5902 59 STREET · BIN 3172049
💬 Discuss this project
1931Year Built
1Stories
P8Building Class
R6Zoning
7,310 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Library · 10,000 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof6p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DDC1607/08/2026
PEN ENTERPRISES103/22/2026
DEPARTMENT OF DESIGN CONSTRUCT203/21/2026
NYC DEPT. OF DESIGN AND CONST.203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHETYPE CONSULTANTS1203/21/2026
A1 EXPEDITING SERVICE803/21/2026
JMV ARCHITECT1203/21/2026
S R SOLAR DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PEN ENTERPRISES INCGeneral Contractor907/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor907/08/2026
ERIN CONSTRUCTION & DEVELOPMENTGeneral Contractor403/21/2026
PARKVIEW P&H INCPlumbing207/08/2026
CENTRAL AIR CONDITIONINGGeneral Contractor204/09/2026
DONNELLY MECHANICAL CORPGeneral Contractor203/21/2026
A & E PLUMBING CORPPlumbing107/08/2026
770 ELECTRIC CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EP INSPECTIONS AND COMMIS7079506/04/2026
OBAID MIAN849109/17/2025
NKM ENGINEERING PLLC6244107/09/2025
JPC LOGISTICS DBA JPCL EN351507/01/2024
Building Lifecycle
All (67)Filed (19)Permit Issued (23)Signed Off (11)Violation (6)Inspection (8)
07/29/2026
Signed off — Alteration
Brooklyn Public Library Ryder Branch Proposed Plumbing application to renovate existing plumbing fixtures.
B00994551-I1
07/09/2026
Signed off — Alteration
Brooklyn Public Library Ryder Branch Proposed Plumbing application to renovate existing plumbing fixtures.
B00994551-S2
06/04/2026
Filed — Alteration
Brooklyn Public Library Ryder Branch Proposed Plumbing application to renovate existing plumbing fixtures.
B00994551-P4
03/24/2026
Signed off — Alteration
Plumbing alterations at the ground floor and roof level; related work as per plans.
B00251381-I1
02/26/2026
Permit issued — Plumbing
B00251381-I1-PL
02/17/2026
Signed off — Alteration
Brooklyn Public Library Ryder Branch Proposed Plumbing application to renovate existing plumbing fixtures.
B00994551-S1
02/03/2026
Signed off — Alteration
B00251374-I1
01/22/2026
Signed off — Alteration
B00251379-I1
12/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/26/2025
Signed off — Alteration
Replacement of air conditioning units. All existing ductwork to remain as is. No change in use egress and occupancy
B01281067-I1
11/25/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01239539-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/28/2025
Permit issued — Solar
B01239539-I1-SL
09/19/2025
Permit issued — Mechanical Systems
B01281067-I1-MS
09/17/2025
Filed — Alteration
Replacement of air conditioning units. All existing ductwork to remain as is. No change in use egress and occupancy
B01281067-I1
09/10/2025
Permit issued — Mechanical Systems
B00994551-S1-MS
09/09/2025
Permit issued — General Construction
B00994551-I1-GC
07/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/09/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01239539-I1
07/01/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/11/2025
Permit issued — Plumbing
B00994551-S2-PL
05/08/2025
Signed off — Alteration
B00984065-I1
05/08/2025
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00902757-I1
05/08/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD STAIR TOWER AS PER DRAWINGS. PIPE SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00844348-I1
01/22/2025
Permit issued — Mechanical Systems
B00994551-S1-MS
11/21/2024
Permit issued — General Construction
B00994551-I1-GC
11/06/2024
Filed — Alteration
Brooklyn Public Library Ryder Branch Proposed Plumbing application to renovate existing plumbing fixtures.
B00994551-P1
11/05/2024
Filed — Alteration
Brooklyn Public Library Ryder Branch Proposed Plumbing application to renovate existing plumbing fixtures.
B00994551-P3
11/04/2024
Filed — Alteration
Brooklyn Public Library Ryder Branch Proposed Plumbing application to renovate existing plumbing fixtures.
B00994551-P2
09/27/2024
Permit issued — Supported Scaffold
B00844348-I1-SF
09/27/2024
Permit issued — Sidewalk Shed
B00902757-I1-SH
07/01/2024
Filed — Alteration
Plumbing alterations at the ground floor and roof level; related work as per plans.
B00251381-P3
06/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2024
Filed — Alteration
Plumbing alterations at the ground floor and roof level; related work as per plans.
B00251381-P2
05/16/2024
Permit issued — Plumbing
B45613685-I1-PL
05/01/2024
Permit issued — Structural
B00251374-I1-ST
05/01/2024
Permit issued — Mechanical Systems
B00251379-I1-MS
04/30/2024
Violation issued (FDNY_NOV, closed)
04/04/2024
Filed — Alteration
Brooklyn Public Library Ryder Branch Proposed Plumbing application to renovate existing plumbing fixtures.
B00994551-S1
03/29/2024
Filed — Alteration
Brooklyn Public Library Ryder Branch Proposed Plumbing application to renovate existing plumbing fixtures.
B00994551-I1
03/29/2024
Filed — Alteration
Brooklyn Public Library Ryder Branch Proposed Plumbing application to renovate existing plumbing fixtures.
B00994551-S2
01/02/2024
Filed — Alteration
B00984065-I1
01/02/2024
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00902757-P1
01/02/2024
Permit issued — Protection and Mechanical Methods
B00984065-I1-PMM
09/28/2023
Permit issued — Sidewalk Shed
B00902757-I1-SH
09/27/2023
Permit issued — Supported Scaffold
B00844348-I1-SF
09/13/2023
Violation issued (ECB, closed)
Construction
08/01/2023
Permit issued — Sidewalk Shed
B00902757-I1-SH
07/31/2023
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00902757-I1
06/17/2023
Permit issued — Mechanical Systems
B00251379-I1-MS
05/12/2023
Filed — Alteration
Plumbing alterations at the ground floor and roof level; related work as per plans.
B00251381-P1
04/26/2023
Permit issued — Structural
B00251374-I1-ST
04/26/2023
Permit issued — Mechanical Systems
B00251379-I1-MS
03/15/2023
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD STAIR TOWER AS PER DRAWINGS. PIPE SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00844348-I1
03/15/2023
Permit issued — Supported Scaffold
B00844348-I1-SF
09/12/2022
Permit issued — Structural
B00251374-I1-ST
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPARKVIEW P&H INC02/26/2026
DOB NOWSolarSigned-off770 ELECTRIC CORP10/28/2025
DOB NOWMechanical SystemsSigned-offDONNELLY MECHANICAL CORP09/19/2025
DOB NOWMechanical SystemsSigned-offCENTRAL AIR CONDITIONING09/10/2025
DOB NOWGeneral ConstructionSigned-offERIN CONSTRUCTION & DEVELOPMENT09/09/2025
DOB NOWPlumbingSigned-offA & E PLUMBING CORP06/11/2025
DOB NOWMechanical SystemsSigned-offCENTRAL AIR CONDITIONING01/22/2025
DOB NOWGeneral ConstructionSigned-offERIN CONSTRUCTION & DEVELOPMENT11/21/2024
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC09/27/2024
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC09/27/2024
DOB NOWPlumbingSigned-offPARKVIEW P&H INC05/16/2024
DOB NOWStructuralSigned-offPEN ENTERPRISES INC05/01/2024
DOB NOWMechanical SystemsSigned-offPEN ENTERPRISES INC05/01/2024
DOB NOWProtection and Mechanical MethodsSigned-offSAFWAY ATLANTIC, LLC01/02/2024
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC09/28/2023
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC09/27/2023
DOB NOWSidewalk ShedSigned-offSAFWAY ATLANTIC, LLC08/01/2023
DOB NOWMechanical SystemsSigned-offPEN ENTERPRISES INC06/17/2023
DOB NOWStructuralSigned-offPEN ENTERPRISES INC04/26/2023
DOB NOWMechanical SystemsSigned-offPEN ENTERPRISES INC04/26/2023
DOB NOWSupported ScaffoldSigned-offSAFWAY ATLANTIC, LLC03/15/2023
DOB NOWStructuralSigned-offPEN ENTERPRISES INC09/12/2022
DOB NOWMechanical SystemsSigned-offPEN ENTERPRISES INC09/12/2022
BISMHISSUEDVOLMAR CONSTRUCTION INC09/12/2002
BISPLISSUEDSTARLITE PLBG & HTG CORP03/20/2001
BISOTISSUEDVOLMAR CONSTRUCTION INC03/05/2001
BISMHISSUEDAIR COM AIR03/05/1993
1 project · most recent 06/04/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/04/2026Signed-offCENTRAL AIR CONDITIONINGHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Little Giant VCCA-20-P 7 CFM · Pump ×2
Ventilation
Titus Titus FL-10 14 CFM · Other ×1
Titus Omni 50 CFM · Exhaust Fan ×1
1 project · most recent 06/04/2026
Water/Sanitary
FiledStatusContractorScope
06/04/2026Signed-offA & E PLUMBING CORPWater/Sanitary
5 projects · most recent 12/23/2025
General Wiring
FiledStatusContractorScope
12/23/2025Permit IssuedMEDCO ELECL CONTRNG INCGeneral Wiring
06/11/2025CompleteGRID CITY ELECTRIC, CORP1 meters, 1 new_meters
01/22/2025CompleteVALENTIS ELECTRIC, INC.General Wiring
10/29/2024CompleteHATZEL AND BUEHLER, INCGeneral Wiring
07/28/2023CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/19/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
06/04/2026Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
06/04/2026Maintenance informationMOLLY GLENNenergy_progress
06/04/2026Air barrier - visual inspectionMOLLY GLENNenergy_progress
06/04/2026Insulation placement and R valuesMOLLY GLENNenergy_progress
06/04/2026Fenestration and door U-factor and product ratingsMOLLY GLENNenergy_progress
06/04/2026Fire-Resistance Rated ConstructionMOLLY GLENNprogress
06/04/2026Energy Code Compliance InspectionsMOLLY GLENNprogress
06/04/2026Structural Stability – Alterations of existing buildingsMOLLY GLENNspecial
09/03/2025HVAC-R and service water piping design and insulationObaid Mianenergy_progress
09/03/2025HVAC-R and service water heating equipmentObaid Mianenergy_progress
09/03/2025Maintenance informationObaid Mianenergy_progress
09/03/2025Mechanical SystemsObaid Mianspecial
09/03/2025FinalObaid Mianprogress
09/03/2025HVAC-R and service water heating system controlsObaid Mianenergy_progress
11/13/2024Interior lighting powerMOLLY GLENNenergy_progress
11/13/2024Maintenance informationMOLLY GLENNenergy_progress
11/13/2024HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
11/13/2024HVAC-R and service water heating system controlsMOLLY GLENNenergy_progress
11/13/2024Mechanical SystemsMOLLY GLENNspecial
11/13/2024Fire-Resistant Penetrations and JointsMOLLY GLENNspecial
11/13/2024Energy Code Compliance InspectionsMOLLY GLENNprogress
11/13/2024FinalMOLLY GLENNprogress
11/13/2024HVAC-R and service water piping design and insulationMOLLY GLENNenergy_progress
11/13/2024Lighting controlsMOLLY GLENNenergy_progress
11/13/2024HVAC-R and service water heating system controlsMOLLY GLENNenergy_progress
Latest 25 of 48.
▾Documents — 117 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch13
08/27/2026B00844348-I1Request digital key ↗
08/26/2026B00902757-P1Request digital key ↗
08/26/2026B00902757-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00251381-I1Request digital key ↗
09/02/2026B00251381-P3Request digital key ↗
09/02/2026B00251381-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00251374-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00251379-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION5
02/02/2026322005030Open ↗
09/23/2021322005030Open ↗
11/01/2019322005030Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/27/2026B00844348-I1Open ↗
08/26/2026B00902757-I1Open ↗
08/26/2026B00902757-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/21/2026B01281067-I1Open ↗
09/21/2026B01281067-I1Open ↗
09/21/2026B01281067-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/30/2026B00251381-I1Open ↗
09/21/2026B01281067-I1Open ↗
09/02/2026B00994551-S1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/01/2019322005030Open ↗
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
05/08/2018321510049Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/16/2026B00994551-S2Open ↗
08/16/2026B00994551-I1Open ↗
08/16/2026B00994551-S1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/17/2017321510049Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01239539-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/01/2023322005030Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/01/2019322005030Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/01/2023322005030Open ↗
▸Approvals, Objections & Sign-offs30
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter19
08/26/2026B00984065-I1Open ↗
08/16/2026B00994551-P4Open ↗
08/13/2026B00902757-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)6
08/13/2026B00251381-I1Open ↗
08/13/2026B00251381-P1Open ↗
08/13/2026B00251381-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026B00251379-I1Open ↗
08/13/2026B00251381-I1Open ↗
08/13/2026B00251374-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/08/2018321510049Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01239539-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/01/2019322005030Open ↗
06/08/2018321510049Open ↗
01/17/2017321510049Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
11/01/2019322005030Open ↗
01/17/2017321510049Open ↗
▸BISBOROUGH INTAKE FORM1
06/08/2018321510049Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/18/2019322005030Open ↗