← Back
Over six families without stores
591 EAST 137 STREET
BRONX · Mott Haven-Port Morris · BIN 2003617
💬 Discuss this project
1931Year Built
3Stories
C1Building Class
R6Zoning
3,870 sfGross Floor Area
7Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Over six families without stores · Owner of record: 591 E137TH, LLC · 2,500 sf lot · 1.55 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Floor 39p · 2 filings · 20 docs
Floor 29p · 2 filings · 20 docs
Floor 113p · 4 filings · 20 docs
Cellar9p · 3 filings · 20 docs
Site & exterior6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO807/08/2026
591 E137TH, LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/12/2023$1.0M—— → —$258/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC1104/13/2026
ASR ENGINEERING PC206/26/2025
AUTOMATED DESIGN ENGINEERING, PLLC112/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
SION CONSULTING ENGINEERING P C1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JASCO, INCGeneral Contractor407/08/2026
PLBG P & H INCPlumbing407/08/2026
DAVILAS CONTRACTOR CORPGeneral Contractor203/21/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161104/13/2026
Building Lifecycle
All (139)Filed (14)Permit Issued (8)Signed Off (6)Violation (48)Inspection (13)Objection (20)Special Inspection (30)
08/27/2026
Signed off — Alteration
Install sprinkler system for alteration. The system is hydraulically calculated. There is no change in use, occupancy, or egress.
X00973158-I1
08/27/2026
Signed off — Alteration
INSTALLATION OF ONE (1) NEW GAS BOILER IN CONJUNCTION WITH ALTERATION APPLICATION# X00913158-I1
X01315784-I1
08/24/2026
Signed off — Alteration
Install sprinkler system for alteration. The system is hydraulically calculated. There is no change in use, occupancy, or egress.
X00973158-S1
08/20/2026
Signed off — Alteration
THIS APPLICATION IS FILED FOR THE INSTALLATION OF 12 SHOWER , 12 LAVATORY , 12 TOILET , 14 SINK , 2 HOT WATER HEATERS , 2 BOILERS AND 2 GAS METERS IN CONJUNCTION WITH ALTERATION APPLICATION #X00973158-I1
X00982205-I1
05/07/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/23/2026
Special inspection requirement — Heating Systems
SHAHRIAR QUAYYUM
04/13/2026
Filed — Alteration
INSTALLATION OF ONE (1) NEW GAS BOILER IN CONJUNCTION WITH ALTERATION APPLICATION# X00913158-I1
X01315784-P2
04/10/2026
Permit issued — Boiler Equipment
X01315784-S1-BE
03/20/2026
Filed — Alteration
INSTALLATION OF ONE (1) NEW GAS BOILER IN CONJUNCTION WITH ALTERATION APPLICATION# X00913158-I1
X01315784-S1
03/20/2026
Filed — Alteration
INSTALLATION OF ONE (1) NEW GAS BOILER IN CONJUNCTION WITH ALTERATION APPLICATION# X00913158-I1
X01315784-P1
03/20/2026
Special inspection requirement — Heating Systems
SHAHRIAR QUAYYUM
03/18/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/17/2026
Special inspection requirement — Heating Systems
SHAHRIAR QUAYYUM
03/16/2026
Inspection — Under Review Boiler Equipment Inspection
Under Review
View inspection ↗
03/04/2026
Permit issued — Boiler Equipment
X01315784-I1-BE
02/16/2026
Objection resolved — Addressed
02/16/2026
Objection resolved — Addressed
02/16/2026
Objection resolved — Addressed
02/12/2026
Permit issued — Plumbing
X00982205-I1-PL
01/21/2026
Objection raised — Admin
01/21/2026
Objection resolved — Addressed
01/12/2026
Filed — Alteration
THIS APPLICATION IS FILED FOR THE INSTALLATION OF 12 SHOWER , 12 LAVATORY , 12 TOILET , 14 SINK , 2 HOT WATER HEATERS , 2 BOILERS AND 2 GAS METERS IN CONJUNCTION WITH ALTERATION APPLICATION #X00973158-I1
X00982205-P3
01/12/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/12/2026
Objection resolved — Addressed
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/02/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2025
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
12/19/2025
Objection raised — Mechanical
12/19/2025
Objection raised — Fire_Protection
12/19/2025
Objection raised — Mechanical
12/19/2025
Objection raised — Plumbing
12/11/2025
Filed — Alteration
INSTALLATION OF ONE (1) NEW GAS BOILER IN CONJUNCTION WITH ALTERATION APPLICATION# X00913158-I1
X01315784-I1
12/11/2025
Filed — Alteration
THIS APPLICATION IS FILED FOR THE INSTALLATION OF 12 SHOWER , 12 LAVATORY , 12 TOILET , 14 SINK , 2 HOT WATER HEATERS , 2 BOILERS AND 2 GAS METERS IN CONJUNCTION WITH ALTERATION APPLICATION #X00973158-I1
X00982205-P2
12/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
12/05/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
11/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/11/2025
Permit issued — Sprinklers
X00973158-S1-EW-SP
08/26/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/25/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01247247-I1
08/25/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01240844-I1
06/26/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01247247-I1
06/26/2025
Permit issued — Supported Scaffold
X01247247-I1-SF
06/16/2025
Permit issued — Sidewalk Shed
X01240844-I1-SH
06/14/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01240844-I1
06/05/2025
Violation issued (HPD, closed)
A
03/31/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/26/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/26/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/26/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
03/26/2025
Special inspection requirement — Metering
FAHAD FATEH
03/26/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
03/26/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
03/26/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
03/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/26/2025
Special inspection requirement — Final
FAHAD FATEH
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offPLBG P & H INC04/10/2026
DOB NOWBoiler EquipmentSigned-offPLBG P & H INC03/04/2026
DOB NOWPlumbingSigned-offPLBG P & H INC02/12/2026
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC09/11/2025
DOB NOWSupported ScaffoldSigned-offJASCO, INC06/26/2025
DOB NOWSidewalk ShedSigned-offJASCO, INC06/16/2025
DOB NOWPlumbingSigned-offPLBG P & H INC12/10/2024
DOB NOWMechanical SystemsSigned-offDAVILAS CONTRACTOR CORP11/20/2024
1 project · most recent 03/20/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/20/2025Signed-offDAVILAS CONTRACTOR CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric HVAC Mitsubishi Split Ductless 36,000 BTU · Split System ×9
Ventilation
Powereng PW-BPT14-24E 150 CFM ×14
__Junk__ vent 150 CFM ×28
1 project · most recent 03/20/2025
FiledStatusContractorScope
03/20/2025Signed-offPLBG P & H INC51 heads
1 project · most recent 01/12/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/12/2026Signed-offPLBG P & H INCGas, Water/Sanitary
2 projects · most recent 07/26/2025
General Wiring
FiledStatusContractorScope
07/26/2025CompleteV. VASS ELECTRIC CORPGeneral Wiring
06/14/2025CompleteRICHARD NEU—
1 project · most recent 03/20/2025
Wood
FiledStatusContractorScope
03/20/2025Signed-offPLBG P & H INCWood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
05/07/2026Pass-Final Boiler Equipment InspectionPassView ↗
03/18/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/16/2026Under Review Boiler Equipment InspectionUnder ReviewView ↗
01/12/2026Fail-Final General Construction Non-Directive 14FailView ↗
01/02/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/30/2025Fail-Final SP - Up to 3 Requested FloorsFailView ↗
12/05/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
11/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/31/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
04/23/2026Heating SystemsSHAHRIAR QUAYYUMspecial
03/20/2026Heating SystemsSHAHRIAR QUAYYUMspecial
03/17/2026Heating SystemsSHAHRIAR QUAYYUMspecial
01/09/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/10/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/26/2025Interior lighting powerFAHAD FATEHenergy_progress
03/26/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/26/2025Fenestration air leakageFAHAD FATEHenergy_progress
03/26/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/26/2025MeteringFAHAD FATEHenergy_progress
03/26/2025Lighting controlsFAHAD FATEHenergy_progress
03/26/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
03/26/2025Fenestration areasFAHAD FATEHenergy_progress
03/26/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/26/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
03/26/2025FinalFAHAD FATEHprogress
03/26/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/26/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
03/26/2025Maintenance informationFAHAD FATEHenergy_progress
03/26/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
03/26/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/26/2025Permanent certificateFAHAD FATEHenergy_progress
03/26/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/26/2025Mechanical SystemsFAHAD FATEHspecial
03/26/2025Heating SystemsFAHAD FATEHspecial
Latest 25 of 47.
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/21/2026X00973158-P2Request digital key ↗
08/21/2026X00973158-P1Request digital key ↗
08/21/2026X00973158-S1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/21/2026X00973158-P2Open ↗
08/21/2026X00973158-S1Open ↗
08/21/2026X00973158-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/28/2026X00973158-I1Open ↗
08/27/2026X01315784-I1Open ↗
08/27/2026X01315784-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026X00973158-I1Open ↗
08/28/2026X00973158-I1Open ↗
▸Safety & Tenant Protection14
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist14
08/13/2026X00973158-S1Open ↗
08/13/2026X00982205-P1Open ↗
08/13/2026X00973158-P1Open ↗
Showing 3 of 14 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/21/2026X00973158-S1Open ↗
08/21/2026X00973158-P2Open ↗
08/21/2026X00973158-P1Open ↗
Showing 3 of 12 on file for this type