/2020340776155Open ↗
10/05/2020340773069Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY9
12/30/2020340776155Open ↗
12/16/2020340773069Open ↗
10/20/2020340776155Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
07/14/2017321186319Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/29/2018321698999Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
08/07/2020321186319Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
07/14/2017321186319Open ↗
▸Approvals, Objections & Sign-offs18
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
12/30/2020340776155Open ↗
12/16/2020340773069Open ↗
08/07/2020321186319Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
10/29/2019321186319Open ↗
10/29/2019321186319Open ↗
09/19/2019321186319Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER1
02/27/2019321186319Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/08/2017321186319Open ↗
▸BISPROVIDE CERTIFIED INSTALLATION SMOKE & CARBON MONOXIDE DETECTOR LETTER.1
08/07/2020321186319Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT9
12/30/2020340776155Open ↗
12/16/2020340773069Open ↗
10/14/2020340776155Open ↗
Showing 3 of 9 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
02/27/2019321186319Open ↗
02/13/2018321186319Open ↗
02/09/2018321186319Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
07/16/2020321186319Open ↗
▸Filing & Intake Forms25
▸BISADDITIONAL INFORMATION14
12/30/2020340776155Open ↗
08/07/2020321186319Open ↗
07/16/2020321186319Open ↗
Showing 3 of 14 on file for this type
▸BISBOROUGH INTAKE FORM5
09/06/2019321186319Open ↗
08/28/2019321186319Open ↗
08/23/2019321186319Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/14/2020340776155Open ↗
10/05/2020340773069Open ↗
04/01/2019340666309Open ↗
▸BISEFILING COVER SHEET3
03/13/2018321698999Open ↗
06/08/2017321186319Open ↗
06/01/2017321186319Open ↗
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
08/07/2020321186319Open ↗
03/09/2018321186319Open ↗
▸DOB NOWProperty Ownership Certification1
08/23/2026B01133689-I1Open ↗